Download First occasion to measure

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Power inverter wikipedia , lookup

Portable appliance testing wikipedia , lookup

Ground (electricity) wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Stepper motor wikipedia , lookup

Three-phase electric power wikipedia , lookup

Immunity-aware programming wikipedia , lookup

Islanding wikipedia , lookup

History of electric power transmission wikipedia , lookup

Electrical ballast wikipedia , lookup

Two-port network wikipedia , lookup

Electrical substation wikipedia , lookup

Rectifier wikipedia , lookup

Power electronics wikipedia , lookup

Triode wikipedia , lookup

Power MOSFET wikipedia , lookup

Ohm's law wikipedia , lookup

Multimeter wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Current source wikipedia , lookup

Voltage regulator wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Schmitt trigger wikipedia , lookup

Buck converter wikipedia , lookup

Metadyne wikipedia , lookup

Voltage optimisation wikipedia , lookup

Network analysis (electrical circuits) wikipedia , lookup

Current mirror wikipedia , lookup

Stray voltage wikipedia , lookup

Alternating current wikipedia , lookup

Surge protector wikipedia , lookup

Mains electricity wikipedia , lookup

Opto-isolator wikipedia , lookup

Transcript
QPS for IPQs, IPDs and Inner Triplets. Preparation, IST and Hardware Commissioning 2009
 The DQGPUs (types B1, B2 and C) are presently being modified by QPS to separate the powering of
the redundant Detector Boards between UPS1 (F3) and the new UPS2 (F4). Modifications are on the
CRATE LEVEL, not on the board level.
 Modification of the Protection Crates for the IPDs and IPQs in sector 23 (UA27) has been
COMPLETED. QPS Lab tests are on-going. The units will be ready for insertion later this week.
 The QPS Lab tests include verification of communication and the protection features in case of a loss
of any of the two UPS grids. The 100 ms, 50% UPS voltage window is assured due to the power supply
input voltage tolerance, but checked.
 Lab tests also comprise verification of Detection Threshold and Discrimination Window in Simulation
Mode
 IST comprises:
- Communication tests
- Resistance measurements of magnet heater circuits
- Discharge tests at Zero DC current with firing of all heaters. Verification of voltage decays.
Comparison with previously recorded profiles
- Verification of voltage tap integrity, incl. those for the Leads Protection
 During HWC:
- Interlock testing without firing of heaters.
- Measurement of input voltages U1, U2 and Ures during powering. PM and Logging checks.
- No request from QPS for real quench tests as threshold and discrimination window is
checked in simulation mode
K.Dahlerup-Petersen - MP3 - 2 June 2009
1
Request for an Early Powering Test of the RB Circuit in S23
 The first and only occasion to obtain an early test of the prototype nQPS CRATE, mounted with
the prototype cards for local busbar protection (DQQBS), the SymQ cards (DQQDS) and the DQAMGtype S acquisition controller board.
 Occasion to measure, for the first time, the voltage signals across individual busbar segments as
well as the associated dipole voltages for inductive compensation. First attempt to correct the
compensation.
 Occasion to measure, for the first time, the total dipole voltage with current in the circuit. High
precision measurements with the DQQBS card. Intended for possible replacement of the Snapshot
method, as no ‘internal’ splices are absent in this absolute resistance determination.
 First occasion to measure the electrical noise levels with DC current in the Powering Circuit.
 Early possibility to verify the communication through the new WorldFip links of the nQPS crate.
 First possibility to verify in-situ the algorithms for the 4-dipole comparison of the ApertureSymmetric Quench Scheme.
 First occasion to measure the current decay time constant with the new Extraction Resistor
configuration (225 mOhm in stead of 150 mOhm) – 68 s time constant instead of 04 s.
 Requested parameters: Measuring plateau's at 400 A, 600 A, 800 A and 1’000 A. dI/dt of 2-3 A/s.
Cryo at 1.9 K. HWC done up to 1 kA. Plateau duration 10 min. Opening of the Extraction Switches after
10 min at 1’000 A.
K.Dahlerup-Petersen - MP3 - 2 June 2009