* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download CONNECTION APPLICATION FORM (Form A) Given below is
Transformer wikipedia , lookup
Telecommunications engineering wikipedia , lookup
Electrical ballast wikipedia , lookup
Ground (electricity) wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Power inverter wikipedia , lookup
Electrification wikipedia , lookup
Current source wikipedia , lookup
Schmitt trigger wikipedia , lookup
Transformer types wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Opto-isolator wikipedia , lookup
Power MOSFET wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
Power engineering wikipedia , lookup
Power electronics wikipedia , lookup
Electrical substation wikipedia , lookup
History of electric power transmission wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Buck converter wikipedia , lookup
Surge protector wikipedia , lookup
Voltage regulator wikipedia , lookup
Three-phase electric power wikipedia , lookup
Stray voltage wikipedia , lookup
Alternating current wikipedia , lookup
CONNECTION APPLICATION FORM (Form A) Given below is typical information required from Embedded Generators (EG) for the Initial Meeting with PowerStream. Submission Date 1. Project Name 2. Project Dates Proposed Start of Construction Proposed in Service Date 3. Project Size: Number of Units Rating of Each Unit Number of Phases Proposed Total Capacity Proposed Total Capacity, Future 4. Project Location (Address / City / Town) 5. Project Developer or Contractor Company Contact Person Mailing Address Telephone Fax E-mail 6. Project Owner Company Contact Person Mailing Address Telephone Fax E-mail 7.Existing Electric Service (If applicable) Capacity (Amps) Number of phases: One; Account Number: Voltage (Volts) Load (kW) Three PowerStream Connection Application (Form A) Page 1 of 3 8. Engineering Consultant Company Contact Person Mailing Address Telephone Fax E-mail 9. Project Type Wind Turbine Hydraulic Turbine Steam Turbine Diesel Engine Solar Fuel Cell Co-generation / CHP (Combined Heat and Power) Other, Please specify 10. Generator Voltage and Type: a) Generation Voltage DC Synchronous b) Type: Rotating Generators Other Please specify c) Non rotating DC Generation DC Source-Photovoltaic Arrays DC Source-Batteries Other Please specify d) Generator Operational Capability AC grid dependant Gas Turbine Biomass Volts Induction DC Source-Fuel Cells islanding/standby power e) Manufacturer: Model Number: 11. Inverter Information (where applicable) Rated Capacity: (kW) Number of phases: One Output Voltage Three (Volts) 12. Proposed Step-up Interface Transformer Connection (delta, wye – solid grounded, wye – impedance grounded etc.) High Voltage* Low Voltage ** The Connection of the windings should also be indicated in the Single Line Diagram (SLD). Note: * “High Voltage” refers to the connection voltage to PowerStream’s distribution system. ** “Low Voltage” refers to the generation or any other intermediate voltage. 13. Location Map and Connection Voltage to PowerStream’s Distribution System Provide Site Location with suitable details of generation facility, line routing and proposed connections to the PowerStream’s facilities. PowerStream Connection Application (Form A) Page 2 of 3 Drawing / Sketch No. Proposed connection voltage to PowerStream’distribution system Rev. kV 14. Single Line Diagram (SLD) Provide SLD of EG facility showing the interface point to PowerStream’s distribution system. The SLD should include the required disconnecting device and show various equipment: generators, high and low voltage switchgear, transformers, motors, protective relays / devices, instrument transformers (CTs and PTs), metering, synchronizing etc. Provide as much information as possible on the SLD. Note: If the project includes extension or upgrades to existing EG facilities, show clearly the existing and new electrical equipment and include information on the existing generating unit(s). SLD Drawing Number: Rev. 15. Operation, Generation and Load Information: Mode of Operation: 24 hour or Base Load: Load Displacement: Yes, No If Yes, existing load: kW New load: Intent Of Generation: kW Yes, No, Power Export? kW Yes, No, kW Peak Period Only? Yes, No, kW Participation in OPA Standard Offer programs? Yes No, Detail: Net Metering Program? (up to 500kW renewable sources)? Yes No Other: Annual Capacity Factor Prospective number of annual scheduled starts / stops, and timing there of Estimated maximum load of the EG facility Prospective maximum power export from the EG facility (to PowerStream system) 17. Customer Signature: PowerStream Connection Application (Form A) % kVA kVA kW kW Date Page 3 of 3