Bolton Mills Action Framework Guidance for the future role of Bolton’s Mills www.bolton.gov.uk Contents 1.0 Introduction 1.1 1.2 1.3 1.4 1.5 2.0 Role of the Action Framework 2.1 2.2 2.3 3.0 Setting Objectives Lessons Learned The Objectives of the Framework The Action Framework 3.1 3.2 3.3 3.4 4.0 The Purpose of the Study Parameters of the Study Bolton’s Mill Resource Case Studies Developing an Action Framework Introduction Key Issues of the Framework Monitoring and Review Action Framework Table Appendices A: B: Mills Assessment Matrix Evaluation of Funding Sources, September 2006 Lorne St Mill No.3 © Bolton Council. Published January 2007 . No part of this document may be reproduced in part or wholly, by any means, without the prior permission of the publishers in writing. Contact The Communications and Marketing Agency, 2nd Floor, The Wellsprings, Bolton BL1 1US for further information. Front cover photography: Swan Lane Mill No. 3 and Eagley Mills. Photographs courtesy of Sean Wilton, Charlie Baker, Urbed and Bolton Council Foreword With over one hundred mills or complexes still standing providing 1.5million square metres of floorspace, Bolton has an impressive mills heritage even by the standards of North West England. These buildings are of immense value to businesses and local communities. Some are notable structures of architectural merit, others sit in conservation areas or simply at the heart of key gateways or views in neighbourhoods, and even the smallest mill buildings impact on the economy and environment of their surrounding communities. Bolton Council has recognised the importance of the mills resource for many years and has had a strategy and action plan to guide and facilitate development and investment since the late 1980’s which has focussed on maintaining the mills as a key provider of accessible business and employment accommodation. However recent years have brought new challenges; of ageing assets, declining demand from traditional large floorplate users, development competition for higher value land uses and reduced public sector financial support availability. A fresh approach was needed, and the Council with our Strategic Economic Partnership has risen to the challenge, and produced this document based on an intensive period of survey, research, consultation and best practice. Councillor Ebrahim Adia Executive Member for Development The Bolton Mills Action Framework identifies 7 key objectives and a series of tasks to deliver progress. Each year, the Council will prioritise action which will be expressed in a clear delivery plan as our commitment to bring about change in this important policy area. I urge all with a stake in the future of our mills heritage to actively support us to achieve the necessary development and regeneration of our mills assets. 3 1.0 Introduction 1.1 Purpose of study King Sturge LLP, supported by Urbed, was commissioned by Bolton Council to develop this Mills Action Framework to guide the future development of mill premises across Bolton. It is intended that the Action Framework will help provide a clear picture of the current situation – based on surveying and case study work undertaken throughout 2006 by the Council and the consultancy team – and a structure for the future development of mills in Bolton. The Action Framework is a non-statutory document that has been produced to provide further guidance to all parties concerned with the future role of mills in Bolton. It includes recommendations on the future direction of planning policy, though it is recognised that any changes made within the statutory planning process take, through necessity, a considerable period of time before being adopted. Therefore this Action Framework is principally an advisory document, aimed at assisting Bolton Council in the meeting of a number of their objectives including those related to conservation, employment, retail and housing issues. Bolton has a mill resource that is impressive even by the standards of North West England, and these buildings are potentially of immense value to business and community activities. Some are notable structures of architectural merit and thus recognised as Listed Buildings; others sit in Conservation Areas; or simply at the heart of key gateways or views in neighbourhoods; but even the most low-key or small mill buildings impact on their surrounding communities, and therefore it is logical to want to understand as much about these buildings as is possible. 1.2 Parameters of the Study An important part of preparing the Action Framework was to ascertain exactly what constitutes a mill. The formal definitions of a mill – in the context of a built structure are as provided by the Oxford English Dictionary as follows: • A building equipped with machinery for grinding grain into flour or meal; • A building or group of buildings equipped with machinery for processing raw materials into finished or industrial products; • A building or collection of buildings that has machinery for manufacture; a factory. Clearly this leaves a wide definition that encompasses virtually all industrial premises and in the context of this Action Framework we also have to consider buildings that formerly had these uses but are now vacant or in another non-industrial use, such as storage space or residential homes – as these buildings impact on their local communities too. There has also been debate over which buildings qualify as a mill in their own right, or whether they sit within larger mill complexes that should be viewed as one. Earlier surveys estimated there may be up to 130 mills across Bolton – however following detailed survey work an accurate list of 108 mills was assembled, with mills having been demolished or changing their names in the intervening times. Consequently the 108 mills that have been analysed for this Action Framework may not be, by definition, an exhaustive list of every building that potentially qualifies (or qualified) as a mill. They are, however, by both technical definition and public perception, mill buildings – so all are worthy of consideration within this study. 1.3 Bolton’s Mills Resource Victoria Mill Bolton has a rich legacy of mill buildings, which developed as part of Bolton’s growth as an important industrial centre – predominantly textiles, but by 1850 Bolton’s industrial base also comprised bleaching, calico printing, coal mining, heavy chemicals, heavy engineering, leather tanning, papermaking, rope making, and many other smaller industries. By 1911, the textile trade alone employed approximately 36,000 people. Mills came in many shapes, sizes and locations, often with vast floorplates divided across many levels. Of the mills still standing in 2006 it was estimated that a total of 1,438,612 square metres of floorspace remains, giving an 5 average mill size of 13,320 square metres – figures that confirm the extraordinary significance of these buildings to Bolton’s future, as well as its past. Perhaps most telling in terms of reasons why this study is required, are figures from the Valuation Office, suggesting that only 762,047 square metres of mill space is occupied – representing an occupancy rate of just 53%. Furthermore, with a third of mills that can claim 100% occupancy being in residential use, and another quarter being in storage use, the statistics indicate that mills remaining in their traditional use – industry – are amongst the least successful in attaining high occupancy rates. Given that industrial uses account for the prime use in around 42% of mills in Bolton, the implication is that mills being used for industrial purposes are rarely vacant, but often under-used. The construction of mills in Bolton boomed between 1850 and 1900, when over half (53%) of the mills evaluated in this study were constructed, with only 23% of today’s remaining mills being built after 1900. The oldest mill in Bolton is the Wallsuches Bleachworks in Horwich, built around 1770, and currently in the process of being converted to full residential use. Wallsuches Bleachworks represents one of the few stone-built mills in Bolton, as opposed to the more typical brick construction. Bolton’s ‘youngest’ mill is Sir John Holden’s Mill, built in 1927, and most recently in use as a distribution centre. Whilst most of the existing mills are based in central Bolton (59%), they do feature throughout Bolton with Farnworth – housing 15% of all Bolton’s mills – also being a centre of particular interest, and home to the most significant mill cluster – the ten mills sitting in close proximity in the Moses Gate neighbourhood. A smaller number of mills were identified in Westhoughton, Horwich and Kearsley. Across all the locations in Bolton it was notable that owners were often locally based – over 55% came from within Bolton. However just under one third of owners remain unknown. 1.4 Case Studies Further to the survey of Bolton’s mills, the consultancy team undertook more detailed analysis of five ‘case studies’ – mill buildings or mill clusters – between April and July 2006. This process involved meeting, where possible, mill owners and occupiers, examining the buildings, and identifying what physical, financial, and strategic issues the users faced in their attempts to maximise the mills’ potential. The findings from these case studies were supplemented by site and/or desktop analyses of a range of case studies from beyond Bolton – two from the United Kingdom, in Stockport and Calderdale, and two from overseas – the French and American approach to mill development planning. The purpose of undertaking these local and external case studies is to provide Bolton with firsthand evidence of the opportunities and threats facing owners and occupiers elsewhere and what has become recognised good practice – as well as what mistakes were made that Bolton can avoid. 1.5 Developing the Action Framework What became evident from the surveying exercise, and the examination of particular mills in greater detail, is that despite their diversity in ownership, size, location, use, condition and heritage value, there are a number of issues that relate to virtually all mill users. Issues such as finance and funding, physical upkeep, access, safety, available technical support and the meaning and impact of planning regulations, were at the forefront of many owners and occupiers concerns, and it is anticipated that the guidance in this Action Framework will not only be a tool to assist Bolton Council, but also a source of information for all parties involved in present and future mill uses. Perhaps surprisingly, only 13% of the mills surveyed have Listed Building status – and, less surprisingly, they are amongst the buildings considered to be in the best condition. Condition is a difficult issue to quantify – without full structural surveys of all 108 buildings, assessments have to be made purely on visual condition, which can be inaccurate. In the absence of further detail however, this represents the best information available, and it is quite enlightening – around 20% of all mills are considered to be in ‘poor’ or ‘very poor’ condition, and whilst it is heartening that 44% are rated ‘good’ or better, having one-fifth of a valuable resource in such peril is clearly not an acceptable situation – and again justifies the need for focusing specifically on Bolton’s mill resource. Swan Lane Mill No.3 6 2.0 Role of the Action Framework 2.1 Setting Objectives Section 1 of this document has outlined how the Action Framework came into existence and what sources informed its format and content – it is also important to outline the justification for producing it. The research undertaken, and the input of specialists from a broad range of disciplines, led to the derivation of a series of lesson learned. Prior to setting the objectives of Bolton’s Action Framework it is useful to outline what have been the findings from elsewhere. 2.2 Lessons Learned The following, outlines what appears to be the key issues from the nine case studies reviewed in terms of ensuring – as far as is possible – that mill redevelopment is successful. Initially the review looks at what can be taken from the experiences of mill redevelopment outside of Bolton, and then follows with an analysis of what broad findings can be taken from the five internal case studies. 2.2.1 Lessons learned from external case studies: A progressive owner is crucial Regeneration schemes, utilising the redevelopment of a mill or mills complex as the catalyst for transforming an area, exist across the world, including in the UK. A striking feature of the most successful schemes have been the mill owners’ perspectives – the owners were, for instance, often persuaded to the long term capital value available through regeneration rather than the more typical approach of concentrating on maximising short term revenue potential. Grant aid is not vital for some uses Some authorities believe that the lack of grant funding now available for mill redevelopment was not necessarily an insurmountable problem. Developers tend to see grant funding as a mixed blessing as it brings with it a number of restrictions on use - in reality what developers really want is a mill site with substantial open space around the building (primarily for parking). If a mill can be provided with reasonable additional space, development interest will often be forthcoming. However, if conversion is intended for better quality sustainable employment uses then grant funding is generally necessary. Recognising that the public sector must play a catalytic role In public-private partnerships (which are generally the mechanism required to deliver a truly significant regeneration scheme) the visible lead needs to come from the public sector. It is a ‘visible’ lead because quite often the pressure has actually come from the private 8 sector, perhaps indirectly, through making demand for workspace that a local authority cannot provide. Case studies in the UK and overseas noted this problem – even in periods of relative economic stagnation demand existed, but could not be catered for due to the lack of adequate facilities. Eventually competing boroughs, towns or countries fill this gap if action is not taken. So usually the private sector’s requirements are the initial catalyst – it is rare for a local authority to drive a regeneration scheme on a purely speculative basis – often at least some evidence exists of potential future demand. The public sector’s role is to define a location(s) in their area that will act as the hub for this regeneration, initiate the land assembly process, the co-ordination of stakeholders, and the provision of some level of financial resource to instigate physical change. The public lead should be subtle however – most regeneration schemes recommend avoiding a reliance on the public sector. The public sector should prioritise the proposals that it wishes to implement, and those that are better suited for co-operative arrangements or private sector investments. Public investment in an area should be conducted in a manner that will attract private investment and maximise this sector’s impact and visibility. Appreciating timescales involved The economic revitalisation experienced in the case study communities – both UK and overseas – has not happened overnight, and it would be unreasonable to perceive that new changes to an area will happen instantaneously. Regeneration occurred by keeping long-term strategies in mind. Continued regeneration in flagship schemes and clusters takes in advance of ten years from inception to delivery. Utilising land use policy to address incompatible development pressures The cost of converting mill space to business space capable of competing with new-build space available on the market is often quite prohibitive to developers, as rental incomes from office or industrial space is not as high as the revenue that can be levered from residential development – hence the general market pressure to convert mills to flats and apartments. Mixed-use developments are also disliked by many developers, as the difficulties of providing separate access and egress and balancing uses that exhibit some degree of incompatibility is costly. In response in the USA, many city authorities have sought to balance the competing interests between the conversion of industrial properties and the preservation of a sizeable segment of an area's industrial legacy (and perhaps more importantly existing tenancy) in the area by declaring a mixed-use zoning resolution. In this mechanism entire buildings can be converted to, for instance, residential use in a particular area, as long as a corresponding level of employmentbased redevelopment is catered for within the zoning. In the UK some authorities are utilising the policy mechanism of Section 106 Agreements. These Agreements are used to ensure that loss of employment space at one particular site is not necessarily a barrier to development – as conditions are imposed to ensure that a satisfactory level of employment space replacement is provided elsewhere in the locality. Support at the national level is highly beneficial Federation des moulins de France (FDMF) is one of the most co-ordinated and effective national mills organisations in the world. The links provided by FDMF to relevant British sites only highlight the lack of strategic co-ordination in this country in comparison to France – British sites advertised focus on a specific project or area, such as Crabble Corn Mill in Kent or the Vale Mill Trust in Tyne and Wear – whereas some other European countries have a dedicated national organisation focusing on mills. Whilst the development of such a national body is clearly beyond the influence of any single local authority, it is worth noting that such an organisation can exist, and indeed the 14th National Mills Conference in Stockport in June 2006 indicates the growing level of nationwide mills strategising. 2.2.2 Lessons learned from Boltonʼs mills: The five case studies identified and explored within Bolton included a large cluster of mills, a three-mill cluster, and three individual mills with different present and proposed future uses. The analyses of these buildings led to the following overarching findings: Location, frequency and size of mills are key factors • There are, in rare instances, buildings of such scale that do not necessarily lend themselves to any present viable use, particularly in areas with relatively stagnant economies. Even with a co-ordinated masterplan to stimulate interest there is no guarantee that some mills will reach maximum occupancy in the foreseeable future; • However, even without full occupancy some mills can be economically viable if an innovative partial use can be found, and consequently investment in their physical fabric can be assured; • A central location is beneficial in terms of being close to major population centres and good transport infrastructure, however even well-located mills may require further assistance, e.g. through highways works, to maximise their potential; • “Tinkering at the edges” will not achieve the sustainability of some areas, especially where a cluster of mills lie in close proximity. There is a need for a holistic approach to the development of the area if transformational change is to be achieved. Unique employment role of mills • Mills can provide a vital resource to a significant sector of the population who may otherwise struggle to find a niche in the employment market, either through lack of training or skills, mobility, linguistic ability or cultural differences. Planning policy issues • Planning policies on straying from employment uses can be a constraint – however the need to protect an area’s employment uses is apparent, as the loss of such a significant proportion of Bolton’s employment offer could not be easily replaced elsewhere. If financing remains unavailable to invest in the area, the structural decay and infrastructural weaknesses already evident will further undermine the area’s economic viability for any form of employment use. Effectively strict adherence to land use policy could result in some mills and areas becoming economically obsolete. Mixed use development has limitations • Mixed use development can work, but the structure of the building needs to be favourable or technical issues will make costs prohibitive. For example, large floorplates may need to be broken up with a removal of central floor areas to create internal courtyards, so as to provide natural light to the inner core of the building if for residential – or even office – purposes; 9 • The gross to net ratios of mixed use conversions tend to be low reflecting the need for separate cores for employment and residential uses. This has the effect of increasing costs and decreasing value, making such schemes less attractive to developers; • Owners become concerned that neighbouring mills receive preferential treatment without justification – i.e. many want permission to convert to residential but clearly this is not in the strategic interest of the Borough, so only some will gain it. At a local level such tensions will continue to exist without innovative thinking. 2.3 The Objectives of the Framework Having surveyed the condition of Bolton’s mills, and undertaken an analysis of how they are being used, and what issues either facilitate or constrain their successful use, we are now in a position to develop objectives for this Action Framework to address. The objectives, which are described below, are quite wide-reaching therefore allowing all parties to see what the rationale behind the Action Framework is considered to be: Objective 1: To recognise the value of Boltonʼs mills This represents the overarching purpose of undertaking an Action Framework for Bolton’s mill buildings. Their value is multi-faceted – in some instances, where buildings have Listed Building status for example – value of one form has been clearly recognised. However, the aim of this Framework is to highlight how many forms of value mills have, or could have with the right support – not only architectural merit, but their economic usefulness, their contribution to community cohesion and support, and in their heritage value, both as symbols of the past and also in terms of place-defining landmarks of the present and future. Objective 2: To conserve the best of Boltonʼs industrial heritage Bolton has continually lost mills over the past fifty years, and is unlikely to ever gain any more. Those that remain will – if protected – become increasingly valuable and appreciated as examples of an earlier lifestyle and culture, much in the way that castles and stately homes of even earlier times are valued today. Objective 3: To maximise Boltonʼs available employment space Bolton has many of the raw materials for economic success – stable, liberal and closely knit communities; excellent infrastructure; proximity to major markets; a progressive Council; existing successful businesses; a developing business incubation offer; and a rapidly expanding university. A concern for many new and 10 expanding businesses and inward investors is the availability of quality, modern workspace. Mills often have large floorplates, good access and a high profile location – however the gap between the space they usually provide and what businesses are looking for needs to be narrowed through investment and upgrading. Objective 4: To preserve local distinctiveness Sometimes a mill or cluster of mills is not so much notable for the quality of the buildings themselves, but for their importance to defining a broader area. Bolton has many streets and views that are, often dramatically, interrupted by the presence of mills. The presence of these buildings, even when they are under-used or in poor condition, still gives a neighbourhood an identifiable landmark, something unique and memorable. Often generations of locals will have worked in or around the building, and can provide a reference to the area of huge psychological significance. Objective 5: To ensure that mills are an asset to the communities they sit within rather than a liability Bolton has a number of neighbourhoods with one or more mills in their midst. Sometimes these buildings provide employment, housing, an impressive landmark and/or other uses. Too many times however, they are often partially used, poorly maintained and a relatively poor standard-bearer for the area, becoming a symbol of economic decline, as well as a potential physical hazard if under-investment continues. As noted in the paragraph above, mills can offer so much more to an area and it is vital that they are not an actual or perceived liability. Objective 6: To diversify the uses of mills A range of uses already exists in many mills, but continual diversification should be encouraged. Mills have the capacity to house many users, the benefits of this being: the greater the range the more vitality the local community witnesses and exudes to outsiders; the reliance on one or two key users to maintain the building is reduced; and the community benefits from a greater number of employment, retail, leisure and living options. Objective 7: To evaluate the relative importance of each mill There is little merit in protecting a building purely on the basis of age, if it does not contribute in some way to the betterment of the local and wider community, or indeed even detracts from it. Resources are too finite and needs too great to waste time and funding for little benefit. Therefore, mills need to be prioritised. The mills’ architectural merit, its historic and aesthetic value to the locality, its economic usefulness, ability to adapt, physical condition, and its role in serving the needs of the community all need to be considered. Those mills scoring most highly across these criteria and most vulnerable to decline will represent the highest priorities for the Council and partners to instigate all available methods of support. 3.0 The Action Framework 3.1 Introduction The following section outlines the tasks and proposals that comprise the Action Framework. The tabular form that Section 3.4 takes is intended to provide a user-friendly and readily accountable list of projects to be undertaken over the lifetime of the Framework. There is no formalised deadline given for the extent of the Framework’s lifespan, it is to be considered a dynamic and ever-changing entity responding to the changes in circumstances that will inevitably affect all of Bolton’s mills over coming years. What will be necessary is review and updating of the Framework’s objectives and of the tasks and targets as each is delivered and new ones become apparent. Section 3.2 below outlines the issues to be addressed by the Framework, under which individual tasks sit. These broad issues were developed through the detailed survey and case study analyses undertaken throughout the first half of 2006. Following the analyses it became apparent that these particular issues were of importance and by tackling them we can attempt to meet the Objectives. The issues affect the Council and other funding and/or statutory bodies, mill-owners, other stakeholders such as potential investors, and the local communities in which mills sit. 3.2 Key Issues of the Framework The assessment of mills As noted in Section 2, there is little merit in protecting a building purely on the basis of age, if it does not contribute in some way to the betterment of the local and wider community, or indeed even detracts from it. Therefore the Action Framework has developed a user-friendly mills assessment matrix, which takes into account employment, heritage and regeneration issues, to be applied for each mill over the coming months and years. In time a full list of mills, prioritised by a range of issues needs to be developed to assist in the targeting of Council resources. Informing future planning policy The most notable aspect of the research with regard to planning policy was that a pressure exists in many areas to convert mills to non-employment (usually residential) uses, yet many mills remain designated as employment sites, primarily due to the Council’s understandable concern over the loss of scarce employment land across Bolton. However, at the same time the quality of the employment space provided by mills was often not of a standard that met the requirements of potential investors, creating an unsatisfactory situation in which no party benefits. The most significant solution is to ensure that if mills are allowed to be converted to non-employment 12 use, a contribution from the developer is secured, and this contribution is used to maximise the quality of employment space elsewhere which may have otherwise struggled to obtain such investment. The intricacies of developing such a policy are under investigation by Bolton Council at present and are included in the Action Framework, with the recognition of the elongated timescale applicable to statutory planning matters. Furthermore, it should be noted that a significant number of mills have no specific use designation at present, which will limit the scope of a developer contribution policy. Planning policy has a key role in the conservation of mills, and as outlined elsewhere in this Action Framework, a proportion of mills are Listed Buildings, whilst others sit within wider Conservation Areas. Yet some of these buildings face an uncertain future through misuse or under-investment, and intervention on the basis of needing to guarantee physical protection may be required. In cases of unallocated mill premises that score highly in the mills assessment it may be necessary to evaluate the potential to provide a protective designation. Provision of assistance to mill-users It became apparent from the analysis undertaken that some owners have little technical knowledge or experience in handling a mill property. Some owners are actively seeking external assistance, in the form of exchange of experiences between owners and mill-users, and guidance from the Council or other groups with relevant specialist skills on such issues as funding, mill maintenance, engaging and negotiating with contractors, engaging and negotiating with lessees, advertising, planning and building control, security, and design. Hartford Tannery Encouraging use of mills (attracting occupiers) The Council is often the first source of information for potential investors, and therefore in a position to co-ordinate between the mill resource and the users who may well be suited to this space, so exploring how this relationship can be enhanced to facilitate efficient exchanging of information is important. Promoting the mills resource Whilst always a difficult concept to quantify, few people doubt that a positive image can help an area or a business become more successful, both economically and culturally – the transformation of redundant industrial space into sought after residential space in many UK cities is an example of both occurring simultaneously. There is no reason why the same logic cannot be applied to Bolton’s mills and examples made of successful re-use or innovative methods to improve their appearance, economic viability, role in the community or structural soundness. Exploring funding opportunities In the present climate, mainstream funding opportunities are becoming scarce. However, there are still a range of sources that can assist in the physical and infrastructural work needed in and around mills, if particular criteria can be met, and it is important to outline these opportunities. At the same time, it is also imperative that all parties recognise the considerable limitations of funding sources, so as to reduce mill-user’s concerns that they are missing out on such opportunities. Focusing on delivery There are a range of policy tools that the Council can mobilise to catalyse investment in areas requiring regeneration, including of course, areas with one or more mills at their heart. These can take the form of studies leading to policy updating, such as masterplans, area development frameworks, and Area Action Plans, and more wide-reaching financial tools such as engaging in joint ventures with the private sector, and even utilising prudential borrowing to raise finance. Administrative delivery of proposals is also a major issue – and Bolton Council will need to evaluate their resources to determine what level of staffing and time can be provided to deliver the objectives and tasks set out in the Action Framework. 3.3 Monitoring and Review This exercise has been invaluable in providing Bolton’s most comprehensive mill resource review in many years. It is vital that the evidence base developed at this time is not seen simply as a snapshot in time, but a dynamic entity constantly updated as and when new uses and users are found for each of Bolton’s mills. For the purposes of simplicity the task of monitoring the progress of the Action Framework is included within the delivery section of the table below, as it is considered that successful long-term delivery will only occur with ongoing monitoring and review. 13 Mills Action Table Action Task & Purpose 1 Mills Assessment Assessment and Prioritisation The Council will seek to prioritise all mills in Bolton through the assessment matrix, taking into account each mills architectural and heritage value, its present condition, its role in the local community and its value to the economy and potential to drive regeneration and economic growth. Please refer to Mills Assessment and Prioritisation System in Section 4. 2 Planning Policy Recommendations Planning Policy Recommendations Use of planning-based regenerative Studies Use of Compulsory Purchase Orders Use of Listed Building and Conservation Area designations 14 The Council will seek to develop and adopt innovative and flexible planning and land-use policies from which to develop a legally robust approach to ensure the loss of employment space is mitigated by contributions from developers through Development Agreements, Planning Obligations and the establishment of an Employment Land Development Fund. This approach would also help to encourage mixed use development of vacant mill space, especially those that are currently under utilised for employment. Please view specific planning tasks below. The Council will consider financing area-focused studies where it is apparent that the health of a mill or mill cluster is predominantly based on external rather than building specific factors. The form of the study will be determined on a case by case basis. The Council will where necessary use its Compulsory Purchase Order powers for the purpose of regenerating mills and their wider localities. The Council will where necessary use its powers under the Planning (Listed Buildings and Conservation Areas) Act 1990 to serve urgent works and repairs notices as appropriate. Resourcing Timescale: All mills to be initially assessed within 2 years. Pilot assessment completed within 6 months. Comment: Process to begin as soon as mills assessment methodology has gained widespread stakeholder support. Review should take the form of a ‘rolling’ update as and when development occurs in or immediately adjacent to mills. A Pilot Area contains a small number of mills should be initially assessed to test the process. The process should also be applied to all mills within any area based studies. Timescale: Ongoing Comment: Particular opportunities exist in the short to medium term as Local Development Framework supersedes Unitary Development Plan and Bolton’s policies are reviewed. These issues relate directly to mills, but also the wider employment land resource in Bolton. The Council will seek to develop the necessary planning framework within the next 2 years or as quick as processes allow. Timescale: Within 12 months. Comment: If economically viable, the Council will aim to initiate one new area based study within a year of the Action Framework becoming active. Timescale: As required. Comment: Mills assessment and future areasbased studies will assist in identifying priority sites. CPO powers would only be utilised as a last resort and where financial resources have been identified. Timescale: As required. Comment: Mills assessment process will assist in identifying priority buildings to address. Action Task & Purpose Resourcing 3 Assisting mill-users Technical assistance to mill-owners Information pack Newsletters Website The Council will seek to be increasingly pro-active in supporting mill owners and other stakeholders involved in the maintenance of mills. The Council will provide mill owners – and other stakeholders as deemed appropriate – with an outline of the Action Framework and an update on proposals for the future, including the availability of further information and assistance. The opportunity exists to gain feedback on the desire for, and preferred form and content of, training workshops, web-based data, and newsletters. The Council will produce an annual newsletter for circulation to stakeholders including mill owners to promote an exchange of experiences and updates on key events. The Council will ensure that a dedicated link and series of pages on bolton.gov.uk will be developed containing the key elements of the Action Framework and information about upcoming mill-related events and links to and guidance about potential funding streams. Contact details for mill-owners and other stakeholders to utilise will be provided. 4 Attracting Occupiers Attracting occupiers Register of vacant space The Council will seek to maximise occupancy of all Bolton’s mills with sustainable users. The Council will build and maintain a record of available employment space in Bolton’s mills, and seek to actively market this space at suitable opportunities. The Council is often the first point of call for potential investors and a comprehensive register of vacant space will be hugely beneficial. Timescale: Ongoing. Comment: A range of communicative measures to provide a stronger link between the Council and other parties with an interest in Bolton’s mills will be instigated. Timescale: To be undertaken as priority – i.e. within 6 months of Framework becoming active. Timescale: Annual newsletter to be circulated. Comment: First step is to build an in-house database of recipients, building on initial information gained from mills survey. Timescale: Links to be developed as a priority - within 6 months – ongoing development to occur over coming years. Timescale: Ongoing. Comment: Bolton Council will take all reasonable measures to ensure mills are at the forefront of investment/ relocation/ start-up decisions. Timescale: Within 24 months. Comment: The Council will also discuss with mill-owners the possibility of marketing available space through their online resource. 15 Action Task & Purpose Resourcing 5 Promotion Positive use of the media The Council will provide press releases to the regional and local press in order to stimulate positive media attention. National Mills Conference The Council will evaluate the potential benefits of providing specific presentation(s) at upcoming and future Mills Conferences. Lobbying of key stakeholders The Council will raise the profile and wider understanding of the issues facing Bolton’s mills by undertaking a co-ordinated campaign of lobbying local, regional and European politicians and organisations. Timescale: Each six month period. Comment: No significant period of time (6+ months) should be allowed to elapse without some form of positive media coverage. Timescale: If required. Comment: If deemed beneficial by the Mills Action Framework team the Council will aim to outline the Framework to a national audience. Timescale: Ongoing. Comment: The Council will take positive attempts to make representation to MPs, MEPs and Regional Bodies such as the NWDA as mills are a significant element of regeneration in the area and one where regional, national and/or European funding could produce significant benefits. 6 Funding Funding opportunities Establishment of an Employment Land Development Fund The Council will provide guidance on when and where funding may be attainable for mill-owners. Where applicable, the Council will look to obtain compensation payment (under Section 106) for the loss of employment space to other higher value uses; and to establish a fund which can be used to provide assistance to employment projects in mill buildings. Timescale: Initial information provided within 6 months, and regularly updated. Comment: Funding will be undoubtedly limited in coming years; however the Council will provide details of any potential availability to mill owners through a range of information sources, commencing with the delivery of information packs. Timescale: To be determined. Comment: Council will aim to develop necessary planning framework to facilitate development of Employment Land Development Fund within shortest timescales statutory processes allow. 7 Delivery Ensuring delivery of Action Framework Monitoring and review 16 The Council will maintain its support for the Mills Action Framework. The Council will co-ordinate and undertake the tasks set out in this Action Framework, subject to resources. The Council will continually monitor and review the progress of the Mills Action Framework Timescale: Ongoing. Comment: The Action Framework will remain at the forefront of important policy for the Council for as long as deemed necessary. Timescale: Annual review supported by ongoing monitoring. Comment: It is recommended that an annual progress report is written on the Mills Action Framework. Appendices Appendix A Bolton Mills Assessment Matrix A1 Introduction In this section we describe the system devised to assess and prioritise mills within Bolton. This involved firstly looking at the issues to be considered then devising a scoring system. Any assessment and prioritisation methodology is, of course, subjective. To ensure that there is stakeholder “buy in” to the methodology it will be important to discuss the issues, scoring and weighting systems with these individuals and bodies. These issues are discussed below. The first stage in developing the assessment system is to identify the issues to be included in the methodology. The view is that there are three main issues when it comes to assessing the “value” of a mill. These are the contribution the building makes to heritage, regeneration and to the economy. The initial intention was to score each issue from 1 to 5. This was subsequently changed to '-2' to '+2' so that we ended up with positive and negative scores with the '0' score being neutral. A2 Heritage The heritage issues are an amalgam of a number of different issues: Age: One criterion is the age of the building. If a building has survived for a few centuries then it is considered to have heritage value regardless of its architectural merit or history. Conversely, more recent buildings have to be exceptional. History: Buildings have heritage value if they are associated with historic events or characters. In this respect the mills of Bolton are undoubtedly significant in terms of the Industrial Revolution. First of its kind: Linked to this is the heritage value of buildings that were the first of their kind - the first fireproof mill, the first mill using concrete in the world, country or town etc. The last of their kind: Alternatively, they may have become rare because all the others like them have been demolished. Rarity: A slightly different issue is heritage value associated with the rarity of a building – the only church for example by a particular architect. Completeness: English Heritage stresses the value of the completeness of the site where the survival of the component parts of a mill complex allows the manufacturing processes to be understood. 18 Social significance: There are mills which are not particularly historic, old or rare that nevertheless are an important part of the area's history and its people. Architectural quality: Heritage is also related to the architecture of the building; the beauty of its construction or decoration, or the innovative nature and elegance of its construction. Townscape quality: Also important is the contribution of the building to the public realm of the area. Heritage value is an amalgam of these issues, all of which contribute to decisions to list a building or to declare a Conservation Area. However of the 108 mill buildings in Bolton, only 17 were listed. Clearly it is not possible to rely on the listing system nor would it be practical to deal with each of the above issues. We therefore decided to distil the nine issues above into four core heritage issues. Social and historical significance: The building has played a role in the social and economic history of the area that is: +2 +1 0 -1 -2 Unique Important Moderate Of little importance Insignificant This issue therefore picks up mills important to Bolton regardless of their significance and or rarity outside the area. Rarity/importance: Because of its age and rarity the building is of: +2 +1 0 -1 -2 National/international Importance Regional/city wide importance Local importance Little importance No importance This is more familiar territory and combines issues such as age, history and uniqueness. The scoring is also more familiar in that it relates to criteria used for listing. Initially the scoring was more spread out with separate categories for international, national and regional. However this meant that we had a small number of mills in the top category then all of the other buildings scoring very poorly. Therefore as part of the aim to make '0' a neutral score we combined these categories into just two positive categories. Appendix A Bolton Mills Assessment Matrix Listed status: As a result of its construction and architecture the mill is: +2 +1 0 -1 -2 Listed Locally significant A reasonable building A bland building A poor building It was recognised that this category is not ideal. We wanted to reflect architectural quality and construction although to an extent the architectural beauty of mills is in the eye of the beholder and subject to some dispute. We are also aware that listing is not just a reflection of architecture but felt that it should be part of the system. The next category then includes all buildings that might be candidates for listing or at least local listing and the '0' category is for building that will never be listed but which are nevertheless of good quality and contribute to the area. Townscape: Due to its location, size and massing the building, if refurbished would: +2 +1 0 -1 -2 Contribute positively to a key frontage or landmark Contribute positively to a secondary frontage or local landmark Contribute to another frontage Not be visible from the public realm Detract from a frontage in the area A3 Regeneration We identified seven issues which are listed below: Catalytic effect: This goes to the heart of regeneration and is based upon the impact that investing in a particular mill will have on the prospects for regeneration in the wider area. The refurbishment of a large, prominent building will change the image of the area and boost confidence and values while a smaller development in the heart of the area might have little impact. It is also possible to imagine the development of a poor building or an existing non-conforming use that could reduce prospects for regeneration. Adaptability: This takes into account the extent to which buildings can be converted to modern uses or whether there are problems with configuration, floor plan depth and access which made reuse difficult. Attractiveness to the market: This takes into account the location and condition of the building but also known developer interest. Viability: The combination of attraction to the market, condition and adaptability will affect the viability of a building and the likely requirement for grant. Building condition: It was decided that we should consider condition because of the depressing effect of dereliction of the surrounding area and because of the risk of the building being lost. As with the heritage issues, it was decided to distil regeneration from seven to four issues. Catalytic effect: The mill would: +2 +1 0 -1 -2 Be a key to the regeneration of an area Be a key to the regeneration of a local area Have little wider impact Inhibit the regeneration of the local area Inhibit the regeneration of an area +2 +1 0 -1 -2 In a critical condition or at risk of rapid decline In a poor condition but stable Mothballed/ enveloped In a reasonable condition and stable Recently refurbished/in a very good condition +2 +1 Attractive to the market Attractive to the market with a small amount of grant Attractive to the market only with a substantial grant Currently unattractive to the market Unlikely ever to be viable Condition/risk: The mill is: Viability: The mill is currently: 0 -1 -2 It is not proposed that financial appraisals should be carried out of all 108 mills within Bolton. Under this heading, officers should seek to find out if there is any market interest in a mill and what this is for, whether they are seeking financial assistance etc. This will assist in scoring this criterion. Physical adaptability: Due to its size, configuration and structure the building is: +2 +1 0 -1 -2 Universally adaptable to a range of uses Presents few problems for reuse Is problematic due to its scale and configuration Is very difficult to reuse Is unusable 19 Appendix A Bolton Mills Assessment Matrix A4 Economics Finally of key importance to Bolton Council is the contribution that mills make to the economy of the area. Mills were originally the powerhouses of the local economy. Nowadays there are almost no mills being used for their original purpose. The buildings however have shown their adaptability for employment purposes by providing a wide range of employment space from cheap (50p a sq ft) storage space, through cheap and cheerful workspace accommodation to manufacturing space and to a wide range of type of offices. There are a number of issues that can be taken into account: Amount of employment space provided: Whereas the amount of floorspace provided can be a useful indicator of the economic value of a mill it takes no account of condition, utility or demand. There is no hard and fast way of scoring this criteria. The number of jobs could be used but an important contribution in one area might be 200 jobs but in another 50 might be very significant. We would recommend a subjective approach to this criterion. Harm may be caused to a local economy by the blighting effect of a mill. The second is the potential that the mill has for contributing to the local economy: +2 +1 0 -1 Could make an important contribution to the local economy Could make a contribution to the local economy Will make no contribution to the local economy Will harm the local economy This criterion would have to measure the potential and realism of the building to be refurbished for employment uses. Quality of employment space provided: Good quality space is clearly important in terms of the economic value of a building but again there must be a demand for this type of space to realise that value. Current impact on the local economy: This would be a factor of the number of local jobs that the mill housed. Many mills provide employment for surrounding deprived areas as well as providing a “rung in the ladder of accommodation” which enables new firms to take cheap space, grow and then move to better quality accommodation once the company is established and profitable. Potential impact: Some buildings because of their location, standard of maintenance, proximity to areas of high unemployment, lack of nearby “starter”/ easy-in-easy-out accommodation may, if investment is channelled into them make a contribution to the local economy. There are probably further criteria but at this stage we consider the two most important relate to a mill’s current impact on the local economy and also the potential impact it may make on the local economy. First is the contribution that a mill currently makes to the local economy: +2 +1 0 -1 Makes an important contribution to the local economy Makes a contribution to the local economy Makes no contribution to the local economy Harms the local economy Sir John Holden Mill 20 Appendix A Bolton Mills Assessment Matrix A5 Running the methodology Each mill to be considered is then scored using the scoring system outlined above. In calibrating this system it will be first necessary to score a number of buildings. The results thrown up by this method need to be examined by a panel of “experts/stakeholders” to discuss and derive a “standard approach”. It may be necessary to alter the scorings or weight certain criteria heavier than others to provide an outcome which meets the views of the panel. A hypothetical example of the scoring is provided below: Social & Heritage Significance Rarity/Importance Listed Status Townscape Catalytic Effect Condition/Risk Viability Physical Adaptability Mill 1 1 1 2 1 2 -1 2 1 Mill 3 -2 -2 -1 -1 -2 1 Mill 2 Mill 4 1 1 1 1 2 2 2 2 1 2 2 1 0 -2 -1 0 1 -1 Local Economy Issues TOTAL SCORE Potential Contribution Regeneration Issues Heritage Issues Current Contribution MILL 1 2 12 -1 -10 2 -1 2 2 1 13 10 The assessment model needs to be tested by a panel of stakeholders – so to gain agreement to the criteria to be used, the scores to be allocated, and possible weighting that needs to be added to any criteria. A6 The product This assessment when fine tuned will provide a “tool” for the Council to identify on one hand mill buildings that are important and should be saved/refurbished and on the other side mill buildings that have no heritage, regeneration or economic worth and perhaps should be considered for demolition. It must be stressed that this is a tool to be used alongside officer’s own judgement and other relevant information. 21 Appendix B Funding opportunities B1 Introduction The availability of public sector funding to assist the refurbishment of mills in Bolton is relatively scarce. The public sector has many calls upon its limited resources. We have set out below the usual sources for public sector funding and have sought to explain their likely availability or non-availability. B2 European Funding The European Regional Development Fund would have been a logical source of funding to create a business enterprise accommodation, focusing on the development of small and medium sized businesses, in mills in Bolton. However the current programme 2000-2006 expires at the end of this year. Consultation is taking place on a new programme 2007-2012, however given the expansion of the European Union, areas like Bolton will have even less priority for stretched European Funding. If funding is made available to the area it is likely to focus upon education, training, skills development, business support and the like, rather than physical development. What European Funds are made available to the region will be the subject of much competition. B3 Northwest Regional Development Agency The Agency operates a delegated system of funding approval. Sub-regional partnerships, in Bolton’s case, at the Greater Manchester level, assemble business plans for their areas, which in effect is a bid for the Agency’s funds. Projects must be consistent with the Regional Economic Strategy (RES). NWDA funding is limited and there are many calls upon it. The prospects for obtaining funding for mill conversion is therefore likely to be severely limited - however this should not prevent good schemes that satisfy RES objectives and will have a catalytic impact from being submitted to the Agency. B4 English Partnerships Given English Partnerships (EP), the national regeneration agency, commitment in surrounding authorities with Housing Market Renewal Pathfinder initiatives, it is unlikely that they would be persuaded to become involved in refurbishing mills in Bolton. B5 Lottery Funding There may be opportunities through the Heritage Lottery Fund for assistance towards the protection/refurbishment of mill buildings, but again this is a scarce resource and competition for funds is fierce. There are a number of areas, like the Moses Gate area, where funding could be sought through Townscape Heritage Initiative funding. This source of funding will require match funding from other public sector sources. Funding can be used for public realm works and building restoration in the area. 22 As Bolton already has a THI, in the town centre, the prospects to obtain another are limited. B6 Planning Obligations – Creating an Employment Land Development Fund Informed in part by this study, Bolton Council is considering the implications of adopting a clear and reasonable developer contributions policy to be utilised when a change of use application is submitted for employment allocated sites. Where this change is to a higher value use we have proposed a system which allows a charge to be levied on a developer as compensation for the loss of employment land. These charges could be collected into a fund – the provisionally entitled Employment Land Development Fund - which could then be used by the Council to carry out activities which assist local economic development. A primary objective of this fund might be to assist in the repair and refurbishment of mills in employment use – though it would have to take into account all employment allocated or former employment sites, not simply mill premises. Analysis of such policies elsewhere, and the early stages of Bolton Council’s policy formulation have been undertaken, and this information is now with the Council for further consideration. Given the complexities of the statutory planning process this option has to be viewed as a longer-term option. B7 Bolton Council Like many Councils, Bolton does not have the financial resources sufficient to tackle all of its regeneration priorities and is reliant on other sources whether this be, NWDA, Lottery or Europe. However, as outline above, support from these sources is uncertain and likely to be scarce. This situation, applicable to almost all local authorities, has been recognised by central Government and local authorities are being asked to consider how they can make better use of their land and property assets to deliver regeneration. This is a borough wide issue and not just restricted to mill development. It is therefore not thought appropriate to go into this potential source. Appendix B Funding opportunities B8 Private Sector Funding In the light of the above showing the scarcity of public sector assistance, the main source of funding for the refurbishment of mills will have to come from the private sector. To enable the private sector to invest in this valuable asset there are a number of actions that the Council can consider: • To provide clear policy guidance; • To be flexible in allowing higher value uses into mill buildings; • To prepare masterplans/development frameworks which give developers a clear understanding of the future direction of development within an area; • To assist the exchange of best practice between mill developers; • To direct mill developers to skilled practitioners and trades people; • To consider investing in areas surrounding mill buildings, i.e. new roads, landscape improvements, etc; • To consider taking space within refurbished buildings. All these actions can play an important role in giving developers confidence to invest in a mill project. B9 Note on State Aid Limitations At present assistance to the private sector from the private sector is limited by European Commission “State Aid” rules. These limit the amount of public assistance to large developers to 15% of the capital cost of a project. Small or medium sized developers can access up to 25%. There are exceptions to this which include residential development (up to 60%), heritage schemes (up to 100%) and reclamation where some refurbishment of mills could be acceptable (up to 100%). These rules are currently being reviewed by the UK Government and Europe. The new scheme is likely to come into force at the beginning of 2007. 23