Download V‐NLH‐048 (Revision 1, Nov 18‐14)  2013 NLH General Rate Application  Page 1 of 2 Reference: Section 4: Rates and Regulation, Section 4.6 Rate Stabilization Plan, 

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Flow conditioning wikipedia , lookup

Compressible flow wikipedia , lookup

Turbulence wikipedia , lookup

Hydraulic power network wikipedia , lookup

Reynolds number wikipedia , lookup

Computational fluid dynamics wikipedia , lookup

Aerodynamics wikipedia , lookup

Fluid dynamics wikipedia , lookup

Rheology wikipedia , lookup

Transcript
V‐NLH‐048 (Revision 1, Nov 18‐14) 2013 NLH General Rate Application Page 1 of 2 1 Q. Reference: Section 4: Rates and Regulation, Section 4.6 Rate Stabilization Plan, 2 Pages 4.17 ‐ 4.20 3 For each hydraulic generation station on the Island Interconnected System from 4 which power is being purchased, please provide the annual average water flow 5 through the generating station. Spillage and other flows that do not go through the 6 generator should be omitted. The flows should include historical averages from all 7 available sources, such Hydro, Nalcor, the Water Resources Department, files from 8 the owners prior to the expropriation, etc. 9 10 11 A. Hydro purchases power from the following hydroelectric stations: 12 
Star Lake; 13 
Grand Falls; 14 
Bishop’s Falls; 15 
Buchans; and 16 
Rattle Brook. 17 18 Only limited information on flow used for generation is available. 19 
from 1998 to 2013, is 6,740 million m3; 20 21 
The annual average water flow through Star Lake Generating Station based on data for the period 2000 to 2013 is estimated to be 478 million m3; 22 23 The average annual flow through the units at Grand Falls, based on data 
An estimate of the turbined flows for Bishop’s Falls, made using generation 24 data from 2003 to 2013 and an average conversion factor, is 25 5,740 million m3; and 26 27 
An estimate of the turbined flows for Buchans, made using generation data from 1998 to 2013 and an average conversion factor, is 350 million m3. 1 V‐NLH‐048 (Revision 1, Nov 18‐14) 2013 NLH General Rate Application Page 2 of 2 No information regarding flows through the generating station at Rattle Brook is 2 available. 
Related documents
V-NLH-048 2013 NLH General Rate Application Page 1 of 2 Q.
V-NLH-048 2013 NLH General Rate Application Page 1 of 2 Q.
P2‐PUB‐NLH‐7  NLH 2012 Capital Budget Application  Page 1 of 1 Re: 2012 Capital Plan 
P2‐PUB‐NLH‐7  NLH 2012 Capital Budget Application  Page 1 of 1 Re: 2012 Capital Plan 
PUB 4.0 NLH NLH 2007 Capital Budget Page 1 of 1
PUB 4.0 NLH NLH 2007 Capital Budget Page 1 of 1
CA-NLH-002 NLH 2016 Capital Budget Application Page 1 of 1
CA-NLH-002 NLH 2016 Capital Budget Application Page 1 of 1
IN‐NLH‐013  2013 NLH General Rate Application  Page 1 of 2 Re: NLH Evidence, Section 2, p. 2.5, lines 4‐13 
IN‐NLH‐013  2013 NLH General Rate Application  Page 1 of 2 Re: NLH Evidence, Section 2, p. 2.5, lines 4‐13 
IR‐LWHN‐NLH‐008  NLH 2013 Interim Rates Application  Page 1 of 1 Q. 
IR‐LWHN‐NLH‐008  NLH 2013 Interim Rates Application  Page 1 of 1 Q. 
NP‐NLH‐005  Holyrood Blackstart Diesel Units Application  Page 1 of 1 Q. 
NP‐NLH‐005  Holyrood Blackstart Diesel Units Application  Page 1 of 1 Q. 
BASKETBALL TRAINING WAIVER FORM
BASKETBALL TRAINING WAIVER FORM
PUB‐NLH‐360  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Asset Management
PUB‐NLH‐360  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Asset Management
CA‐NLH‐299  2013 NLH General Rate Application  Page 1 of 1 Cost of Service 
CA‐NLH‐299  2013 NLH General Rate Application  Page 1 of 1 Cost of Service 
NP‐NLH‐032  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Q. 
NP‐NLH‐032  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Q. 
PR‐PUB‐NLH‐053  NLH 2015 Prudence Review  Page 1 of 3 Q. 
PR‐PUB‐NLH‐053  NLH 2015 Prudence Review  Page 1 of 3 Q. 
LWHN‐NLH‐047  2013 NLH General Rate Application  Page 1 of 2 Q.
LWHN‐NLH‐047  2013 NLH General Rate Application  Page 1 of 2 Q.
IC-40 NLH NLH 2005 Capital Budget Page 1 of 1
IC-40 NLH NLH 2005 Capital Budget Page 1 of 1
Genotype x environment interactions in plant
Genotype x environment interactions in plant
MRI (radio) phenotypes - Cancer Imaging Archive Wiki
MRI (radio) phenotypes - Cancer Imaging Archive Wiki
P2‐IC‐NLH‐16  NLH 2012 Capital Budget Application  Page 1 of 1 Re:  Project B‐5 Unit 1 and Unit 2 Generator Stator Rewind 
P2‐IC‐NLH‐16  NLH 2012 Capital Budget Application  Page 1 of 1 Re:  Project B‐5 Unit 1 and Unit 2 Generator Stator Rewind 
Moments of a Random Variable, Moment Generating Function
Moments of a Random Variable, Moment Generating Function
4.5 Probability generating functions
4.5 Probability generating functions
Assignment 3
Assignment 3
5.0 Child Dev
5.0 Child Dev
CA‐NLH‐019  BDE to Western Avalon Line  Page 1 of 2 Q. 
CA‐NLH‐019  BDE to Western Avalon Line  Page 1 of 2 Q.