Download CONNECTION APPLICATION FORM (Form A) Given below is

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Transformer wikipedia , lookup

Telecommunications engineering wikipedia , lookup

Electrical ballast wikipedia , lookup

Ohm's law wikipedia , lookup

Ground (electricity) wikipedia , lookup

Pulse-width modulation wikipedia , lookup

Power inverter wikipedia , lookup

Electrification wikipedia , lookup

Current source wikipedia , lookup

Schmitt trigger wikipedia , lookup

Transformer types wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Rectifier wikipedia , lookup

Opto-isolator wikipedia , lookup

Power MOSFET wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Amtrak's 25 Hz traction power system wikipedia , lookup

Power engineering wikipedia , lookup

Power electronics wikipedia , lookup

Triode wikipedia , lookup

Electrical substation wikipedia , lookup

Islanding wikipedia , lookup

History of electric power transmission wikipedia , lookup

Metadyne wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Buck converter wikipedia , lookup

Surge protector wikipedia , lookup

Voltage regulator wikipedia , lookup

Three-phase electric power wikipedia , lookup

Stray voltage wikipedia , lookup

Alternating current wikipedia , lookup

Voltage optimisation wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
CONNECTION APPLICATION FORM (Form A)
Given below is typical information required from Embedded Generators (EG) for the Initial
Meeting with PowerStream.
Submission Date
1. Project Name
2. Project Dates
Proposed Start of Construction
Proposed in Service Date
3. Project Size:
Number of Units
Rating of Each Unit
Number of Phases
Proposed Total Capacity
Proposed Total Capacity, Future
4. Project Location (Address /
City / Town)
5. Project Developer or Contractor
Company
Contact Person
Mailing Address
Telephone
Fax
E-mail
6. Project Owner
Company
Contact Person
Mailing Address
Telephone
Fax
E-mail
7.Existing Electric Service (If applicable)
Capacity
(Amps)
Number of phases: One;
Account Number:
Voltage
(Volts)
Load
(kW)
Three
PowerStream Connection Application (Form A)
Page 1 of 3
8. Engineering Consultant
Company
Contact Person
Mailing Address
Telephone
Fax
E-mail
9. Project Type
Wind Turbine
Hydraulic Turbine
Steam Turbine
Diesel Engine
Solar
Fuel Cell
Co-generation / CHP (Combined Heat and Power)
Other, Please specify
10. Generator Voltage and Type:
a) Generation Voltage
DC
Synchronous
b) Type: Rotating Generators
Other Please specify
c) Non rotating DC Generation
DC Source-Photovoltaic Arrays
DC Source-Batteries
Other Please specify
d) Generator Operational
Capability
AC
grid dependant
Gas Turbine
Biomass
Volts
Induction
DC Source-Fuel Cells
islanding/standby power
e) Manufacturer:
Model Number:
11. Inverter Information (where applicable)
Rated Capacity:
(kW)
Number of phases:
One
Output Voltage
Three
(Volts)
12. Proposed Step-up Interface Transformer Connection
(delta, wye – solid grounded, wye – impedance grounded etc.)
High Voltage*
Low Voltage **
The Connection of the windings should also be indicated in the Single Line Diagram
(SLD).
Note: * “High Voltage” refers to the connection voltage to PowerStream’s distribution
system. ** “Low Voltage” refers to the generation or any other intermediate voltage.
13. Location Map and Connection Voltage to PowerStream’s Distribution System
Provide Site Location with suitable details of generation facility, line routing and
proposed connections to the PowerStream’s facilities.
PowerStream Connection Application (Form A)
Page 2 of 3
Drawing / Sketch No.
Proposed connection voltage to PowerStream’distribution system
Rev.
kV
14. Single Line Diagram (SLD)
Provide SLD of EG facility showing the interface point to PowerStream’s distribution
system.
The SLD should include the required disconnecting device and show various equipment:
generators, high and low voltage switchgear, transformers, motors, protective relays /
devices, instrument transformers (CTs and PTs), metering, synchronizing etc.
Provide as much information as possible on the SLD.
Note: If the project includes extension or upgrades to existing EG facilities, show clearly
the existing and new electrical equipment and include information on the existing
generating unit(s).
SLD Drawing Number:
Rev.
15. Operation, Generation and Load Information:
Mode of Operation:
24 hour or Base Load:
Load Displacement: Yes, No
If Yes, existing load:
kW
New load:
Intent Of Generation:
kW
Yes, No,
Power Export?
kW
Yes,
No,
kW
Peak Period Only? Yes, No,
kW
Participation in OPA Standard Offer programs?
Yes
No, Detail:
Net Metering Program? (up to 500kW renewable sources)?
Yes
No
Other:
Annual Capacity Factor
Prospective number of annual scheduled
starts / stops, and timing there of
Estimated maximum load of the EG facility
Prospective maximum power export from the
EG facility (to PowerStream system)
17. Customer Signature:
PowerStream Connection Application (Form A)
%
kVA
kVA
kW
kW
Date
Page 3 of 3