* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download SLDR_everyones_slides
Mains electricity wikipedia , lookup
Buck converter wikipedia , lookup
Current source wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Electromagnetic compatibility wikipedia , lookup
Alternating current wikipedia , lookup
Opto-isolator wikipedia , lookup
Surge protector wikipedia , lookup
Automatic test equipment wikipedia , lookup
Rectiverter wikipedia , lookup
Earthing system wikipedia , lookup
System Level Design Presentation 12.07.06 Mobile Device Charger Sponsored by Liaison: Coach: Team: Len Horey Wenhsing Wu Alex Rodriguez Bryan Talenfeld Niraj Patel Peter Flores “Pree” Silva Agenda • Project Background • Previous Accomplishments (up to PDR) • Current Accomplishments (since PDR) – Revised concept – Circuit Design • • • • • Prototype Plans Testing Plans Issues Next Steps Questions 2 Agenda • Project Background • Previous Accomplishments (up to PDR) • Current Accomplishments (since PDR) – Revised concept – Circuit Design • • • • • Prototype Plans Testing Plans Issues Next Steps Questions 3 Project Background • Develop a device to charge the following common handheld electronics: – Cell phones – PDAs – MP3 players (especially iPods) • Primary Customer Needs – High value to end-user – Easy to use – Minimum liability – Minimum number of attachments • Major Constraints – Avoid patent infringements – Strive to cover 80% of market 4 Agenda • Project Background • Previous Accomplishments (up to PDR) • Current Accomplishments (since PDR) – Revised concept – Circuit Design • • • • • Prototype Plans Testing Plans Issues Next Steps Questions 5 Previous Accomplishments • Verified need for product – Identified end-user habits and practices • Established target device market – Identified device brands that will cover desired market share of 80% – Categorized devices by voltage and current inputs • Created patent database – Compiled relevant active patents – Established simple summaries for ease of use 6 Agenda • Project Background • Previous Accomplishments (up to PDR) • Current Accomplishments (since PDR) – Revised concept – Circuit Design • • • • • Prototype Plans Testing Plans Issues Next Steps Questions 7 Current Accomplishments • Acquired extended knowledge of chargers – Reverse engineered similar chargers – Completed external research • Completed hardware design – Revised concept – Circuit design and schematics • Prototype Plan • Testing Plan 8 Current Accomplishments Revised Concept Charging Device Charging Indicator /LED Power Battery Wall (AC) Existing Device “Charging” Fully Charged Output Selection Processor Attachments Static Outputs Individual Cable Circuit Slow Charge Rapid Charge Overcharge Protection Must withstand: - Temperature: 50 to 90 degrees Fahrenheit - Humidity: 25 to 95% RH - Constant use and possible abuse 9 Current Accomplishments Hardware Connections Wall (AC) Mobile device (cellphone) Overcharge Protection USB Port Device Adapter 10 Current Accomplishments Circuit Design and Schematics 11 Current Accomplishments Overcharge Protection • This circuit has the goal of protecting the device from overcharging • Still under development to achieve ideal conditions 12 Agenda • Project Background • Previous Accomplishments (up to PDR) • Current Accomplishments (since PDR) – Revised concept – Circuit Design • • • • • Prototype Plans Testing Plans Issues Next Steps Questions 13 Prototype Plan • Assembly – The Prototype is divided into two parts: • DC supply – AC DC using transformer, Wave rectifier and voltage regulator. DC voltage at the USB receptacle • Attachment • Testing – The USB connector is followed by charge termination circuit and then connected to device connector through a wire. - DC supply - For voltage and current available at USB output - Attachment - For functionality of the charging termination circuit. Also test its functionality with computer USB ports. 14 Prototype Plan Parts, Quantity and Cost Bill of Material 12/3/2006 Subcom ponent Part Name NPN BJT Resistor Attach ments Capacitor Phone Connector Male USB Adaptor Capacitor Transformer DC Supply Full-Wave Bridge Rectifier Voltage Regulator Female USB Connector Description Value Vendor Man. Part Number Manufacturer Name 1%, 1/4 W MF 1%, 1/4W MF 5%, 1/2W CF 10%, 10V, Ceramic N/A 54.9 1.78k 5.1 10uF Allied Allied Allied Newark 2SC2655-0(F) RNF1/4T1 54.9 1% RNF1/4T1 1.78k 1% CF1/2 5.1 5% 0202ZD103KAT2A Toshiba SEI SEI SEI AVX 20%, 25V, Al. Elec. 10uF 20%, 25V, Al. Elec. 1000uF Primary: 115/230 10V,1A 50/60 Hz, VA 10 Dpak,Vin 40V max, Vdrop 2V 5V, 500mA Allied 925 Keystone Electronics Allied Allied SEK100M025ST SEK102M025ST Mallory Mallory Allied VPP10-1000 Triad Magnetics Newark MC78M05CDTG ON Semi Allied 787616-1 AMP/Tyco Electronics Width Length 0.1 0.1 0.11 0.0122 Total Area 0.25 0.025 0.25 0.025 0.35 0.0385 0.024 0.000293 0 Total Area 0.2 0.2 0.51 0.51 1.875 0.088793 0.04 0.2601 1.375 2.578125 0 Total Area Estimated Cost of DC Supply: $11.76 Estimated Cost of Attachments: $1.94 3.055811 Unit Price Qty Total Price $0.2100 $0.0600 $0.0600 $0.0600 $0.2860 1 1 1 1 1 $0.2100 $0.0600 $0.0600 $0.0600 $0.2860 $0.5000 1 $0.5000 $0.7600 1 $0.7600 TOTAL $0.0500 $0.2900 1 2 $1.9360 $0.0500 $0.5800 $10.0200 1 $10.0200 1 $0.0000 $0.4800 1 $0.4800 $0.6300 1 $0.6300 TOTAL $11.7600 15 Agenda • Project Background • Previous Accomplishments (up to PDR) • Current Accomplishments (since PDR) – Revised concept – Circuit Design • • • • • Prototype Plans Testing Plans Issues Next Steps Questions 16 Testing Plans Quality/Reliability Objectives • Meet company specifications • Meeting company/government standards for quality and reliability • Assuring that the components and sections of the product are reliable under stressed conditions. • Testing product for previously stated condition: – Product Maltreatment Test 17 Testing Plans Product Maltreatment Test • This is designed to test the durability of the prototype. • The test involves the following: – Pulling the attachment cord when phone is connected – Trying to force wrong attachment into the phone – Verifying part life by running various short and long term tests. 18 Testing Plans Product Verification Plans • The hardware of the product will be main focus when running verification tests. • No software is required in our product minimizing the testing needed for hardware/software integration. • The following testing procedures will be used to test the product: – Test Battery Condition – Charge Regiment Test 19 Agenda • Project Background • Previous Accomplishments (up to PDR) • Current Accomplishments (since PDR) – Revised concept – Circuit Design • • • • • Prototype Plans Testing Plans Issues Next Steps Questions 20 Issues • Attachments – The team has not been able to find a vendor for the cell-phone, PDAs and MP3 player connectors needed to connect the charger to the mobile devices. 21 Agenda • Project Background • Previous Accomplishments (up to PDR) • Current Accomplishments (since PDR) – Revised concept – Circuit Design • • • • • Prototype Plans Testing Plans Issues Next Steps Questions 22 Next Steps • • • • • • • Order Components Independent work Receive Components Prototype Build Start Prototype Build End Testing/ Debugging Start Testing/ Debugging End 12/11/06 12/11-01/08 01/08/07 01/10/07 01/22/07 01/22/07 03/01/07 23 Questions Bryan Alex Neil Pree Peter 24