* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download MPP_Orbit_07052008
Valve RF amplifier wikipedia , lookup
Integrating ADC wikipedia , lookup
Operational amplifier wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Josephson voltage standard wikipedia , lookup
Point of sale wikipedia , lookup
Power electronics wikipedia , lookup
Current source wikipedia , lookup
Schmitt trigger wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Power MOSFET wikipedia , lookup
Opto-isolator wikipedia , lookup
Current mirror wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Voltage regulator wikipedia , lookup
Surge protector wikipedia , lookup
MPP Result of the investigation in the orbit correctors faults. RCBV27.L6B2 – High value of magnet resistance during PNO.a1 RCBCV10.L6B1 – EE811 voltage tap missing MPP Meeting 07/05/2008 G. D’Angelo – R. Mompo RCBV27.L6B2 – Status of PNO.a1 analysis on 16/04/2008 Status faced when the test PNO.a1 was executed (16/04/2008): The resistance of the magnet is higher than the criteria !! MPP Meeting 07/05/2008 G.D’Angelo – R. Mompo RCBV27.L6B2 – PNO.a1 – Current cycle and circuit R_Cable_Pos R_Lead_Pos U_LEAD_POS RCBV27.L6B2 - PNO.a1 LCIRCUIT V_MEAS U_LEAD_NEG 6 R_Cable_Neg U_TOT 80 R_Lead_Neg 60 V_MEAS 4 U_LEAD_POS 40 U_LEAD_NEG I_MEAS 20 0 0 200 400 600 800 1000 1200 1400 1600 0 1800 -20 -2 -40 -4 -60 -6 MPP Meeting 07/05/2008 -80 time [s] G.D’Angelo – R. Mompo Current [A] Voltage [V] 2 RCBV27.L6B2 – PNO.a1 – Criteria and calculation U_TOT = V_MEAS – (U_LEAD_POS + U_LEAD_NEG) – U(R_serie) During plateau: R_Magnet = U_TOT / I_PNO <3.5 e-3 Ohm Edms : 874724 Data from 16/04/08 during plateau: V_Meas= 2.63 V; U_LEADs=0.068 V U(R_serie)= 2.81 V. R_Magnet = -4.5e-3 Above the limit and negative !! R_Cable_Pos R_Lead_Pos U_LEAD_POS V_MEAS LCIRCUIT U_LEAD_NEG R_Cable_Neg R_Lead_Neg R_serie = R_Cable_Pos + R_Cable_Neg LHC Layout Database (05.05.2008) R_serie=0.051 Ohm Measurement of R_serie repeated 05/05/2008 0.0475 Ohm R_Magnet updated: 1.08 e-3 Ohm, OK !! (with offset corrections) MPP Meeting 07/05/2008 U_TOT LHC Layout Database (05.05.2008 ) R_serie=0.0475 Ohm G.D’Angelo – R. Mompo RCBV27.L6B2 – PNO.a1 – PASSED with the updated R_serie MPP Meeting 07/05/2008 G.D’Angelo – R. Mompo RCBV27.L6B2 Conclusion: The PNO.a1 cycle should be repeated on RCBV27.L6B2 in order to make sure that the measurement of DC warm cables performed on 05/05/2008 did not altered the circuit. Then the NC should be closed. MPP Meeting 07/05/2008 G.D’Angelo – R. Mompo MPP Result of the investigation in the orbit correctors faults. RCBV27.L6B2 – High value of magnet resistance during PNO.a1 RCBCV10.L6B1 – EE811 voltage tap missing MPP Meeting 07/05/2008 G.D’Angelo – R. Mompo RCBCV10.L6B1 – EE811 voltage tap missing Chronology of events: On 11/03/2008, RCBCV10.L6B1 circuit was successfully qualified by ELQA team. On 14/04/2008, AB/PO can not power this circuit, they have a fault on the PC. On 16/04/2008, EE811 (cold voltage tap) is found open, directly from the feed through pin coming from the cover flange => NC 908215 opened. MPP Meeting 07/05/2008 G.D’Angelo – R. Mompo RCBCV10.L6B1 – EE811 voltage tap missing On 05/05/2008: Intervention to perform a time domain reflectometry to localize precisely the defect. It is repairable if it is at the level of the cover flange. Surprise! The voltage tap EE811 is back! Impossible to make a reflectometry as there is no defect anymore, so I did a few ohmic measurements to check all the voltage taps. MPP Meeting 07/05/2008 G.D’Angelo – R. Mompo RCBCV10.L6B1 – EE811 voltage tap missing Measurements on the external « sick » orbit dipole: For comparison, measurements on the internal dipole: *: Measurement performed with a portable multimeter. MPP Meeting 07/05/2008 G.D’Angelo – R. Mompo RCBCV10.L6B1 – EE811 voltage tap missing Conclusion: AB/PO have no more interlocks, they can now power the magnet to qualify the circuit (checked with V. Montabonnet) with the circuit as is. Proposal: We could try to reproduce the defect, by feeding a current of 2 Amps through the voltage taps. If the voltage tap remains connected, we close the NC. If we manage to open the vtap, we perform a time domain reflectometry. MPP Meeting 07/05/2008 G.D’Angelo – R. Mompo