* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Earth Potential Rise (EPR) Computation for a Fault on
Electrical engineering wikipedia , lookup
Nominal impedance wikipedia , lookup
Mains electricity wikipedia , lookup
Electronic engineering wikipedia , lookup
Power engineering wikipedia , lookup
Telecommunications engineering wikipedia , lookup
Stray voltage wikipedia , lookup
Alternating current wikipedia , lookup
Electrical grid wikipedia , lookup
Electric power transmission wikipedia , lookup
Rectiverter wikipedia , lookup
Ground (electricity) wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
Utility pole wikipedia , lookup
History of electric power transmission wikipedia , lookup
Transmission line loudspeaker wikipedia , lookup
Fault tolerance wikipedia , lookup
National Electrical Engineering Consultancy Design Management 4 – 54/60 Links RD St Marys, NSW, 2760 ACN: 132586675 Construction www.NeecGroup.com [email protected] ABN: 86132586675 NATIONAL ELECTRICAL ENGINEERING CONSULTANCY Earth Potential Rise (EPR) Computation for a Fault on Transmission Mains Pole Prepared by: M. Nassereddine Earth Potential Rise (EPR) Computation for a Fault on Transmission Mains Pole National Electrical Engineering Consultancy Design Management 4 – 54/60 Links RD St Marys, NSW, 2760 ACN: 132586675 Construction www.NeecGroup.com [email protected] ABN: 86132586675 Abstract—The prologue of new High Voltage (HV) transmission mains into the community necessitates earthing design to ensure safety compliance of the system. Conductive structure such as steel or concrete poles is widely used within HV transmission mains; the earth potential rise generated by a fault on these structures could direct to an unsafe condition. This paper endeavor to provide information on the input impedance of the OHEW system for finite and infinite transmission mains, the definition of finite and infinite system was discussed, maximum EPR due to pole fault were discussed, and simplified equations for EPR assessments were introduced and discussed for the finite and infinite conditions. I. INTRODUCTION T he benefits of electricity are numerous but mishandling it can cause damages to properties and may inflict injuries and fatalities. High voltage transmission deploys conductive poles such as steel and concrete structure. The assumption that any grounded object can be safely touched is not always correct. A serious hazard may result during a ground fault. Fault on transmission mains structure create an earth potential rise (EPR) which could lead to unsafe touch condition on these structure or unsafe transfer voltage to nearby conductive infrastructure. High voltage substations are fed by transmission mains. The route of transmission mains could be in close proximity to residence and community infrastructures, many people believe touching transmission mains are safe, this statement is not always correct, this statement only stand if the earthing system at the base of the pole is capable on absorbing the fault energy generated by the high voltage fault. The EPR generated on the structure could lead to unsafe voltage transfer to near by conductive infrastructures such as metal fence, water pipe line and telecommunication circuit. Transmission mains poles are exposed to two types of fault conditions: Fault at the high voltage substation due to the split factor concept Fault at the transmission poles Also transmission mains are divided in two categories depending on its length: Infinite transmission mains Finite transmission mains This paper discusses the transmission mains EPR under pole fault for the two length conditions, it examine the EPR on the faulted pole and its maximum possible magnitude. Also this paper introduces an estimated methodology for quick assessment on the maximum EPR under pole fault. II. THEORETICAL STUDY A. Design Factors The earth potential rise on the transmission pole under fault will depend on the following factors; these factors are considered the most important elements when it comes to pole EPR assessment: Fault Location Fault Current Magnitude on the structure Infinite or finite transmission mains Substation earth grid resistance Pole earth grid resistance as seen from the OHEW connection point Conductor arrangement on the transmission poles Type of the OHEW Numbers of the OHEW (in this paper, single OHEW were used) Soil Resistivity Structure Pole surrounding infrastructure In this paper, transmission mains pole fault is assumed to have the same magnitude as substation fault. B. Line Impedance Figure 1 represents an overhead transmission line that connect two substations, Earth Potential Rise (EPR) Computation for a Fault on Transmission Mains Pole National Electrical Engineering Consultancy Design Management 4 – 54/60 Links RD St Marys, NSW, 2760 ACN: 132586675 Construction www.NeecGroup.com [email protected] ABN: 86132586675 Figure1: OH transmission mains layout with OHEW C. Infinite System For an infinite transmission line, equation 1 can be used to determine the OHEW input impedance Ze = Zs + ZsZ p 2 (1) Where Z s is the OHEW self impedance for the average span in ohms Z p is the pole earth grid resistance in ohms Z e is the line impedance as seen from the fault Figure 2 represents the line impedance Z e under a fault at the substation, Figure 2: Line impedance for a fault at the substation Figure 3 represents a pole fault located in the middle of the transmission mains, if half the transmission main line is considered to be infinite, equation 1 can be used to determine Z e1 and Z e 2 Figure 3: Fault at the transmission pole Earth Potential Rise (EPR) Computation for a Fault on Transmission Mains Pole National Electrical Engineering Consultancy Design Management 4 – 54/60 Links RD St Marys, NSW, 2760 ACN: 132586675 Construction www.NeecGroup.com [email protected] ABN: 86132586675 Under the infinite condition, the maximum pole earth potential rise can be found using equation 2: PoleEPR = (1 − ς )I f ZT (2) Where ς is the coupling factor I f is the fault current ZT is the total impedance as seen from the fault location The worse case scenario is represented by a fault on the phase located at greater distance d Where d is the distance between the Phase conductor under fault and the OHEW Figure 4 shows the phase conductor arrangements in relation to the OHEW, in this figure, fault on phase C represents the worse case scenario when assessing the EPR for a fault on this pole. Figure 4: Conductor Phase arrangement on transmission pole D. Finite System If the transmission line is considered to be finite, the input impedance of the OHEW can be computed using equation 3: Z e = Z OHEW − In // (Z s − connection + Z g ) (3) Where Z OHEW − In is the ling impedance for N number of poles Z s −connection is the OHEW self impedance between the last pole and the substation Figure 5 shows a fault on a pole for a finite transmission line, Z e1 can be found using equation 5, similar Earth Potential Rise (EPR) Computation for a Fault on Transmission Mains Pole National Electrical Engineering Consultancy Design Management Construction 4 – 54/60 Links RD St Marys, NSW, 2760 ACN: 132586675 computation for www.NeecGroup.com [email protected] ABN: 86132586675 Ze2 Figure 5: Pole fault for finite transmission line The finite impedance on one side can be found using the following approach Z OHEW − In = Z s + 1 1 + ZP Z + S 1 1 1 1 + Z P Z + ...... + Z + S S 1 1 1 + ZP ZS + ZP NEEC established equation 4 to compute the finite system OHEW input resistance Z OHEW − In − NEEC AZ s Z P + Z P2 = BZ s + CZ P (4) Where A, B and C are function of N N is the number of section in an infinite system Similar to the infinite line, the separation distance between the OHEW and faulted phase has an impact on the pole EPR, the worth case scenario is represented with the fault on the phase located far to the OHEW, similar to the infinite line, the finite line with pole arrangement as shown in figure 4, fault on phase C represents the worse case scenario. III. EPR UNDER POLE FAULT The worse case EPR under a pole fault can be divided into two sections 1. Fault under finite system 2. Fault under infinite system Figure 6 shows the EPR for a pole fault under transmission mains where half its length is considered to be finite, which mean the fault on the middle pole has a finite line both its end. The lowest EPR is presented in the middle as both substation earth grids for a part of the OHEW input impedance due to the finite line, the worse case scenario is represented by a pole fault near the substation. Earth Potential Rise (EPR) Computation for a Fault on Transmission Mains Pole National Electrical Engineering Consultancy Design Management 4 – 54/60 Links RD St Marys, NSW, 2760 ACN: 132586675 Construction www.NeecGroup.com [email protected] ABN: 86132586675 Figure 6: Pole EPR for a finite middle line Figure 7 shows the EPR for a pole fault under transmission mains where half its length is considered to be infinite, which mean the fault on the middle pole has an infinite line both its end. The worse case scenario is represented by a pole fault in the middle of the line Figure (7) Pole Fault EPR for an infinite system Earth Potential Rise (EPR) Computation for a Fault on Transmission Mains Pole National Electrical Engineering Consultancy Design Management 4 – 54/60 Links RD St Marys, NSW, 2760 ACN: 132586675 Construction www.NeecGroup.com [email protected] ABN: 86132586675 IV. CONCLUSION This paper provides a process on how to assess the maximum EPR under pole fault; it shows that for infinite transmission mains it is possible to estimate the maximum EPR value with minimum input data. Also this paper shows how it is possible to estimate the EPR along the feeder route under different pole fault location, it shows that the worse case scenario is presented with a pole fault near the substation for a finite system and by a pole fault in the middle of the line for an infinite system. This approach enhance the process of earting design when it comes to transmission mains, it gives the designer guidance if further pole earth grid design is required for touch and step voltage compliance. It shall be noted that the pole earth grid shall comply with the lightning protection requirements. REFERENCES [1] [2] [3] [4] [5] [6] [7] Andrenyi J. “Analysis of Transmission Tower Potentials During Ground Faults” 1967 IEEE Transaction on Power Apparatus and Systems, Vol. Pas-86, No. 10 Nassereddine M, Hellany A, Rizk J, 2009, How to design an effective earthing system to ensure the safety of the people, 2009 International Conference on Advances in Computational Tools for Engineering Applications, pp 416-421, [ORS ID: 210202] Nassereddine M, Hellany A, Nagrial M, “Analysis of the impact of the OHEW under full load and fault current” 2010, International Jurnal of Energy and Environment (IJEE), Volume 1, Issue 4, pp. 727-736. [ORS ID: 216605] Nassereddine M, Hellany A, Nagrial M. Rizk J. “Soil Resistivity Structure and its implication on the Earth Grid of HV substation” 2011 World Academy of Science, engineering and Technology , Vol 60, pp 1322-1326, [ORS ID: 222496] Nassereddine M, Hellany A, 2009, AC Interference Study on Pipeline: the Impact of the OHEW under Full Load and Fault Current, Proceeding in the 2009 International Conference on Computer and Electrical Engineering, pp 497-501, [ORS ID: 211920] Nassereddine M, Hellany A. “OHEW Earthing Design Methodology of Traction Substation” 2010 World Academy of Science, engineering and Technology, Vol 66, no. 0, pp 1644-1648, ISSN 2070-66, [ORS ID:217809] Nassereddine M, Hellany A, Nagrial M. Rizk J. “ Safety Compliance of Substation Earthing Design” 2011 World Academy of Science, engineering and Technology , Vol 60, pp 525-529, [ORS ID: 222495] Earth Potential Rise (EPR) Computation for a Fault on Transmission Mains Pole