Download bovec exercise form

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Soil contamination wikipedia , lookup

Transcript
STEP PROJECT
BOVEC EXERCISE FORM
1) BUILDING IDENTIFICATION
Municipality BOVEC
Province: ________________________________
Country: SLOVENIA
Locality CESOZCA
Name of building/owner: _________________________________________________________
Building number |__|__|
Address: ______________________________________________________________________
Number |__|__|__|__|__|
PC |__|__|__|__|__|
Cadastral Data: |__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|__|
GIS Coordinates X: |__|__|__|__|__|__|__|__|__|__|__|__|__|__|
Ownership :
private
Y: |__|__|__|__|__|__|__|__|__|__|__|__|__|__|
Type: |__|__|__|
public
2) BUILDING GEOMETRY AND USE
Total number of storeys |__|__|
Number of underground storeys |__|__|
Average interstorey high (m) |__|__|,|__|
Position:
isolated
inner
Year of construction/ intervention
Unknown
Basement
yes
no
Average floor area (sm) |__|__|__|__|__|
border
corner
Type of intervention
Unknown
Use
Residential
Units for that use
|__|__|
Number of people
at the moment of
Strategic (Hospital, OSOCC)
|__|__|
the event
|__|__|__|__|
≤1900
Repair
1901-1940
Upgrade
Relevant (Schools, ..)
|__|__|
1941-1960
Retrofit
Commercial
|__|__|
1961-1981
Floor addition
Offices
|__|__|
1981-2001
Other
Touristic
|__|__|
Not used
|__|__|
Other
|__|__|
≥ 2001
3) BUILDING TYPE
Prevailing vertical bearing structure
Prevailing horizontal structure
Unknown
Unknown
Wooden building
Vaults
RC building
Unknown
Flexible floors (wooden)
MRF
shear walls
Dual system
Semi-rigid floors (steel beams and clay tiles)
Steel building
Unknown
Rigid floors (RC)
MRF
braced
RC walls
Roof
Masonry or Mixed (masonry & RC, masonry & Wood) building
Unknown
Unknown
irregular layout or bad quality masonry (round stones, pebbles, HCT..)
regular layout and good quality masonry (square stones, full bricks,..)
Retrofitted (injections, FRP, RC walls, etc.):
Mixed building:
not applicable
Unknown
Unknown
in plan
Prefabricated.
Other _____________________________________________
Yes
No
in vertical
Unknown
Thrusting
Light
Non thrusting
Heavy
Ties and Beam ties (masonry or mixed buildings)
Absent
Few
Many
Stair position
Unknown
Symmetric resp. 2 axes
Vulnerabilities for RC/Steel buildings (multi-option)
Dissymmetric
Symmetric resp. 1 axe
Vulnerabilities for Masonry/Mixed buildings (multi-option)i
Soft storey (pylotis)
Poor quality mortar
short columns
Thrusting structures without ties or ring beams
Frame in one direction only
Walls not connected
Infill walls out of the structural frame
Large openings / close to the corners / non in vertical
Irregularity in plan
Chimney in walls
Irregularity in elevation (excluding soft storey)
Irregularity in plan
Absence of seismic joints
Irregularity in elevation
4) DAMAGE
Structural damage
Non structural damage
D0
D1
D2
D3
D4
Damage to
partitions
D5
Vertical structures
Falling of
chimney, tiles
Damage to water
/ sewage plant
Damage to
electric/gas plant
Falling of plaster
Floors
Falling of false
ceiling
Stairs
Falling of
parapets,..
....................
....................
Roof
Infill walls
Overall damage
External risk
On the building
On the building entrance
On the building lateral roads
Risk of objects falling from adjacent buildings
Risk of objects falling from adjacent soil
Damage to lifelines (water, sewage, gas, ..)
Soil and foundation
Soil morphology
Valley
Flat
Slope instability
Mild slope
Damage to soil
Steep slope
Crest or Top
Damage to foundation
6) CASUALTIES
injured |__|__|__|__|
victims |__|__|__|__|
evacuated people |__|__|__|__|
evacuated families |__|__|__|__|
Restricted use (yellow)
Unusable (red)
7) SAFETY ASSESSMENT
Building usability
Usable (green)
Immediate risk of collapse
no
no
Access to the building
Yes
Partially, temporarily or with other restriction
Access to the Area
No
Yes
To retrieve goods
Yes
No
No
Type of restrictions__________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________
8) SHORT TERM COUNTERMEASURES
None
Location and description…………………..
Location and description…………………….…..
Removal of falling objects
Small repairs
Shoring
Tightening
Propping
Other
9) ACCURACY OF THE INSPECTION
From outside only
Inspection not performed because of
Partial
Refused
Ruins
Other reasons
Complete
No owner found
Demolished
_____________________________
NOTES: ____________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________
Date: ___/___/___
Name and sign __________________________
Inspectors: Team number |__|__|__|__|
Name and sign __________________________
Name and sign ____________________