* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Deploying GMP Applications Scott Fry, Director of Professional
		                    
		                    
								Survey							
                            
		                
		                
                            
                            
								Document related concepts							
                        
                        
                    
						
						
							Transcript						
					
					Deploying GMP Applications Scott Fry, Director of Professional Services Overview      Server technology Deployment process Maintenance Vendor partnership Question and answers Server Technology  Server technology – – – – Client server Failover clusters Virtualization Cloud Server Technology  Internal infrastructure – Client servers – 2-tier architectures – 3-tier architectures Server Technology Failover clusters Server Technology  Failover clusters – High availability – Enterprise deployments and large sites Server Technology Virtualization  Physical hardware – Processors, memory, chipset, I/O devices, etc. – Resources often grossly underutilized  Software – Tightly coupled to physical hardware – Single active OS instance – OS controls hardware Server Technology What is a virtual server?  Software abstraction – Behaves like hardware – Encapsulates all OS and application state  Virtualization layer – Extra level of indirection – Decouples hardware, OS – Enforces isolation – Multiplexes physical hardware across VMs Server Technology Public vs. Private Cloud Server Technology  Cloud – Pay-per-usage • Infrastructure-as-a-Service (IaaS) • Platform-as-a-Service (PaaS) • Software-as-a-Service (SaaS) – Availability, reliability & security – Hardware / IT staffing Deployment Process      Application requirements Dedicated environments Server requirements Platform requirements Client requirements Deployment Process  Application requirements – – – – Hardware and network Software licenses Security policies IT staff Deployment Process  Dedicated environments – Development – Validation (Test/QA) – Production Deployment Process  Server requirements – – – – Performance Storage Availability Support staff Deployment Process  Platform requirements – Operating systems • Microsoft Windows, Linux, Sun – Database’s • Microsoft SQL, Oracle – Browsers • Internet Explorer, Chrome, Firefox Deployment Process  Client requirements – Operating systems • Microsoft Windows – Vista, Windows 7 – Browsers • Internet Explorer, Chrome, Firefox Deployment Process Application Server 64-bit Processor Database Server 64 – Bit Client 64 - Bit Dual 2 (GHz) Core Duo Xenon Quad 2 (GHz) Core Duo Xenon 700 (MHz) Pentium III compatible processor; compatible processor; processor; 2.33 (GHz) or faster processor Quad 2.33 (GHz) or faster 1.5 (GHz) or faster Core recommended. processor recommended Duo processor recommended Operating Windows Server 2008 R2 Windows Server 2008 R2 Microsoft XP SP3, Vista, or System Enterprise Edition or Standard Enterprise Edition or Standard Windows 7 Edition. Edition. Microsoft SQL 2008 R2 Memory 4 gigabyte (GB) or more 8 gigabyte (GB) or more 512 GB of RAM or more; recommended recommended 2 GB or more recommended Hard Disk  Approximately 500 GB of available hard-disk space for the recommended installation of Microsoft SQL Reporting Services  Approximately 50 GB pre 10,000 Assets of hard-disk space recommended over a 10 year period. Other  Microsoft Internet Information Services 7.5 ASP.NET 4.0  Microsoft Internet Information Services 7.5 ASP.NET 2.0 Requirements  Display Other Devices   A Microsoft Internet Explorer 8.0(Native Mode)A IE8 only supported for R3 Super VGA (1024X768) or Super VGA (1024X768) or Super VGA (1024X768) or higher-resolution video adapter higher-resolution video adapter higher-resolution video and monitor and monitor adapter and monitor Microsoft Mouse or compatible Microsoft Mouse or compatible Microsoft Mouse or pointing device pointing device compatible pointing device Deployment Process GAMP System Lifecycle Deployment Process     User Requirements Functional Requirements Design / Configuration Qualification – – – – Server Qualification Installation Qualification Operational and/or Performance Qualification Traceability Matrix Deployment Process  User Requirements – What the system is supposed to do – Normally written by the user – May be sent to suppliers as part of the vendor selection process which should include • All essential requirements (musts) • If possible a prioritized set of desirable requirements (wants) – Requirements should be linked to Performance Qualification Deployment Process  Functional Requirements – Normally written by the supplier – Describes the detailed functions of the system, i.e., what the system will do – An initial version of the FS may be produced as part of the supplier response – Further revisions of the FS are prepared in conjunction with the user – Links to Operation Qualification, which tests all the functions specified Deployment Process  Design and configuration – Configure your system to closely match your current and ideal procedures – Amount of configuration will depend on the amount of flexibility in your selected system – A configuration document should be created Deployment Process  Server Qualification – When implementing a calibration management software and validating it in a GxP compliant environment – Verify that your computer hardware and network can support the system you’re implementing – Understand where investments in computing hardware will have the greatest impact on the user end or on the network or server side Deployment Process  Installation Qualification (IQ) – Documented verification that a system is installed according to written and pre-approved specifications Deployment Process  Operational Qualification (OQ) – Documented verification that a system operates according to written and pre-approved specifications throughout all specified operating ranges Deployment Process  Performance Qualification (PQ) – Documented verification that a system is capable of performing or controlling the activities of the processes it is required to perform or control, according to written and pre-approved specifications, while operating in its specified operating environment Deployment Process  Traceability Matrix – Maps the user requirements to: • • • • • User Requirements Functional Requirements Installation Qualification (IQ) Operational Qualification (OQ) Performance Qualification (PQ) Deployment Process  Validation final report – The validation final report is a summary of the evidence leading to the conclusion that the system has been successfully validated Maintenance      Backups Updates and patches Performance monitoring Change management Periodic review Maintenance  Backups – – – – Define backup schedule Define what type of backups Storage of backups Test backups Maintenance  Updates and patches – OS updates – Application updates Maintenance  Performance monitoring – Determine your monitoring goals – Choose the appropriate tool for the type of monitoring you will perform – Identify the events to monitor – Determine the event data to capture Maintenance  Change management – The goal is to enable change while ensuring compliance – The process should be well documented in an approved procedure Maintenance  Change management – Follows the same lifecycle processes • • • • • Planning Specification Configuration Verification Reporting – All of these activities should be well documented for each change Maintenance  Periodic review – Maintaining the validated state involves: Vendor Partnership  Why Blue Mountain Quality Resources – Over 1000 implementations of Calibration Manager. – Over 100 implementations of Blue Mountain RAM in the Life Sciences industries – Over 20 year of experience in Life Sciences industry Vendor Partnership  Why Blue Mountain Quality Resources – Familiarity with regulations and technology means you get the most from your investment – Full range of services to supplement your resources, reduce costs and minimize risks Vendor Partnership  Blue Mountain Professional Services – Services Solutions Deploying GMP Applications Questions
 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
									 
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                             
                                            