Download Document

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Stray voltage wikipedia , lookup

Opto-isolator wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Buck converter wikipedia , lookup

Voltage optimisation wikipedia , lookup

Mains electricity wikipedia , lookup

Immunity-aware programming wikipedia , lookup

Rechargeable battery wikipedia , lookup

Alternating current wikipedia , lookup

Bio-MEMS wikipedia , lookup

Rectiverter wikipedia , lookup

Transcript
Series 5300 Lithium Cell
Formation System
3 Generations of Lithium
Formation Systems
Series 5000
Series 5200
Series 5300
Series 5300 New Features








Individual progression of each cell through the
complete formation process.
Higher current 2.5 amps.
Up to 128 steps for each formation procedure.
Cycling capability.
Data collection during the formation.
AC impedance (1 KHz) available as an option.
Reduced size and complexity for UPS backup.
Lower cost per channel (<12%).
Overall System Layout
Electronics Hardware (1)
Rear view showing interface
connections to cell fixture
Front view showing filtered air inlet
and guarded AC power switch
Electronics Hardware (2)
32 cell controller board. From left to right,
cell interface connectors, output current fuses,
isolation relays, heat sink,charge/discharge
relays, electronic components, dc power input.
Internal view, with 8 x 32 cell controller boards
in top section, power supplies in bottom section
and air filter on hinged door. All service access
is through front door only.
Electronics Hardware (3)
Interface cable for 4 cells, with 37 pin
DIN style connector. Maximum cable
length 3 m.
Interface cables to cell fixture exit the
rear of the electronics cabinets
System Functions (1)






Charge and discharge at up to 2.5 amps.
Charge CC to voltage limit, then CV to current limit.
Charge can end on time, voltage current, amp-hours,
and others including faults and safety conditions.
Discharge at CC.
Discharge can end on time, voltage, amp-hours, and
others including faults and safety conditions.
Each cell progresses individually through the
formation, thus at any one time some cells can be in
charge and some in discharge.
System Functions (2)







Data can be recorded at intervals of 1 minute or
multiple thereof.
Data recorded includes voltage time, current, amphours, watt-hours, cycle no., and step no.
Each cell has its own data file.
Each cell tray has a summary data file.
Up to 128 steps in each formation procedure.
> 1000 cycle capability.
Each group of 128 cells can be running a different
formation procedure.
Technical Specifications (1)







Voltage measurement range:
Maximum charge voltage:
Minimum discharge voltage:
Voltage accuracy:
Maximum charge current:
Maximum discharge current:
Current accuracy:
0 to 5.0 V
5.0 V
2.0 V
+/- 5 mV
2.5 A per cell (limited to
400 A maximum per 256
cell cabinet)
2.5 A
+/- 2.5 mA
Technical Specifications (2)

Capacity accuracy:

Time resolution:
Data recording rate:

Operating temperature:

AC power input:

KW per
+/- 2.5 mAh at
the “C” rate
500 mS
minimum 1 minute or
multiple thereof
5 to 35 deg.C at full
current
180 to 264V, or 360 to
500V, 3 phase, 2.5
256 cell cabinet
Software



Maccor formation software is 32 bit, and normally
runs under Windows 98.
The control program is virtually identical to our
laboratory test system software, and has a high level
of maturity.
Around this is a shell program that functions as an
interface to the formation system hardware.
CC/CV Charge Profile
Formation Procedure (1)
Formation Procedure (2)
Grade Profile
System Safety Screen
Layout of Trays in the System
Layout of Cells in the Tray
Scramble Table
Start Screen
Main Screen
Cell Detail Screen
Individual Cell Data File
Tray Data Summary File
End of Formation Report
Report Set-Up Screen
Calibration
Start-Up and Training








Maccor engineer on site for
approximately one week.
Check installation
Power–up system
Check for correct operation
Re-calibrate all channels
Run cell samples if available
Train operator personnel
Train maintenance personnel
to board replacement level
Thank you