Download Creating an Implementation Plan and Documenting the

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
Creating an
Implementation
Plan and
Documenting the
Implementation
Planning Routing Services
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-1
Implementing Routing in the Network
Ad-hoc approach
 Identify the need for the implementation
 Implement routing in the network
Structured approach
 Create an implementation plan
 Implement the solution
 Document the implementation
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-2
Structured Approach
Well-known models and methodologies that can aid in
structuring the network implementation tasks include the
following:
 Cisco Lifecycle Services (PPDIOO)
 IT Infrastructure Library (ITIL)
 Fault, Configuration, Accounting, Performance, and Security
(FCAPS)
 Telecommunications Management Network (TMN)
Choose a model with elements that fit your organization
as well as its business and technical needs.
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-3
Models and Tools
 Select the implementation
model
 Adapt the model to your
organization’s needs
 Select the tools supporting
the model
 Create the implementation
plan
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-4
Create the Implementation Plan
 Identify the required information for the plan:
– Network-specific information, activities, and tasks
– Dependencies of the existing installation
– Recommended resources
 Create the implementation plan
 Implement the solution
 Verify the implementation
 Create the documentation
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-5
Identify the Required Network
Information
 Existing topology, equipment, and software version
 IP addressing plan
 Scalability configuration (summarization, stub areas, and so on)
 List of advertized networks
 Link utilization
 Metric requirements for primary and backup links
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-6
Identify Other Requirements
 Site specific implementation requirements
 Dependencies on existing installation
 Configuration and verification commands
 Implementation schedule and resources
 Tools
Online Resources
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-7
Create the Implementation Plan
 Plan the work tasks
 Select the site-specific tools and configurations
 Configure and coordinate work with specialists
 Create verification tests
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-8
Implementation Plan Documentation
 Good documentation is a result of good processes and
procedures.
 Documentation must be:
– Correct
– Up-to-date
– Accessible
 Documentation must support:
– Future upgrades and changes
– Troubleshooting
– Reporting
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-9
What to Document?
 Network information
 Tools
 Resources
 Implementation plan tasks
 Verification tasks
 Performance measurement and results
 Screenshots and photos
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-10
Example: Implementation Plan
 Identify the existing situation and requirements
 Follow these steps to create an implementation plan:
– Plan
– Select the tools and resources
– Coordinate the work with specialists
– Verify
– Interpret the performance results
– Document the baseline, performance, and recommendation
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-11
Enterprise Network Topology Required
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-12
Identify Network Information and
Requirements
 Existing topology, equipment, and software version
 IP addressing plan, configuration, and link utilization
 Requirements for:
– Connectivity and configuration
– Protection and optimization
– Security and remote access
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-13
Creation of the Implementation Plan
 Create an implementation plan and document it
– Project contact list
– Location information
– Tasks and detailed descriptions
– Verification steps
– Representation of the results
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-14
Summary
 Using well known models and methodologies can aid in
structuring the network implementation tasks and creating an
implementation plan.
 An implementation plan consists of the project and network
overview, required tools, and information, as well as the
implementation tasks.
 The tasks in the implementation plan provide a detailed
explanation of all actions that must be taken in order to configure
the network according to requirements.
 Good documentation is a result of good processes and
procedures, and includes performance testing and documentation
of results.
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-15
© 2009 Cisco Systems, Inc. All rights reserved.
ROUTE v1.0—1-16