Document Number: ECP 11-0511g Date: 09/09/2016 LUCY VCN2A AND VCE2A TEST FORM Substation Name Substation Number Voltage Switchgear Installed Mode Free-standing () Switchboard Number Manufacturer Serial Number Type Transformer-mounted () Lucy Protection CTs Ratio in Use TLF Rating Transformer Rating Preliminary Checks kVA () Visual inspection satisfactory (no visible signs of damage etc) Earthing satisfactory SF6 gas pressure satisfactory Functional/Interlock Checks () Open and close circuit-breaker Earth switch cannot be operated when service selected Circuit-breaker cannot be operated when earth selected Open and close earth switch Test access/earth star bar cannot be opened when circuit-breaker in On and Off position Test access/earth star bar can be opened when earth switch closed Transformer Winding Insulation Resistance using Test Voltage from ECS 11-0006 (transformer-mounted units only) HV windings to earth (LV windings connected together and to earth) M LV windings to earth (HV windings connected together and to earth) M THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Version: 5.0 Lucy VCN2a and VCE2a Test Form Document Number: ECP 11-0511g Version: 5.0 Date: 09/09/2016 Switchgear Continuity Test Circuitbreaker Terminals Under Test Circuitbreaker Terminals Under Test Closed L1 - L1 Earthed L1 -E L2 - L2 L2 - E L3 - L3 L3 - E Continuity Continuity HV Insulation Tests using Test Voltage from ECS 11-0006 Circuit-breaker Terminals Under Test Earthed Closed L1 L2, L3 Closed L2 L1, L3 Closed L3 L1, L2 Open L1, L2, L3 L1, L2, L3 Voltage (kV) Duration (min) IR (M) Protection CTs Insulation Resistance using 1kV Test Voltage (test from marshalling box – refer to Figure 1 and Figure 2) Check selector switch is in the service position () Remove CT wiring earth link C70 - C90 () CTs, AC trip coils and TLFs C70 - Earth M Replace CT wiring earth link C70 - C90 () Refer to Figure 2 Figure 1 – Marshalling Box © UK Power Networks 2017 All rights reserved Earth link C70-C90 Figure 2 – Protection CT connections in Marshalling Box 2 of 5 Lucy VCN2a and VCE2a Test Form Document Number: ECP 11-0511g Version: 5.0 Date: 09/09/2016 Protection CTs Loop Continuity (test CT and trip coil from TLF ratio terminal block with test link removed) Remove CT ratio shorting link () 100/5 Ratio 50/5 Ratio L1 C110 - C72 C210 - C72 L2 C130 - C72 C230 - C72 L3 C150 - C72 C250 - C72 Replace CT ratio shorting link () C110-C130-C150-C70-C210-C230-C250 100/5 50/5 Note: For a complete list of Lucy SABRE A drawings refer to ECP 11-0511 Lucy SABRE A Schematic Drawings.pdf. © UK Power Networks 2017 All rights reserved 3 of 5 Lucy VCN2a and VCE2a Test Form Document Number: ECP 11-0511g Version: 5.0 Date: 09/09/2016 Primary Injection Test (free-standing units only) Earth Fault Release Test Remove TLFs and replace with shorting links () CB Conductors Under Test CT Ratios Trip Range Closed L1 - L1 50/5 25 - 30A A 100/5 <40A A 50/5 25 - 30A A 100/5 <40A A 50/5 25 - 30A A 100/5 <40A A Closed L2 - L2 Closed L3 - L3 Trip Current Overcurrent Release Test Remove TLF shorting-links, connect shorting-link to L1, L2, L3 on one side CB Conductors Under Test Closed L1 - L2 Closed Short Conductors L2 - L3 () CT Ratios Trip Range Trip Current 50/5 19-26A A 100/5 <45A A 50/5 19-26A A 100/5 <45A A Secondary Injection Test (transformer-mounted units only) Earth Fault Release Test (remove TLFs and replace with shorting links) CB Test Connections CT Ratios Trip Range Trip Current Open C31 - C70 50/5 2 - 2.7A A 100/5 1.2 - 1.6A A Overcurrent Release Test (remove shorting links) CB Test Connections CT Ratios Trip Range Open C11 - C31 50/5 1.5 - 2.7A A 100/5 1 - 1.7A A 50/5 1.5 - 2.7A A 100/5 1 - 1.7A A Open C31 - C51 Trip Current Note: If the circuit-breaker does not operate when the injected current is gradually applied then the maximum value of current should be applied instantaneously. © UK Power Networks 2017 All rights reserved 4 of 5 Lucy VCN2a and VCE2a Test Form Document Number: ECP 11-0511g Version: 5.0 Date: 09/09/2016 Final Checks () Check correct CT ratio selected Check correct TLF rating selected and fitted Check all links are replaced and secure Asset data form completed and submitted Test Equipment Make/Type Serial Number Calibration Date Certification () All tests have been completed satisfactorily Comments Commissioning Engineer Signature Date The completed test form shall be left on-site in a plastic wallet and in secure location. A copy of the completed test shall be sent to the relevant ART mailbox. © UK Power Networks 2017 All rights reserved 5 of 5