Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Proposal of Strategic Task Force - Making requirements to Smart Grid and LVDC - 2010-5-18 Norimasa Minami Assistant secretary and TA9 Technical secretary Contents 1, Current activities in IEC high level committees 1) SMB/SG1 (Electrical Energy Efficiency) 2) SMB/SG2 (Ultra High Voltage) 3) SMB/SG3 (Smart Grid) 4) SMB/SG4 (Low Voltage Direct Current) 5) MSB/SWG 2, Scope in IEC 3, Impacts to TC100 1) Smart Grid 2) LVDC 3, About ad-hoc group 1) Objectives 2) Goal 3) Timeline 4) Members 1, Current activities in IEC high level committees 1) SMB/SG1 (Electrical Energy Efficiency) Created the below SGs 2) SMB/SG2 (UHV) Ultra high voltage transmission among the grids No impact to TC100 3) SMB/SG3 (Smart Grid) TC100 products are using electricity Impact to TC100 about from/to in-home, such as HEMS 4) SMB/SG4 (LVDC) TC100 products are driven by DC in its hardware Direct current inside home, not transmission outside 5) MSB/SWG EEE report mentioned new energy technologies In the future may be discussed 2, Scope in IEC Should be discussed on a sectoral basis PV network HVAC Data Centre Distribution Panel 系統 創 network Generator 制御 蓄 FULL 家電 AUTO Energy Management LVDC A/V equipment ECO Substation Residential Battery Heat Pump FC Fridge EV Generation Transmission Distribution In-home 3, Impacts to TC100 1) Smart Grid (SG3) Electrical using equipments, HEMS, Smart meter, etc Air-conditioner Transformer Refrigerator Washing Machine heat pump Power Station AC 100-200V Microwave Oven AC 50/60Hz Induction Heater Storage Cell TV LVDC 24~48V Photovoltaic DVD/BD PC Printer Audio Set GameMachinei Phone/Fax Hybrid Control DC PLC LED Lighting Sensor ー Wireless Charger Heat pump FC Hydrogen Bath Kitchen Waste heated water Wash-basin Energy Architecture in home (MSB-SWG report) Ventilation Electric Toothbrush Electric Shaver 2) LVDC (SG4) All most of TC100 products are using DC Unification of voltage, plug, wall socket, wiring, accessories, etc 4, About a proposed task force(s) 1) Objectives Survey and discussions of requirements to Smart Grid, LVDC ex. Interfaces, Protocol, Voltage, and Safety issues 2) Goal Establishment of projects to make a standard related TC100 3) Timeline 1st step : - December, 2010 Survey the impact to TC100 by Smart Grid 2nd step : 2011- depend on the SMB decisions in October Discussions and making requirements to related TCs Making standards related TC100 4) Members Request to resister experts