Download CA‐NLH‐299  2013 NLH General Rate Application  Page 1 of 1 Cost of Service 

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Resilient control systems wikipedia , lookup

Alternating current wikipedia , lookup

Power engineering wikipedia , lookup

Electrical substation wikipedia , lookup

Electrical grid wikipedia , lookup

Distribution management system wikipedia , lookup

Mains electricity wikipedia , lookup

Second Industrial Revolution wikipedia , lookup

History of electric power transmission wikipedia , lookup

Transcript
CA‐NLH‐299 2013 NLH General Rate Application Page 1 of 1 1 Q. Cost of Service 2 (Amended GRA, Schedule A) Please provide justification for including CBPP in the 3 Industrial Customer class including a description of CBPP load and generation, and 4 an explanation of how its demand characteristics are similar to other customers in 5 the Island Industrial Customer class. 6 7 8 A. 9 CBPP is directly supplied from the bulk transmission system from a transformer with a primary side voltage of 230 kV and therefore meets the definition of an 10 Industrial Customer in the same manner as Hydro’s other Industrial Customers. 11 This is consistent with the definition of an Industrial Customer under the EPCA, 12 which is as follows: 13 14 15 16 17 18 “industrial customer” means any person purchasing power, other than a retailer, supplied from the bulk transmission grid at voltages of 66 kV or greater on the primary side of any transformation equipment directly supplying the person. 19 The important factor in the determination of whether CBPP is an Industrial 20 Customer is that this customer does not benefit from a distribution system and, 21 therefore, does not attract or pay for distribution costs. In some jurisdictions, 22 Industrial Customers are referred to as "transmission level" customers. The 23 demand characteristics of a customer are not a factor that Hydro applies when 24 determining if a customer should be treated as an Industrial Customer. 
Related documents
P2‐PUB‐NLH‐7  NLH 2012 Capital Budget Application  Page 1 of 1 Re: 2012 Capital Plan 
P2‐PUB‐NLH‐7  NLH 2012 Capital Budget Application  Page 1 of 1 Re: 2012 Capital Plan 
V‐NLH‐048 (Revision 1, Nov 18‐14)  2013 NLH General Rate Application  Page 1 of 2 Reference: Section 4: Rates and Regulation, Section 4.6 Rate Stabilization Plan, 
V‐NLH‐048 (Revision 1, Nov 18‐14)  2013 NLH General Rate Application  Page 1 of 2 Reference: Section 4: Rates and Regulation, Section 4.6 Rate Stabilization Plan, 
PR‐PUB‐NLH‐053  NLH 2015 Prudence Review  Page 1 of 3 Q. 
PR‐PUB‐NLH‐053  NLH 2015 Prudence Review  Page 1 of 3 Q. 
V-NLH-048 2013 NLH General Rate Application Page 1 of 2 Q.
V-NLH-048 2013 NLH General Rate Application Page 1 of 2 Q.
IN‐NLH‐013  2013 NLH General Rate Application  Page 1 of 2 Re: NLH Evidence, Section 2, p. 2.5, lines 4‐13 
IN‐NLH‐013  2013 NLH General Rate Application  Page 1 of 2 Re: NLH Evidence, Section 2, p. 2.5, lines 4‐13 
Contagious Bovine Pleuropneumonia (CBPP)
Contagious Bovine Pleuropneumonia (CBPP)
PUB‐NLH‐360  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Asset Management
PUB‐NLH‐360  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Asset Management
IR‐LWHN‐NLH‐008  NLH 2013 Interim Rates Application  Page 1 of 1 Q. 
IR‐LWHN‐NLH‐008  NLH 2013 Interim Rates Application  Page 1 of 1 Q. 
Contagious bovine pleuropneumonia (CBPP)
Contagious bovine pleuropneumonia (CBPP)
cbpp_epidemiology
cbpp_epidemiology
Economics of CBPP in Kenya
Economics of CBPP in Kenya
LWHN‐NLH‐047  2013 NLH General Rate Application  Page 1 of 2 Q.
LWHN‐NLH‐047  2013 NLH General Rate Application  Page 1 of 2 Q.
NP‐NLH‐032  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Q. 
NP‐NLH‐032  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Q. 
PUB‐NLH‐187  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Q. 
PUB‐NLH‐187  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Q. 
PUB‐NLH‐188  Island Interconnected System Supply Issues and Power Outages  Page 1 of 3 Q. 
PUB‐NLH‐188  Island Interconnected System Supply Issues and Power Outages  Page 1 of 3 Q. 
Disease name
Disease name
LT Single Circuit Line Voltage Track
LT Single Circuit Line Voltage Track
cbpp_complete_0
cbpp_complete_0
View Full Text-PDF
View Full Text-PDF
Washington’s Stricter Building Energy Code Withstands Legal Challenge
Washington’s Stricter Building Energy Code Withstands Legal Challenge
The Financial Crisis - Center on Budget and Policy Priorities
The Financial Crisis - Center on Budget and Policy Priorities
Different expression of CD41 on human lymphoid
Different expression of CD41 on human lymphoid