* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Lighting Completion and Installation Certificate
Buck converter wikipedia , lookup
History of electric power transmission wikipedia , lookup
Electrical engineering wikipedia , lookup
Ground (electricity) wikipedia , lookup
Voltage optimisation wikipedia , lookup
Surge protector wikipedia , lookup
Telecommunications engineering wikipedia , lookup
Alternating current wikipedia , lookup
Stray voltage wikipedia , lookup
Mains electricity wikipedia , lookup
Earthing system wikipedia , lookup
Portable appliance testing wikipedia , lookup
Electrician wikipedia , lookup
Electrical wiring wikipedia , lookup
Revised: Dec 2009 Lighting Completion and Installation Certificate Reference number ........./........ for office use only ELECTRICAL INSTALLATION CERTIFICATE (as prescribed in the Requirements for Electrical Installations – BS7671 [IEE Wiring Regulations]) (1) (see notes Page 5) Details of the Installation: New Alteration to existing Addition to Existing Project Name: .......................................................................................................... Client: ....................................................................................................................... .. Address:.................................................................................................................... Design I/We being the person(s) responsible (as indicated by my/our signatures below) for the Design of the electrical installation, particulars of which are described on page 3 of this form CERTIFY that the said work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with current edition of BS7671 ‘Requirements for Electrical Installations’ (IEE Wiring Regulations Seventeenth Edition) except for the departures, if any stated in this Certificate. The extent of liability of the Signatory is limited to the work described above as the subject to this Certificate. For the DESIGN of the installation: Name (Block Letters): ................................... Position ..................................... For and on behalf of .............................................................................................. Address .............................................................................................. ............................................................................................... (2) Signature ............................................... (3) Date ............................................ NEXT INSPECTION I/We the designer(s) recommend that this installation is further inspected and tested after an interval of not more than ............... years/months. For Highway Power Supplies IEE Guidance Note 3, Recommendation 6 Years. Page 1 of 5 Revised: Dec 2009 Lighting Completion and Installation Certificate Construction I/We being the person(s) responsible (as indicated by my/our signatures below) for the Construction of the electrical installation, particulars of which are described on page 3 of this form CERTIFY that the said work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with current edition of BS7671 Requirements for Electrical Installations’ (IEE Wiring Regulations Seventeenth Edition) except for the departures, if any stated in this Certificate. The extent of liability of the Signatory is limited to the work described above as the subject to this Certificate. For the CONSTRUCTION of the installation: Name (Block Letters): ................................... Position ..................................... For and on behalf of .............................................................................................. Address .............................................................................................. ............................................................................................... .. (2) Signature ............................................... (3) Date ......................................... Inspection and Test I/We being the person(s) responsible (as indicated by my/our signatures below) for the Inspection and Test of the electrical installation, particulars of which are described on page 3 of this form, CERTIFY that the said work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with current edition of BS7671 ‘Requirements for Electrical Installations’ (IEE Wiring Regulations Seventeenth Edition) except for the departures, if any stated in this Certificate. The extent of liability of the Signatory is limited to the work described above as the subject to this Certificate. For the INSPECTION AND TEST of the installation: Name (Block Letters): ................................... Position ...................................... For and on behalf of ............................................................................................... Address ............................................................................................... ................................................................................................ .. (2) Signature ............................................... (3) Date .............................................. Page 2 of 5 Revised: Dec 2009 Lighting Completion and Installation Certificate Particulars of the Installation (Delete or complete items as appropriate) Highway Distribution Unit/Termination Pillar (6) Pillar No. ..................................................................... Supply Column No. ................................ Location .................................................................................................................................................. Type of Installation New/alteration/addition/to existing installation Type of Earthing (312.3) TN-C TN-S TN-C-S TT IT (Indicate in the box) Earth Electrode Location ……………………………………………….…….. Resistance …….……………….. ohms (only as required) Characteristics of the supply at the origin of the installation (313.1 ) No of Phases ................ ascertained by enquiry determined by calculation measured Supply voltage Volts Prospective short-circuit current kA Earth fault loop impedence (Ze) ohms Maximum demand Overcurrent protective device - Type BS Amps per phase …………………... Rating ............ A Main Switch or circuit breaker (537.1.4, 537.1.6) Type BS............ Rating............ A (if an r.c.d rated residual operating current I n No of Poles ......... .......................... mA Main protective bonding conductors (411.3.1.1, 411.3.1.2, 544.1.1): Size ……………………… mm2 Schedule of Test Results: Continuation ………………………………………………......……… pages Details of departures (if any) from the wiring regulations (120.3, 120.4)........................................................... ……………………………………………….…………………………………...................……………………......... Comments on existing installation where applicable (633.1, 633.2) ........……………………………………….. ……………………………………………….………………………………………………..………………………….. Page 3 of 5 TN-S N CPC BS No. Type Size (mm) Ph Protective Device Fuse Conductor In MCB Rating Capacity Y N Breaking Continuity Type Rating Ph - E N-E Satisfactory Ph - N Insulation Resistance Line 3 Voltage Line 2 Voltage Y N Polarity Full Load A M.Ohms Factor Satisfactory Full Load For the inspection and test of the installation : : Signature (2) : Address For and on behalf of : Name (In Block Letters ) : Date (3): Position : Optional Items Location Ohms Remote Current mA Operating V Current Remote End R.C.D. / R.C.B.O. Cir. No. (5) Page of EFLI Pages Comments Method of Measurement G39 Authorisation Level Power Remote Resistance Earth Electrode Resistance (lightning protection only) Area I /We being the person(s) responsible (as indicated by my/our signatures below) for the Inspection and Test of the electrical installation, particulars of which are described above. Certify that the said work which I /We have been responsible is to the best of my/our knowledge and belief in accordance with the current edition of BS7671 “Requirements for Electrical Installations” (IEE wiring Regulations Seventeenth Edition). except for departures, if any, stated in this Certificate. The extent of liability of the signatory is limited to the work described above as the subject of this Certificate. LINE REF. Circuit TN-C-S MAIN FUSE Line 1 Voltage No.Poles IT kA Rating SWITCHED P.S.C.C. Ze (Ohms) MAIN SWITCH LIVE E.F.L.I SOURCE WATTAGE HEATER Supply Column No. PHASES TT Location NUMBER OF Type of Earthing BONDING CONDUCTOR mm MAIN PROTECTIVE TN-C SCOT POWER SUPPLY H.D.U No. HIGHWAY DISTRIBUTION UNIT NETWORK Voltage Revised: Dec 2009 Lighting Completion and Installation Certificate Page 4 of 5 Revised: Dec 2009 Lighting Completion and Installation Certificate Explanatory Notes 1 This document is intended for the initial certification of a new installation or of an alteration or addition to an existing installation and of an inspection. An original is to be given to the client. The duplicate should be retained by the contractor. 2 The signatures appended are those of the competent persons authorised by the companies executing the work of design, construction and inspection and testing respectively. A signatory authorised to certify more than one category of work should sign in each of the appropriate places. 3 Dates to be inserted. 4 Where particulars of the installation recorded herein constitute a sufficient schedule for the purpose of Regulation 514.9.1 further drawings/schedules need not be provided. For other installations the additional drawings/schedules listed below apply . 5 The page numbers of each sheet should be indicated together with the total number of sheets involved. 6 The designer shall prepare Page 3 (Particulars of the Installation) and subsequent pages for each Highway Distribution unit or Termination Pillar. (4) Schedule of Additional Records Drawing/Schedule Description ELECTRICAL INSTALLATION CERTIFICATE GUIDANCE FOR RECIPIENTS This safety Certificate has been issued to confirm that the electrical installation work to which it relates has been designed, constructed, inspected and tested in accordance with British Standard 7671 (the IEE Wiring Regulations). You should have received an original Certificate and the contractor should have retained a duplicate Certificate. If you were the person ordering the work, but not the user of the installation, you should pass this Certificate, or a full copy of it including the schedules, immediately to the user. The "original" Certificate should be retained in a safe place and be shown to any person inspecting or undertaking further work on the installation in the future. If you later vacate the property, this Certificate will demonstrate to the new owner that the electrical installation complied with the requirements of British Standard 7671 at the time the Certificate was issued. The Construction (Design and Management Regulations require that, for a project covered by those Regulations, a copy of this Certificate, together with schedules, is included in the project health and safety documentation. For safety reasons, the electrical installation will need to be inspected at appropriate intervals by a competent person. The maximum time interval recommended before the next inspection is stated on page 1 under "NEXT INSPECTION". This Certificate is intended to be issued only for a new electrical installation or for new work associated with an addition or alteration to an existing installation. It should not have been issued for the inspection of an existing installation. A "Periodic Inspection Report" should be issued for such an inspection. Page 5 of 5