* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download EDS 04-8000A Grid Transformer Schedules
Pulse-width modulation wikipedia , lookup
Ground loop (electricity) wikipedia , lookup
Electric machine wikipedia , lookup
Solar micro-inverter wikipedia , lookup
Thermal runaway wikipedia , lookup
Ground (electricity) wikipedia , lookup
Electrical ballast wikipedia , lookup
Power inverter wikipedia , lookup
Power engineering wikipedia , lookup
Mercury-arc valve wikipedia , lookup
Current source wikipedia , lookup
Single-wire earth return wikipedia , lookup
Surge protector wikipedia , lookup
Resonant inductive coupling wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Stray voltage wikipedia , lookup
Voltage regulator wikipedia , lookup
Power MOSFET wikipedia , lookup
Power electronics wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Stepper motor wikipedia , lookup
Earthing system wikipedia , lookup
History of electric power transmission wikipedia , lookup
Distribution management system wikipedia , lookup
Buck converter wikipedia , lookup
Three-phase electric power wikipedia , lookup
Opto-isolator wikipedia , lookup
Voltage optimisation wikipedia , lookup
Current mirror wikipedia , lookup
Mains electricity wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Electrical substation wikipedia , lookup
Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : Schedules - Index 1 SCHEDULE A - General Particulars of Definite Requirements ................................... 2 2 SCHEDULE B - Commencement Date and Date of Readiness for Inspection, Testing, Access to Site, Delivery and Completion ................................................................. 4 3 SCHEDULE C - Manufacturers and Place of Manufacture, Testing and Inspection ..... 6 4 SCHEDULE D - General Particulars and Guarantees ................................................. 9 5 SCHEDULE E - Drawings, Data, Assembly, Operating and Maintenance Instructions, Models and Samples ........................................................................................... 45 6 SCHEDULE F - Tests .............................................................................................. 49 7 SCHEDULE G - Items of Equipment with Prices...................................................... 51 8 SCHEDULE H - Summary of Price and Quantities for Definite Work ....................... 52 9 SCHEDULE J - Prices for Work at the Option of the Purchaser ................................ 53 10 SCHEDULE K - Access and Site Facilities ................................................................ 54 11 SCHEDULE L - Proposed Exceptions or Additions to the Standard .......................... 55 12 SCHEDULE M - List of Special Tools and Equipment to be Used ............................. 56 Page 1 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Grid Transformer Schedules Substation:…………………… SCHEDULE A - General Particulars of Definite Requirements Item Description 1 Name of substation 2 Postal/delivery address 3 Designation of transformer(s) UK Power Networks Requirements See Schedule K SUMMARY OF DEFINITE REQUIREMENTS 4 Number of main transformers required …..…………. a) Method of cooling…………………………………... b) Single or dual secondary windings……………….. c) Rated continuous output power (forced) .................... MVA d) Rated voltage ratio on principal tap ................................ kV e) Vector group symbols……………………………… f) Method of HV neutral earthing……………………. g) Method of LV neutral earthing…………………….. 5 Number of auxiliary/earthing transformers required…………..state which here. a) Rated continuous output power (ONAN)……kVA b) Rated voltage ratio on principal tap……………kV c) Vector group symbols……………………………… 6 Number of HV earthing resistors / reactors req. State which here…… 7 a) Rated impedance ............................................................ b) Rated short-time current ............................................... kA c) Rated duration of short-time current ............................... s Number of LV earthing resistors / reactors req. State which here…… a) Rated impedance ............................................................ b) Rated short-time current ............................................... kA c) Rated duration of short-time current ............................... s 8 Number of tap-change control marshalling boxes required ..... 9 Number of cooler control marshalling boxes required 10 Number of remote voltage control cubicles required Page 2 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE 1 Document Number: EDS 04-8000A Version : 2.0 Design doc No : Substation:…………………… 11 Number of sets of special tools and equipment (if any) required ..................................................................................... 12 Installation and site pre-commissioning required ..................... Note 1: above. Document Number: EDS 04-8000A Version : 2.0 Design doc No : For Item 4a), Supplier to determine appropriate method of cooling if not stated Page 3 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Grid Transformer Schedules Substation:…………………… SCHEDULE B - Commencement Date and Date of Readiness for Inspection, Testing, Access to Site, Delivery and Completion (To be completed by the Tenderer) COMMENCEMENT DATE………………………. Calendar Months Item Times from Commencement Date 1 Within which outstanding Schedule D information will be provided........ 2 Within which the material will be ready for inspection and testing: a) Main transformers .............................................................................. b) Auxiliary transformers ......................................................................... c) HV earthing resistors / reactors .......................................................... d) LV earthing resistors / reactors ........................................................... e) Tap-change control marshalling boxes ............................................... f) Cooler control marshalling boxes........................................................ g) Standby voltage control cubicles ........................................................ 3 Within which the Contractor will require access to the site for erecting: a) Main transformers and ancillary equipment ...................................... b) Standby voltage control cubicles ........................................................ 4 Within which the material will be delivered to the site: a) Main transformers .............................................................................. b) Auxiliary transformers ......................................................................... c) HV earthing resistors / reactors .......................................................... d) LV earthing resistors / reactors ........................................................... e) Tap-change control marshalling boxes ............................................... f) Cooler control marshalling boxes........................................................ g) Standby voltage control cubicles ........................................................ 5 Within which the work will be completed, tested and ready for continuous use........................................................................................... Page 4 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE 2 Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : PLANNING AND PROGRESS OF WORK The works shall be carried out and completed in accordance with the Contract completion date stated below. The Contractor shall submit a Plant Manufacture, Delivery and Erection Programme for the approval of the Engineer. Three copies of the above mentioned Programme shall be provided by the Contractor. If at any time during the execution of the Contract the Contractor finds it necessary to modify any approved Programme, the Contractor shall inform the Purchaser immediately and submit a modified Programme for his approval. The submission of a modified Programme shall not have effect as a claim by the Contractor for an extension of time for completion as provided by the Conditions of Contract, nor shall the approval of such modified Programme have effect as the grant of such extension of time fixed by the Contract for the completion of the Works. Progress of Plant Manufacture in Contractor's Works Progress of manufacture in relation to the detailed Plant Manufacture and Delivery Programme shall be reported on an approved form at such frequency as may be required. Access to the Contractor's and Sub-contractor's works shall be granted to the Purchaser at any reasonable time for the purpose of ascertaining progress and checking quality. Progress of Work on Site Progress of Site Work in relation to the detailed Plant Erection Programme shall be indicated on an approved form and submitted monthly or at such other intervals as required by the Purchaser. These submissions shall include a schedule of Site Labour. Delivery and Take-over Dates for Completed Work Confirmation is required that the Tenderer can meet the following proposed Dates: Factory Acceptance Dates Take-over Dates Damages for late delivery shall apply in accordance with Terms and Conditions. Page 5 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Planning of Work Grid Transformer Schedules Substation:…………………… SCHEDULE C - Manufacturers and Place of Manufacture, Testing and Inspection (To be completed by the Tenderer) Item Manufacturer’s Drawing Number and/or Type Designation Manufacturer Main transformers Auxiliary transformers Neutral earthing resistors On-load tapchangers HV bushings LV Bushings Neutral bushings Insulating cylinders Core plate Copper Aluminium Steel tanks Radiators Pipework / expansion devices Oil Oil valves Oil pumps Oil pump motors Oil flow indicators Page 6 of 56 Place of Manufacture Place of Testing and/or Inspection THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE 3 Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : Item Manufacturer’s Drawing Number and/or Type Designation Manufacturer Fans Fan Motors Gaskets for oil tight joints Pressure relief devices Conservators Oil level indicators Dehydrating breathers Rubber bag Gas and oil actuated relays Tap-changer control marshalling cubicles Cooler control marshalling cubicles Winding temperature indicating devices Current transformers Page 7 of 56 Place of Manufacture Place of Testing and/or Inspection THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE SCHEDULE C (CONTINUED) Grid Transformer Schedules Document Number: EDS 04-8000A Version : 2.0 Design doc No : Substation:…………………… Item Manufacturer’s Drawing Number and/or Type Designation Manufacturer Standby voltage control cubicles Voltage control relays Auxiliary relays Voltmeters Tap position indicators Control and selector switches Material for anti-vibration mountings Dissolved gas in oil monitor Oil dry out device Oil/water heat exchanger Page 8 of 56 Place of Manufacture Place of Testing and/or Inspection THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE SCHEDULE C (Continued) Grid Transformer Schedules Substation:…………………… 4 Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE D - General Particulars and Guarantees Item Control, Indication, Alarm and Trip If Req Type of Control, Indication, Alarm and Trip CONTROL 1 Local electrical control of on-load tap-change equipment 2 Standby electrical control of on-load tap-change equipment 3 Remote electrical control of on-load tap-change equipment 4 Remote voltage reduction (load shed) in addition to standby control 5 Local electrical control of cooling equipment 6 Electrical control of cooling equipment INDICATIONS 7 Local tap position indication 8 Standby tap position indication 9 Remote tap position indication 10 Standby main transformer volts 11 Remote main transformer volts 12 Local main tx winding temperature 13 Remote main tx winding temperature Page 9 of 56 If to be Supplied by Tenderer Operating Supply Voltage THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE PART I GENERAL PARTICULARS OF CONTROLS, INDICATIONS, ALARMS AND TRIPS Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : Item Control, Indication, Alarm and Trip If Req Type of Control, Indication, Alarm and Trip ALARMS 14 Tap- changer faulty 15 Main transformer winding temperature 16 Tap-changer Temperature 17 Main gas and oil actuated relay 18 Auxiliary transformer gas and oil actuated relay 19 Neutral earthing reactor gas and oil actuated relay 20 Pump fail 21 Fan fail 22 Dehydrating breather fail 23 Conservator low oil level 24 Gas-in-oil monitor Stage 1 and Stage 2 25 On-line moisture management faulty Page 10 of 56 If to be Supplied by the Tenderer Operating Supply Voltage THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE SCHEDULE D, PART I (CONTINUED) Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : Item Control, Indication, Alarm and Trip If Req Type of Control, Indication, Alarm and Trip TRIPS 26 Main transformer winding temperature 27 Main transformer oil temperature 28 Tap-changer temperature 29 Main gas and oil actuated relay 30 Tap-changer oil actuated relay 31 Auxiliary transformer gas and oil actuated relay 32 Neutral earthing reactor gas and oil actuated relay 33 Pressure relief device Page 11 of 56 If to be Supplied by the Tenderer Operating Supply Voltage THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE SCHEDULE D, PART I (CONTINUED) Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE D (Continued) Item Description UK Power Networks Requirements OPERATING CONDITIONS 1 Location (Indoor or Outdoor) Ambient air temperatures: a) 2 Minimum daily ...........................................................……………………….….C b) Maximum daily ............................................................... ………………….….C c) Maximum monthly average ..................................................... …………….C d) Maximum daily annual average ............................................... …………….C 3 Load power factor ....................................................................................... P.U. RATING 4 No-load voltage ratio on principal tap ........................................................ kV Rated power (forced cooling): 5 a) Rated continuous output .................................................................... MVA b) Maximum ambient air temperature ....................................................... C c) Maximum hot spot temperature ............................................................ C Rated power (ONAN): 6 a) Rated continuous output .................................................................... MVA b) Maximum ambient air temperature ....................................................... C c) Maximum hot spot temperature ............................................................ C CER rated power: 7 a) Rated continuous output .................................................................. MVA b) Maximum ambient air temperature ..................................................... C c) Maximum hot spot temperature .......................................................... C Rated power (normal cyclic loading): a) Rated output ..................................................................................... MVA b) Duration .................................................................................................. h 8 c) Maximum ambient air temperature ..................................................... C d) Maximum hot spot temperature .......................................................... C e) Load cycle ............................................................................................... h f) Rated output (remaining cycle) ........................................................ MVA ALTERNATIVE RATING 9 Whether dual voltage ratio is required........................................................... 10 Alternative rated voltage ratio ................................................................... kV Page 12 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE PART II (i) GENERAL PARTICULARS OF MAIN TRANSFORMERS Grid Transformer Schedules Substation:…………………… Item Document Number: EDS 04-8000A Version : 2.0 Design doc No : Description UK Power Networks Requirements 11 a) THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Rated power (forced cooling): Rated continuous output .................................................................. MVA b) Maximum ambient air temperature ..................................................... C c) Maximum hot spot temperature .......................................................... C Rated power (ONAN): 12 a) Rated continuous output .................................................................... MVA b) Maximum ambient air temperature ....................................................... C c) Maximum hot spot temperature .......................................................... C CER rated power: 13 a) Rated continuous output .................................................................... MVA b) Maximum ambient air temperature ....................................................... C c) Maximum hot spot temperature ............................................................ C Rated power (normal cyclic loading): a) Rated output ..................................................................................... MVA b) Duration .................................................................................................. h 14 c) Maximum ambient air temperature ..................................................... C d) Maximum hot spot temperature .......................................................... C e) Load cycle ............................................................................................... h f) Rated output (remainder of cycle) ................................................... MVA WINDING CONNECTIONS Delta connected tertiary winding, when to be designed for external loading: 15 a) Rated voltage ........................................................................................... kV b) Rated continuous output (forced cooling) .......................................... MVA Winding connections: a) HV windings ............................................................................ Star / Delta b) LV windings ............................................................................. Star / Delta 16 17 c) Tertiary windings ...................................................................................... d) BS vector group symbols .......................................................................... e) Whether links are required for alternative vector group ......................... f) Whether links are required to change tapping range............................... g) Alternative BS vector group symbols ........................................................ Voltage limiting devices: a) Whether required ....................................................................................... b) Whether internal or external to main tank ................................................ c) Type ............................................................................................................ PERFORMANCE CHARACTERISTICS 18 See Annex C Impedance voltage envelope at 75C Page 13 of 56 Grid Transformer Schedules Substation:…………………… Description 19 Zero-sequence impedance: a) UK Power Networks Requirements as a % of positive-sequence component ...............................................% b) as value of ohms/phase ....................................................... ohms/phase 20 90-100 Short circuit capability: a) Max. available at HV terminals (3 phase/1-phase) ..........................................................................................................MVA b) Max. available at LV terminals (3-phase) .........................................MVA c) At external terminals of the delta connected tertiary winding with simultaneous HV and LV infeed shall not exceed ....................................MVA refer to table 4 of standards unless higher ratings required. 21 Rated Insulation Level: a) 22 132kV Lightniimpulse............................................................................ kV 550 b) 66kV Lightning impulse ......................................................................... kV 325 c) 33kV Lightning impulse ......................................................................... kV 170 d) 22kV Lightning impulse ......................................................................... kV 125 e) 20kV Lightning impulse ........................................................................ kV 125 f) 11kV Lightning impulse ........................................................................ kV 75 g) 6.6kV Lightning impulse ........................................................................ kV 60 Sound power levels: a) Transformer only (ONAN) ..................................................................... dBA b) Transformer plus coolers (forced cooling) ............................................ dBA VOLTAGE CONTROL 23 Method of variation of voltage ratio On-Load 24 Category of voltage variation VFVV / CFVV 25 Total range of variation of voltage ratio (expressed as a percentage of HV and LV constant): a) Plus............................................................................................................ % b) Minus ........................................................................................................ % 26 Size of step .................................................................................................... % 27 Whether tap-change control by direct wire or selective system is required at remote control point ......................................................................................... 28 Automatic voltage control: a) Whether required .......................................................................................... b) Whether group parallel control is required ................................................... 29 Space available for voltage compounding current transformer in LV switchgear: a) inside diameter ........................................................................................ mm b) outside diameter ..................................................................................... mm Page 14 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Description UK Power Networks Requirements c) Axial length including clamps ................................................................... mm 30 Voltage ratio of voltage compounding VT ...................................................... V 31 Current ratio of voltage compounding CT ...................................................... A 32 Whether load shedding control by direct wire or selective system is required from a remote control point .............................................................................. 33 Number of marshalling kiosk compartments .................................................... 34 Marshalling kiosk switched socket outlets: a) No. required .............................................................................................. b) Type .......................................................................................................... c) 35 Voltage .................................................................................................... V Marshalling kiosk telephone jacks: a) Whether required ........................................................................................ b) Type ............................................................................................................. TERMINATIONS 36 Whether delta connected tertiary winding is to be brought out to separate terminations for external loading ...................................................................... 37 Terminals: a) Bushing insulators or separable cable connectors (SCC) for live terminals: i) HV windings ........................................................................................... ii) LV windings ............................................................................................ Bushing iii) Delta connected tertiary windings ......................................................... SCC iv) Auxiliary transformer ............................................................................. Not Applicable b) Bushing insulators or separable cable connectors (SCC) for neutral terminals: i) SCC HV ........................................................................................................... ii) LV............................................................................................................ Bushing SCC Page 15 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Description 38 Separable cable connector (SCC) details: a) UK Power Networks Requirements HV line termination: Not Applicable i) Open or enclosed ................................................................................ ii) Number of SCC bushings per phase .................................................... iii) Number of cable cores per SCC bushing ............................................. iv) Type of cable ....................................................................................... v) Cross sectional area of conductor ...........................................mm vi) Direction of cable entry ....................................................................... vii) CENELEC type interface for SCC .......................................................... b) LV line termination: c) i) Open or enclosed ................................................................................ ii) Number of SCC bushings per phase .................................................... iii) Number of cable cores per SCC bushing ............................................. iv) Type of cable ....................................................................................... v) Cross sectional area of conductor ...........................................mm vi) Direction of cable entry ....................................................................... vii) CENELEC type interface for SCC .......................................................... Cu XLPE Tertiary line termination: i) Open or enclosed ................................................................................ ii) Number of SCC bushings per phase .................................................... iii) Number of cable cores per SCC bushing ............................................. iv) Type of cable ....................................................................................... v) Cross sectional area of conductor ...........................................mm vi) Direction of cable entry ....................................................................... vii) CENELEC type interface for SCC .......................................................... Not Applicable d) Auxiliary transformer line termination: i) Open or enclosed ................................................................................ ii) Number of SCC bushings per phase .................................................... iii) Number of cable cores per SCC bushing ............................................. iv) Type of cable ....................................................................................... v) Cross sectional area of conductor ...........................................mm vi) Direction of cable entry ....................................................................... vii) CENELEC type interface for SCC .......................................................... Page 16 of 56 Cu XLPE Not Applicable THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Description e) f) UK Power Networks Requirements HV neutral termination: i) Open or enclosed ................................................................................ ii) Number of SCC bushings per phase .................................................... iii) Number of cores per SCC bushing ....................................................... iv) Type of cable ....................................................................................... v) Cross sectional area of conductor .......................................... mm vi) Direction of cable entry ....................................................................... vii) CENELEC type interface for SCC .......................................................... LV neutral termination: i) Open or enclosed ................................................................................ ii) Number of SCC bushings per phase .................................................... iii) Number of cable cores per SCC bushing ............................................. iv) Type of cable ....................................................................................... v) Cross sectional area of conductor .......................................... mm vi) Direction of cable entry ....................................................................... vii) CENELEC type interface for SCC viii) Number of neutral bushings................................................................ 39 Whether CT accommodation is required on bushing insulators rated at 132 kV and below: a) HV .................................................................................................................. b) LV ................................................................................................................... Whether neutral current transformers are to be provided: 40 a) HV .................................................................................................................. b) LV ................................................................................................................... 41 Whether interposing CTs are required for main protection COOLING 42 Cooling designation 43 Arrangement of coolers: a) Tank attached .......................................................................................... b) Separate free-standing ............................................................................ Page 17 of 56 Cu XLPE THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Description 44 Number and rating of coolers per transformer: a) UK Power Networks Requirements Number and rating .................................................................................. b) Oil/air coolers .......................................................................................... c) Oil/water coolers ..................................................................................... 45 The maximum allowable winding hot spot temperature ............................... 46 The maximum top oil temperature rise at any tapping position and supplying rated power at rated secondary voltage ........................................................ 47 Whether valves for oil filtering require flexible hose adapters ...................... 48 Size of flexible hose adapter ........................................................................ mm 50 OIL PRESERVATION 49 Oil preservation system: a) Conservator fitted with refrigeration type breather ........................ No b) Conservator fitted with moisture absorbing medium type breather (* Delete as appropriate) ............................................................... Regenerative / Traditional* c) Conservator fitted with diaphragm .................................................. 50 d) Conservator fitted with bag or bladder ............................................ Yes UK Power Networks preference for refrigeration type breather: NA a) Manufacturer .................................................................................... b) Model ................................................................................................ c) Type ................................................................................................... 51 On line moisture management system: a) Whether required ............................................................................. Yes b) Manufacturer .................................................................................... Bowden or Omnia c) Model ................................................................................................ RT9 d) Type ................................................................................................... GENERAL 52 Losses: a) The maximum permitted no-load loss of each main transformer on the principal tap .......................................................................... kW b) The maximum permitted load loss of each main transformer at a reference temperature of 75C over a variation of tapping ranges. Average of loss at tap 1, 7, 13, 19.. ............................................. kW 53 Winding temperature indicators: a) Total number required ...................................................................... b) Location ............................................................................................. Page 18 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Description i) UK Power Networks Requirements HV windings ................................................................................ ii) LV winding .................................................................................. c) Type: i) Mercury tilt-switch ..................................................................... ii) Micro-switch ............................................................................... iii) Electronic .................................................................................... d) If electronic type, preferred: i) Manufacturer ............................................................................. ii) Type ............................................................................................ iii) Model ......................................................................................... e) Settings: i) Coolers switch-on ................................................................... C ii) Coolers switch-off ................................................................... C iii) Winding temperature alarm ................................................... C 90 iv) Winding temperature trip ...................................................... C 130 54 Size of direct wire electrical winding temperature indicator Na 55 Whether anti-vibration pads are required .............................................. Yes 56 Whether a noise enclosure is required from the outset ......................... 57 Number of copies of Operating and Maintenance Instructions required ................................................................................................................. 58 Whether core and frame earth connections are to be brought out to bushings ................................................................................................... 59 Whether provision is to be made for fitting a dissolved gas-in-oil monitor .................................................................................................... 60 Whether a dissolved-gas-in-oil monitor is required from the outset ..... 61 UK Power Networks preference for dissolved-gas-in-oil monitor: 62 3 hard copy 1 electronic copy Yes a) Manufacturer .................................................................................... GE b) Type ................................................................................................... Hydran c) Model ................................................................................................ M2 Whether multipair cables for SCADA are to ENATS 09-06 or DEF 61-12 Part 5 standards....................................................................................... Page 19 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE D, PART II (i) (Continued) Mounted in 132kV or turrets 63 (Refer to Item 20 for system fault levels for which the CT shall be compatible) a) Purpose................................................................................................ b) Quantity............................................................................................... c) Rated primary/secondary current .................................................... A d) Minimum knee-point voltage (Vk) ................................................... V e) Maximum secondary winding resistance ......................................... f) Maximum secondary excitation current at Vk/2 .............................. A g) Rated output .................................................................................. VA h) Rated accuracy class/accuracy limit factor ......................................... i) Continuous Thermal Rating current @ 40°C ....................................... j) Type k) Turns ratio ........................................................................................... a) Purpose................................................................................................ b) Quantity............................................................................................... c) Rated primary/secondary current .................................................... A d) Minimum knee-point voltage (Vk) ................................................... V e) Maximum secondary winding resistance ......................................... f) Maximum secondary excitation current at Vk/2 .............................. A g) Rated output .................................................................................. VA h) Rated accuracy class/accuracy limit factor ......................................... i) Continuous Thermal Rating current @ 40°C ....................................... j) Type k) Turns ratio ........................................................................................... a) Purpose................................................................................................ b) Quantity............................................................................................... c) Rated primary/secondary current .................................................... A d) Minimum knee-point voltage (Vk) ................................................... V e) Maximum secondary winding resistance ......................................... Page 20 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE HV LINE CURRENT TRANSFORMER CHARACTERISTICS Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : f) Maximum secondary excitation current at Vk/2 .............................. A h) Rated accuracy class/accuracy limit factor ......................................... i) Continuous Thermal Rating current @ 40°C ....................................... j) Type k) Turns ratio ........................................................................................... HV NEUTRAL CURRENT TRANSFORMER CHARACTERISTICS 64 (Refer to Item 20 for system fault levels for which the CT shall be compatible) a) Purpose................................................................................................ b) Quantity............................................................................................... c) Rated primary/secondary current .................................................... A d) Minimum knee-point voltage (Vk) ................................................... V e) Maximum secondary winding resistance ......................................... f) Maximum secondary excitation current at Vk/2 .............................. A g) Rated output .................................................................................. VA h) Rated accuracy class/accuracy limit factor ......................................... i) Continuous Thermal Rating current @ 40°C ....................................... j) Type k) Turns ratio ........................................................................................... HV LINE CURRENT TRANSFORMER CHARACTERISTICS Mounted in 66kV or turret 65 (Refer to Item 20 for system fault levels for which the CT shall be compatible) a) Purpose................................................................................................ b) Quantity............................................................................................... c) Rated primary/secondary current .................................................... A d) Minimum knee-point voltage (Vk) ................................................... V e) Maximum secondary winding resistance ......................................... f) Maximum secondary excitation current at Vk/2 .............................. A g) Rated output .................................................................................. VA h) Rated accuracy class/accuracy limit factor ......................................... i) Continuous Thermal Rating current @ 40°C ....................................... j) Type k) Turns ratio ........................................................................................... HV NEUTRAL CURRENT TRANSFORMER CHARACTERISTICS Page 21 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE g) Rated output .................................................................................. VA Grid Transformer Schedules Substation:…………………… 66 Document Number: EDS 04-8000A Version : 2.0 Design doc No : (Refer to item 20 for system fault levels for which the CT shall be compatible) b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio ...................................................................................................... LV LINE CURRENT TRANSFORMER CHARACTERISTICS - Mounted in 33kV or turret 67 (Refer to Item 20 for system fault levels for which the CT shall be compatible) a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio ...................................................................................................... a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio ...................................................................................................... a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... Page 22 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE a) Purpose ........................................................................................................... Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : c) Rated primary/secondary current ............................................................... A e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio ...................................................................................................... a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio LV NEUTRAL CURRENT TRANSFORMER CHARACTERISTICS Page 23 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE d) Minimum knee-point voltage (Vk) .............................................................. V Grid Transformer Schedules Substation:…………………… 68 Document Number: EDS 04-8000A Version : 2.0 Design doc No : (Refer to Item 20 for system fault levels for which the CT shall be compatible) b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio ...................................................................................................... LV LINE CURRENT TRANSFORMER CHARACTERISTICS - Mounted in 11kV or turret 69 (Refer to Item 20 for system fault levels for which the CT shall be compatible) a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio ...................................................................................................... a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio ...................................................................................................... Page 24 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE a) Purpose ........................................................................................................... Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : a) Purpose ........................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio ...................................................................................................... a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A g) Rated output.............................................................................................. VA h) Rated accuracy class/accuracy limit factor .................................................... i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio LV NEUTRAL CURRENT TRANSFORMER CHARACTERISTICS 70 (Refer to Item 20 for system fault levels for which the CT shall be compatible) a) Purpose ........................................................................................................... b) Quantity.......................................................................................................... c) Rated primary/secondary current ............................................................... A d) Minimum knee-point voltage (Vk) .............................................................. V e) Maximum secondary winding resistance .................................................... f) Maximum secondary excitation current at Vk/2 ......................................... A Page 25 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE b) Quantity.......................................................................................................... Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : g) Rated output.............................................................................................. VA i) Continuous Thermal Rating current @ 40°C .................................................. j) Type k) Turns ratio ...................................................................................................... Page 26 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE h) Rated accuracy class/accuracy limit factor .................................................... Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE D (Continued) Item Description UK Power Networks Requirements RATING 1 Auxiliary or Earthing/Auxiliary transformer 1a Rated Continuous output (ONAN) ............................................ kVA 2 Rated voltage ratio .................................................................... kV 3 Winding connections: a) HV windings ............................................................................ b) LV windings ............................................................................. c) BS Vector group symbols ........................................................ PERFORMANCE CHARACTERISTICS 4 Impedance voltage at 75°C on principal tap ...........................................% 5 Short circuit capability: a) Max available at HV terminals (3 phase) ........................................... kA b) Max available at LV terminals (3-phase) ........................................... kA VOLTAGE CONTROL 6 Method of variation of voltage control 7 Total range of variation of voltage ratio (expressed as a percentage of HV with LV constant): a) Plus .................................................................................................. % b) Minus .............................................................................................. % 8 Size of step ........................................................................................... % TERMINATIONS 9 Terminals: a) Bushing insulators, cable boxes or separable cable connectors (SCC) for live terminals: i) HV ......................................................................................................... ii) LV ......................................................................................................... b) Bushing insulators, cable boxes or separable cable connectors (SCC) for neutral terminals i) HV ......................................................................................................... ii) LV ......................................................................................................... Page 27 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE PART II (ii) GENERAL PARTICULARS OF AUXILIARY TRANSFORMERS Grid Transformer Schedules Substation:…………………… Description 10 Cable box or separable cable connector details: a) UK Power Networks Requirements Higher voltage .................................................................................. b) Lower voltage ................................................................................... i) Number of switchfuses ........................................................................ ii) Number of poles per box / SCCs per pole ........................................... iii) Number of cores per pole / SCC ......................................................... iv) Type of cable ...................................................................................... v) Cross sectional area of conductor ............................................... mm2 vi) Direction of cable entry ...................................................................... vii) Type of gland ..................................................................................... viii) Filling medium for cable box ............................................................ COOLING 11 Cooling designation 12 Arrangement of coolers: a) Tank attached................................................................................... b) Separate free-standing..................................................................... 13 Whether valves for oil filtering require flexible hose adapters 14 Size of flexible hose adapter ............................................................... mm Page 28 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE D (Continued) Item Description UK Power Networks Requirements GENERAL 1 Whether resistor of reactor is required* .................................................. 2 Whether mounted on transformer tank or separate ................................ RATING 3 Rated Continuous current (AN) ............................................................... A 4 Rated Impedance .............................................................................. ohms 5 Rated Loaded Time ...................................................................................s 6 Line voltage of system to which resistance will be connected ............. kV 7 Design voltage of external and internal high voltage bushings ............ kV 8 Voltage that can be withstood for one minute dry by external and internal high voltage bushings ............................................................... kV 9 Minimum wet flashover voltage for external high voltage bushing ...... kV 10 Minimum wet flashover voltage for internal high voltage support bushings ................................................................................................. kV 11 Routine Test Voltage – 1 minute dry ..................................................... kV 12 Continous current rating * If resistor is required then complete Schedule D Part II (iv) Page 29 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE PART II (iii) GENERAL PARTICULARS OF NEUTRAL EARTHING RESISTORS Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE D (Continued) Item Description UK Power Networks Requirements PERFORMANCE CHARACTERISTICS 1 Rated Insulation Level (separate source withstand voltage): a. Rated Lightning Impulse withstand voltage (peak) to earth ............. kV b. Rated one minute power frequency withstand voltage (rms) to earth kV 2 Rated continuous current ........................................................................... A 3 Rated impedance ....................................................................................... 4 Rated circuit capability: a) Rated short time current ...................................................................... A b) Rated duration of short time current....................................................s TERMINATIONS 5 Terminals: Bushing insulator, cable boxes or separable cable connectors (SCC) for transformer side terminals: a) Transformer side ................................................................................... b) Earthed side .......................................................................................... 6 Whether current transformers are to be provided in reactor: a) Transformer side ................................................................................. b) Earthed side ....................................................................................... c) Arrangement of current transformers ............................................... COOLING 7 Cooling designation 8 Arrangement of coolers: a) Tank attached..................................................................................... b) Separate free-standing.......................................................................... 9 Whether valves for oil filtering require flexible hose adapters 10 Size of flexible hose adapter ................................................................ mm Page 30 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE PART II (iv) GENERAL PARTICULARS OF NEUTRAL EARTHING REACTORS Grid Transformer Schedules Substation:…………………… Description UK Power Networks Requirements REACTOR/RESISTOR MOUNTED CURRENT TRANSFORMERS 11. a) Purpose ...................................................................................................... b) Quantity..................................................................................................... c) Rated primary/secondary current .......................................................... A d) Minimum knee-point voltage (Vk) ......................................................... V e) Maximum secondary winding resistance ............................................... f) Maximum secondary excitation current at Vk/2 .................................... A g) Rated output......................................................................................... VA h) Rated accuracy class/accuracy limit factor ............................................... i) Continuous Thermal Rating current @ 40°C ............................................. j) Type a) 12 k) Turns ratio .....................................................................................A a) Purpose ...................................................................................................... b) Quantity..................................................................................................... c) Rated primary/secondary current .......................................................... A d) Minimum knee-point voltage (Vk) ......................................................... V e) Maximum secondary winding resistance ............................................... f) Maximum secondary excitation current at Vk/2 .................................... A g) Rated output......................................................................................... VA h) Rated accuracy class/accuracy limit factor ............................................... i) Continuous Thermal Rating current @ 40°C ............................................. j) Type a) 13 k) Turns ratio .....................................................................................A a) Purpose ...................................................................................................... b) Quantity..................................................................................................... c) Rated primary/secondary current .......................................................... A d) Minimum knee-point voltage (Vk) ......................................................... V e) Maximum secondary winding resistance ............................................... f) Maximum secondary excitation current at Vk/2 .................................... A g) Rated output......................................................................................... VA h) Rated accuracy class/accuracy limit factor ............................................... i) Continuous Thermal Rating current @ 40°C ............................................. j) Type a) k) Turns ratio .....................................................................................A Page 31 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Document Number: EDS 04-8000A Version : 2.0 Design doc No : Substation:…………………… SCHEDULE D (Continued) Item Descriptions UK Power Networks Requirements PARTICULARS OF ACCESS AND INSTALLATION 1 Designated location ........................................................... 2 Clear opening of plant hatch ....................................... mm 3 Minimum headroom ..................................................mm 4 Maximum permissible mass of heaviest transport unit kg 5 Whether cubicles are to be arranged for top or bottom cable entry ........................................................................ 6 Whether cubicles are to be installed on a solid floor or on a computer floor with removable floor panels ............ 7 Whether cubicle heating is required ................................. 8 Whether separate analogue voltmeter and tap position indicator is required .......................................................... 9 AVC relay: a) Number required ...................................................... b) Manufacturer ........................................................... VA Tech c) Type .......................................................................... Super Tapp d) Model ....................................................................... Version 5 Note : Minimum headroom below lifting hook, or in access route to final position, whichever is the lesser. Note : A hoist suitable for the heaviest item of auxiliary plant will be supplied and installed by the Purchaser Page 32 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE PART II (v) GENERAL PARTICULARS OF REMOTE VOLTAGE CONTROL CUBICLES Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE D (Continued) (To be completed by the Tenderer) Item Description Value Unit PERFORMANCE CHARACTERISTICS 1.0 Guaranteed rated continuous output power (ONAN) MVA 2.0 Guaranteed rated continuous output power (Forced cooling) MVA 3.0 No-load Loss (excl. cooling plant loss) a. On principal tap kW b. At max excitation (1.9 Tesla) kW 4.0 Cooling Plant Loss kW 5.0 Load Losses at rated continuous output power (forced cooling) at a reference temperature of 75°C: a. On tapping positions: 5.1 (i) HV/LV loss on minimum tapping position kW 5.2 (ii) HV/LV loss on Tap number 7 kW 5.3 (iii) HV/LV loss on Tap number 13 kW 5.4 (iv) HV/LV loss on maximum tapping position kW b. On tapping positions for maximum load loss: 5.5 (i)Tap number Tap No. 5.6 (ii) HV/LV loss kW 6.0 Impedance at Forced cooling rated continuous output at 75°C: a. Impedance on principal tap: Tap No. (i) HV/LV % b. Minimum impedance on minimum tap: Tap No. (i) HV/LV % c. Maximum impedance on minimum tap: Tap No. (i) HV/LV % d. Minimum impedance on maximum tap: Tap No. (i) HV % e. Maximum impedance on maximum tap: Tap No. 6.5 (i) HV/LV % 6.6 Zero Sequence impedance 6.1 6.2 6.3 6.4 6.7 % rd Maximum 3 harmonic component of phase voltage Page 33 of 56 % THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE PART III (i) GUARANTEES FOR MAIN TRANSFORMER Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE D, Part III (i) GUARANTEES FOR MAIN TRANSFORMER (Continued) Description Value Unit 7.0 Maximum volts per step as seen by on-load tap changer at system highest volts: 7.1 a. At maximum rating end of range kV 7.2 b. At minimum rating end of range kV 8.0 Hottest spot winding temperature on most onerous tap position (See Schedule D part II (i) for average ambient air temperature) 8.1 a. Tap Number Tap No. 8.2 b. HV at Forced cooling rated continuous output °C 8.3 c. LV at Forced cooling rated continuous output °C 9.0 Oil and Winding temperature rises on most onerous tap position (See Schedule D part II (i) for average ambient air temperature) a. At ONAN rated continuous output (Item 1) Tap No. 9.1 (i) Top Oil rise °C 9.2 (ii) Mean Oil rise °C 9.3 (iii) Average winding rise °C b. During Cyclic loading 9.4 (i) Top Oil rise °C 9.5 (ii) Mean Oil rise °C 9.6 (iii) Average winding rise °C Item 10.0 Description Value Unit Maximum observable oil temperature (See Schedule D part II (i) for average ambient air temperature) a. At ONAN rated continuous output 10.1 (i) Top Oil °C 10.2 (ii) At inlet to cooler °C 10.3 (iii) At outlet to cooler °C b. During normal cyclic loading 10.4 (i) Top Oil °C 10.5 (ii) At inlet to cooler °C 10.6 (iii) At outlet to cooler °C Page 34 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Substation:…………………… Item Description 11.0 Proportion of sum of iron and copper losses at forced cooling rated output which will be supplied during temperature rise test 12.0 Calculated winding capacitance Document Number: EDS 04-8000A Version : 2.0 Design doc No : Value Unit % a. Approximate series capacitance of each phase winding 12.1 i) HV pF 12.2 ii) LV pF b. Approximate shunt capacitance to earth of each phase winding with core and tank earthed 12.3 i) HV to earth with LV winding earthed pF 12.4 ii) LV to earth with HV winding earthed pF 12.5 c. Approximate capacitance HV to LV winding earthed pF Item Description 13.0 Guaranteed sound power level ('A' weighting): 13.1 a. Transformer tank dB 13.2 b. Cooler dB 13.3 c. Method of noise reduction Value Unit MAGNETIC CIRCUIT 14.0 Core Construction: 14.1 a. Taped/banded/bolted limbs 14.2 b. Taped/banded/bolted yokes 14.3 c. Taping/banding material 14.4 d. Number of limbs 14.5 e. Number of limbs wound 15.0 Insulation of: 15.1 a. Core bolts 15.2 b. Core bolt washers 15.3 c. Side plates 15.4 d. Core Laminations 16.0 Flux density in iron (Nominal value at normal voltage and frequency on principal tap): 16.1 a. Wound limbs Tesla 16.2 b. Yokes Telsa 16.3 c. Unwound limbs Telsa 16.4 d. Shields Telsa 17.0 Whether tank or other flux shields are incorporated Page 35 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Grid Transformer Schedules Substation:…………………… Item Description Document Number: EDS 04-8000A Version : 2.0 Design doc No : Value Unit 18.0 Type and arrangement: 18.1 a. HV Windings 18.2 b. LV windings 18.3 c. Tapping windings 18.4 d. Tertiary windings 18.5 e. Winding arrangements (i.e.. Core/…./…./…./….) 19.0 Arrangement of tapping (e.g. linear, coarse/fine, reversing): 20.0 Conductor material for: 20.1 a. HV windings 20.2 b. LV windings 20.3 c. Tapping windings 20.4 d. Tertiary windings 21.0 Conductor insulation for: 21.1 a. HV windings 21.2 b. LV windings 21.3 c. Tapping windings 21.4 d. Tertiary windings 22.0 Oil circulation (e.g. natural, partially directed, directed) THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE WINDINGS a. To windings: 22.1 i) HV windings 22.2 ii) LV windings 22.3 iii) Tapping windings 22.4 iv) Tertiary windings b. Through windings 22.5 i) HV windings 22.6 ii) LV windings 22.7 iii) Tapping windings 22.8 iv) Tertiary windings 23.0 Short circuit capability: a. Potential axial thrust for worst fault condition of each winding: 23.1 i) HV windings t 23.2 ii) LV windings t 23.3 iii) Tapping windings t Page 36 of 56 Substation:…………………… Item Description 23.4 iv) Tertiary windings Document Number: EDS 04-8000A Version : 2.0 Design doc No : Value Unit t b. Coil clamping short circuit withstand capacity: 23.5 i) HV windings t 23.6 ii) LV windings t 23.7 iii) Tapping windings t 23.8 iv) Tertiary windings t 23.9 c. Most onerous earth fault condition, HV or LV, for transformers with delta connected tertiary 24.0 Current density in windings at normal tap: 24.1 a. HV windings at forced cooling rated cont. output A/mm2 24.2 b. LV. windings at forced cooling rated cont. output A/mm2 24.3 c. Tapping windings at forced cooling rated cont. output A/mm2 24.4 d. Tertiary windings at forced cooling rated cont. output A/mm2 24.5 e. In HV or LV windings detailed in Item 23.9 above most onerous earth fault condition A/mm2 24.6 f. Tertiary windings for condition as (e) above A/mm2 25.0 Weight of components: 25.1 Weight of copper t 25.2 Weight of core t NA t TANK AND COOLER 26.0 Tank material 27.0 Tank thickness 27.1 a. Sides mm 27.2 b. Base mm 27.3 c. Cover mm 28.0 Thickness of radiator plates and/or cooling tubes mm 29.0 Total volume of oil required (including cooling system) litres 30.0 Volume of oil to be removed (if applicable) 30.1 a. To effect in situ change of HV bushing litres 30.2 b To effect in situ change of LV bushing litres 31.0 Total volume of oil in conservator(s) litres Page 37 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : Item Description Value Unit 32.0 Volume of oil in (each) conservator between highest and lowest visible levels litres 33.0 Height of oil at maximum level in the conservator (s) above pad level m 34.0 Total number of cooler oil pumps under service conditions 35.0 Output of each cooler oil pump under service conditions: 35.1 a. Volume of oil litres/s 35.2 b. Approximate head of oil m 36.0 Continuous rating of each cooler oil pump motor shaft kW 37.0 Starting current of each cooler pump motor A 38.0 Total number of cooler fans 39.0 Rated normal output of each cooler fan: 39.1 a. Volume of air m3/s 39.2 b. Approximate head of air mm water gauge 40.0 Nominal diameter of cooler fans mm 41.0 Speed of cooler fans rpm 42.0 Continuous rating of each cooler fan motor shaft kW 43.0 Starting current of each cooler fan motor A GENERAL 44.0 Filling medium for transport 45.0 Total weight as installed in service, including cooling plant, all fittings and oil: 45.1 a. Quotation estimate t 45.2 b. Final design calculation t 46.0 Weight arranged for transport, excluding vehicle t 47.0 Weight of each bushing insulator (if applicable): 47.1 a. HV kg 47.2 b. HV neutral kg 47.3 c. LV kg 47.4 d. LV neutral kg 48.0 Overall Dimensions of main transformer: 48.1 a. Length mm 48.2 b. Width mm 48.3 c. Height mm Page 38 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : Item Description Value Unit 49.0 Overall Dimensions of cooler: 49.1 a. Length mm 49.2 b. Width mm 49.3 c. Height mm 50.0 Transport Dimensions: 50.1 a. Length mm 50.2 b. Width mm 50.3 c. Height mm 51.0 Type of safety device to restrict falling 52.0 Manufacturer 53.0 Type Designation 54.0 Ratings: 54.1 a. Rated through current A 54.2 b. Maximum rated through current A 54.3 c. Rated step capacity kVA 54.4 d. Rated step voltage V 54.5 e. Maximum rated step voltage V 54.6 f. Short circuit current (for 3 second duration) rms kA 54.7 g. Rated frequency Hz h. Rated insulation level 54.8 (i) Power frequency withstand voltage (1 min) V 54.9 (ii) Phase to phase V 54.10 (iii) Phase to earth V 54.11 (iv) Busbar adjacent terminals V 54.12 (v) Across switch V i. Impulse withstand voltage (1.2/50 microsecond) 54.13 (i) Phase to earth V 54.14 (ii) Phase to phase V 54.15 (iii) Between adjacent terminals V 54.16 (iv) Across switch V 55.0 Maximum number of tapping positions 56.0 Tested no load mechanical endurance (No of operations) Page 39 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Substation:…………………… Item Description 57.0 Number of on-load tap change operations before: Document Number: EDS 04-8000A Version : 2.0 Design doc No : Value Unit a. arcing contact 57.1 (i) maintenance 57.2 (ii) replacement 57.3 b. oil inspection 58.0 Design 58.1 a. Type of operation 58.2 b. Regulation 59.0 Oil: 59.1 a. Quantity of oil 59.2 b. Mechanical withstand of barrier board 59.3 c. Maximum working pressure when oil filled 59.4 d. Material of contacts 59.5 e. Drive Motor 59.6 f. No of phases 59.7 (I) rated voltage V 59.8 (ii) rated frequency Hz 59.9 (iii) starting current A 59.10 (iv) running current A 59.11 (v) type 60.0 Design of protection of enclosures IP 132kV LINE CURRENT TRANSFORMERS 61.0 Purpose: 61.1 a. Rated primary/secondary current A 61.2 b. Rated frequency Hz 61.3 c. Rated output VA 61.4 d. Rated knee point voltage (Vk) VA 61.5 e. Maximum secondary resistance ohms 61.6 f. Maximum secondary excitation current at Vk/2 A 61.7 g. Rated accuracy class/accuracy limit factor 61.8 h. Highest equipment voltage kV 61.9 i. Rated insulation level kV 61.10 j. Rated short time thermal current/duration kA/s Page 40 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Grid Transformer Schedules Substation:…………………… Item Description 61.11 k. Rated dynamic current 61.12 l. Class of insulation 61.13 m. Rated continuous current at 40oC air ambient Document Number: EDS 04-8000A Version : 2.0 Design doc No : Value Unit A 132kV LINE CURRENT TRANSFORMERS 62.0 Purpose 62.1 a. Rated primary/secondary current A 62.2 b. Rated frequency Hz 62.3 c. Rated output VA 62.4 d. Rated knee point voltage (Vk) VA 62.5 e. Maximum secondary resistance ohms 62.6 f. Maximum secondary excitation current at Vk/2 A 62.7 g. Rated accuracy class/accuracy limit factor 62.8 h. Highest equipment voltage kV 62.9 i. Rated insulation level kV 62.10 j. Rated short time thermal current/duration kA/s 62.11 k. Rated dynamic current kA 62.12 l. Class of insulation 62.13 m. Rated continuous current at 40oC air ambient A 132kV LINE CURRENT TRANSFORMERS 63.0 Purpose 63.1 a. Rated primary/secondary current A 63.2 b. Rated frequency Hz 63.3 c. Rated output VA 63.4 d. Rated knee point voltage (Vk) VA 63.5 e. Maximum secondary resistance ohms 63.6 f. Maximum secondary excitation current at Vk/2 A 63.7 g. Rated accuracy class/accuracy limit factor 63.8 h. Highest equipment voltage kV 63.9 i. Rated insulation level kV 63.10 j. Rated short time thermal current/duration kA/s 63.11 k. Rated dynamic current kA 63.12 l. Class of insulation 63.13 m. Rated continuous current at 40oC air ambient Page 41 of 56 A THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE kA Substation:…………………… Item Description Document Number: EDS 04-8000A Version : 2.0 Design doc No : Value Unit 132kV NEUTRAL CURRENT TRANSFORMERS 64.0 Purpose 64.1 a. Rated primary/secondary current A 64.2 b. Rated frequency Hz 64.3 c. Rated output VA 64.4 d. Rated knee point voltage (Vk) VA 64.5 e. Maximum secondary resistance ohms 64.6 f. Maximum secondary excitation current at Vk/2 A 64.7 g. Rated accuracy class/accuracy limit factor 64.8 h. Highest equipment voltage kV 64.9 i. Rated insulation level kV 64.10 j. Rated short time thermal current/duration kA/s 64.11 k. Rated dynamic current kA 64.12 l. Class of insulation 64.13 m. Rated continuous current at 40oC air ambient A SECONDARY WINDING LINE CURRENT TRANSFORMERS 65.0 Purpose 65.1 a. Rated primary/secondary current A 65.2 b. Rated frequency Hz 65.3 c. Rated output VA 65.4 d. Rated knee point voltage (Vk) VA 65.5 e. Maximum secondary resistance ohms 65.6 f. Maximum secondary excitation current at Vk/2 A 65.7 g. Rated accuracy class/accuracy limit factor 65.8 h. Highest equipment voltage kV 65.9 i. Rated insulation level kV 65.10 j. Rated short time thermal current/duration kA/s 65.11 k. Rated dynamic current kA 65.12 l. Class of insulation 65.13 m. Rated continuous current at 40oC air ambient Page 42 of 56 A THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Substation:…………………… Item Description Document Number: EDS 04-8000A Version : 2.0 Design doc No : Value Unit SECONDARY WINDING LINE CURRENT TRANSFORMERS 66.0 Purpose 66.1 a. Rated primary/secondary current A 66.2 b. Rated frequency Hz 66.3 c. Rated output VA 66.4 d. Rated knee point voltage (Vk) VA 66.5 e. Maximum secondary resistance ohms 66.6 f. Maximum secondary excitation current at Vk/2 A 66.7 g. Rated accuracy class/accuracy limit factor 66.8 h. Highest equipment voltage kV 66.9 i. Rated insulation level kV 66.10 j. Rated short time thermal current/duration kA/s 66.11 k. Rated dynamic current kA 66.12 l. Class of insulation 66.13 m. Rated continuous current at 40oC air ambient A SECONDARY WINDING LINE CURRENT TRANSFORMERS 67.0 Purpose 67.1 a. Rated primary/secondary current A 67.2 b. Rated frequency Hz 67.3 c. Rated output VA 67.4 d. Rated knee point voltage (Vk) VA 67.5 e. Maximum secondary resistance ohms 67.6 f. Maximum secondary excitation current at Vk/2 A 67.7 g. Rated accuracy class/accuracy limit factor 67.8 h. Highest equipment voltage kV 67.9 i. Rated insulation level kV 67.10 j. Rated short time thermal current/duration kA/s 67.11 k. Rated dynamic current kA 67.12 l. Class of insulation 67.13 m. Rated continuous current at 40oC air ambient Page 43 of 56 A THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Substation:…………………… Item Description Document Number: EDS 04-8000A Version : 2.0 Design doc No : Value Unit SECONDARY WINDING NEUTRAL CURRENT TRANSFORMERS 68.0 Purpose 68.1 a. Rated primary/secondary current A 68.2 b. Rated frequency Hz 68.3 c. Rated output VA 68.4 d. Rated knee point voltage (Vk) VA 68.5 e. Maximum secondary resistance ohms 68.6 f. Maximum secondary excitation current at Vk/2 A 68.7 g. Rated accuracy class/accuracy limit factor 68.8 h. Highest equipment voltage kV 68.9 i. Rated insulation level kV 68.10 j. Rated short time thermal current/duration kA/s 68.11 k. Rated dynamic current kA 68.12 l. Class of insulation 68.13 m. Rated continuous current at 40oC air ambient 69.0 MATERIAL: 70.0 (i) Castings for current carrying parts 71.0 (ii) Other purposes 72.0 Gaskets for oil-tight joints 73.0 Tubes for water cooled oil coolers 74.0 Tube plates for water cooled oil coolers Page 44 of 56 A THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Grid Transformer Schedules Substation:…………………… SCHEDULE E - Drawings, Data, Assembly, Operating and Maintenance Instructions, Models and Samples Drawings Scale Drawings shall be to scale and fully detailed with dimensions in metric units. General arrangement drawings shall be to a scale not less than 1:50 Detail drawings not less than 1:20 In exceptional circumstances, where the use of a scale of 1:20 is not practicable, a scale of 1:33 may be adopted Drawing size A0 or A1 size Some small detail drawings may be A4 Shall not exceed 1188 x 841mm (A0) Type of drawing to be supplied for comment The Contractor shall submit any drawing, in hard copy, in triplicate, for comment at all stages of revision, until the Contractor and the Purchaser agree that the drawing is in its final form. Drawings, other than those requiring comment, agreed between the Contractor and the Purchaser as being appropriate to the Contract, shall also be supplied in hard copy, in triplicate. The Tenderer/Contractor may, by agreement with the purchaser, provide preliminary and/or interim drawings on disk, in one of the formats specified below, in place of paper prints. Size of drawing All drawings shall be supplied in the format described above for pre-commissioning testing. Final drawings shall also be supplied as A0 or A1 size. Any other drawing size proposed shall be agreed at the tender stage Identification of drawings The Contractor shall provide on each drawing a box inscribed ‘UK Power Networks No.’ into which shall be entered an eight digit reference number which will be allocated by the Purchaser when final agreement is reached upon the drawing content. Page 45 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE 5 Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : When applying for design type agreement, the Contractor or sub-Contractor shall submit for comment. Drawings shall show clearly in full detail the equipment for which agreement is sought. Any change made following agreement may invalidate the agreement previously given. For final records the Contractor shall supply: Contract Drawing list with the number, title and revision of each drawing CD-ROM(s) containing each drawing as a file suitable for use with Bentley Microstation Version 8 CAD software. Preferably in Microstation drawing file (.dgn) OR Alternatively in drawing interchange file (.dxf) OR AutoCAD (.dwg) format. The Contract Drawing list shall be submitted by the Contractor for approval by the Purchaser, who will indicate thereon the Company’s requirements for final records, one month before the commencement of the maintenance period, or such earlier date as may be required by the Purchaser. Cable identification 1 Identification of cables cables and wires shall be identified at both ends with a clear identification system. 2 Numbering system shall be that shown on the UK Power Networks drawings. a) The UK Power Networks numbering system shall be used throughout, unless otherwise agreed with the purchaser at the tender stage. b) All wiring leading from the interface with UK Power Networks systems to manufacturers’ internal components must be ferruled in such a manner that all wiring is traceable. c) Double ferruling is not desirable but may be accepted in certain circumstances – this shall be subject to agreement at the tender stage. Page 46 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Design agreement Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : The following drawings are enclosed with the Standard and Schedules: Drawing number Drawing title A1 Impedance envelope for main transformer A2 Schematic of tap-changer control A3 General arrangement of standby voltage control panel A4 Typical arrangement of WTI circuit The following documents, which shall be sufficient to enable space and civil requirements for the transformer and associated equipment to be accurately determined, shall be submitted by the Tenderer with his Tender: Item Drawing number Drawing Title B1 Preliminary outline giving side and end elevations and plan of the tanks including tap changer, auxiliary transformer, neutral earthing reactor, terminals, cable boxes and cooling equipment B2 Preliminary foundation details B3 Preliminary rating and diagram plates for the main transformers B4 Relevant manufacturer’s safety data sheets B5 Copy of the Tenderer’s environmental policy The following drawings shall be submitted by the Contractor for approval by the date shown in Schedule B Item1 or at other times as may be agreed with the Purchaser. Prior to the date shown in Schedule B Item 1: Item Drawing number Drawing Title C1 Definite arrangement of the complete main transformer and coolers, auxiliary transformers and neutral earthing reactors C2 Definite foundation plan C3 Definite arrangement of cable boxes and disconnection chambers C4 Definite arrangement of the tap change control and cooler control marshalling boxes or kiosks and standby voltage control cubicles Page 47 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Item Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : Prior to the commencement of manufacture: Drawing Title D1 Name, rating and diagram plates and diagrams of connections for the main transformers, auxiliary transformers and neutral earthing reactors showing the relative position of leads taken out of the tank D2 Valve function plate D3 Circuit diagrams of tap-change control, cooler control, indications, alarms trips, heaters and socket outlets D4 Wiring diagram of tap changer, current transformers and other fittings D5 Wiring diagrams of tap change control and cooler control marshalling kiosks and standby voltage control cubicles D6 Diagram and schedule of auxiliary multicore cables, including those to be installed by the Purchaser D7 Drawing showing any special features likely to need attention during testing or maintenance EQUIPMENT DATA An electronic file, in Microsoft Excel format, shall be provided showing all data relevant to the equipment supplied. This data is for direct input into the UK Power Networks MIMS database – a sample format will be supplied by UK Power Networks. ASSEMBLY, OPERATING AND MAINTENANCE INSTRUCTIONS Before the Completion Date specified in Schedule B, Item 5, the Contractor shall submit, in English, Assembly, Operating and Maintenance Instructions and Diagrams for approval by the Purchaser and after approval, but not later than one month before the commencement of the maintenance period, shall supply in a durable form the number of copies specified in Schedule D. MODELS AND SAMPLES The Contractor shall submit models and samples of materials as requested from time to time by the Purchaser. Page 48 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Drawing number Grid Transformer Schedules Substation:…………………… 6 Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE F - Tests Tests shall be carried out in accordance with BS EN 60076. Special impulse tests are required on all transformers, including chopped wave at 110%. Tests shall be carried out in the order agreed in the test programme. Routine tests to be conducted on all transformers. The temperature rise tests on the transformer and cooling shall be undertaken in the physical configuration corresponding to the site layout. Auxiliary components (tap changers, pressure relief devices, pumps, etc.) can be given general type approval. Routine Test certificates for each auxiliary component shall be provided for each component which will include magnetisation test result sheets for the CTs. Where auxiliary components have not been approved by UK Power Networks, evidence of satisfactory type testing and/or previous service experience shall be required and submitted with the tender. The following tests shall be carried out in the factory and shall be regarded as a minimum requirement. Item Description UK Power Networks Requirement 1 Impulse Type test 2 Chopped wave impulse 110% Type test 3 Gas in oil analysis before and after tests All transformers 4 Temperature rise at rated power (forced cooling) Type Test 5 Temperature rise at CER rated power Type Test 6 Gas in oil analysis before and after tests Type Test 7 Particle count of oil at end of tests All transformers 8 Gas in oil analysis after tests All transformers 9 Physical properties of oil at end of all tests All transformers 10 Noise level test with frequency spectrum up to at least 1kHz Type Test 11 Harmonic current Type Test 12 Partial discharge All transformers 13 Zero phase impedance All transformers 14 Dielectric loss angle Type Test 15 Routine tests as defined in IEC 60076 All transformers 16 Auxiliary equipment tests including bushings and tap changers All units 17 Current transformers and connections. All CTs Page 49 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Factory tests Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : All appropriate checks and tests shall be performed during commissioning at site. A full and comprehensive programme of testing shall be part of the Contract. The proposed programme of testing shall be presented in tabular form for the approval of the Purchaser, and will subsequently form the basis of a commissioning schedule. The anticipated duration of the site testing shall also be stated. Page 50 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE SITE COMMISSIONING TESTS Grid Transformer Schedules Document Number: EDS 04-8000A Version : 2.0 Design doc No : Substation:…………………… 7 SCHEDULE G - Items of Equipment with Prices To complete each equipment detailed below there shall be provided the necessary oil, cabling, cable boxes, terminal boards, wiring, fuses, foundation bolts, labels and other sundries whether specified in detail or not. Item Description Price of each Item supplied, delivered, erected and tested (£ GBP) 1.0 Main Transformer complete with: 1.1 i) Tank mounted or separate oil/air coolers 1.2 ii) Tap-changer control marshalling box 1.3 iii) Cooler control marshalling box 1.4 iv) Standby voltage control cubicle 1.5 v) Routine tests in accordance with Schedule F 2.0 Loss Evaluation 2.1 i) No-load loss - No-load loss on principle tap x cost factor 2.2 ii) Load loss - Load loss (kWTap min + kWTap 7 + kWTap 13 + kWTap max )/4 x cost factor 3.0 Anti-vibration pads for transformer main tank 4.0 Sum for transport of main indivisible load to site and installed onto prepared foundation 5.0 Special lifting device for tap-changer maintenance (if required) 6.0 Miscellaneous Equipment 7.0 Special Tools and Equipment (if any): (To be listed and priced individually in Schedule M) TOTAL Page 51 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE (To be completed by the Tenderer) Grid Transformer Schedules Substation:…………………… 8 Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE H - Summary of Price and Quantities for Definite Work Item No. in Sch. G Description 1.0 Main transformer complete as Item 1 in Schedule G 3.0 Anti-vibration pads 4.0 Number Required Total Price (£GBP) Sum for transport of main indivisible load and installation onto prepared foundation 5.0 Special lifting device for tap-changer maintenance (if required) 6.0 Miscellaneous Equipment 7.0 Special tools and equipment TOTAL WARRANTY OFFERED (refer to Clause 26.1 of ES-04-8000) a. Defects Liability period Years b. Incidental costs per unit £ GBP Max Page 52 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE (To be completed by the Tenderer) Grid Transformer Schedules Substation:…………………… 9 Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE J - Prices for Work at the Option of the Purchaser Item Description Price of Each Item, Supplied, Delivered and off-loaded (£GBP) 1.0 Additional tests consisting of: a) Temperature rise tests in accordance with Schedule F on a tap position and loading to be agreed with the Purchaser. The test to also include DGA oil from top and bottom of main tank and from selector compartment per run b) Type impulse tests in accordance with Schedule F, less cost of routine test already included in Item 1 of Schedule G. c) Additional noise level test for complete transformer with all cooling plant in operation d) Frequency response analysis tests for main transformer immediately prior to transportation and immediately after off-loading at site 2.0 Spare oil pump 3.0 Copy of a set of photographs taken: a) of the core/winding assembly at cleat bar inspection stage, both HV and LV sides b) of the completed unit including assembled transformer/cooler bank at type test stage, all sides and top 4.0 Recommended spares: To be listed and priced individually in Schedule M. Page 53 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE (To be completed by the Tenderer) Grid Transformer Schedules Substation:…………………… SCHEDULE K - Access and Site Facilities The contractor shall ensure that all construction traffic and employees vehicles for which he is responsible, including his Sub-Contractors, use the following site access facilities. These facilities will be in constant use by all Contractors working on site. Road Entry Road Exit Rail Access Off-Loading Where equipment is to be erected by the Contractor, the Works shall include the off-loading of the equipment from the Contractor's vehicle and installation into its final position by the Contractor. The point of off-loading and methods of handling within the substation shall be agreed between the Purchaser and the Contractor. Any equipment that is not to be erected by the Contractor shall be off-loaded from the Contractor's vehicle onto a firm surface as close as practicable to the point of installation. The Contractor's vehicle shall incorporate suitable lifting apparatus, or separate means of off-loading shall be provided by the Contractor. The point of off-loading shall be agreed between the Purchaser and the Contractor. Contractor's Area (Contracts with Erection) The Contractor will, if he so request and if it is practicable, be allocated an area of land or space within an existing building for the purpose of temporary buildings, materials storage and the like. Materials, temporary structures or plant shall not be placed elsewhere unless, in the opinion of the Purchaser, these are required for the immediate construction of the Works. Accommodation for Employees (Contracts with Erection) The Contractor shall prohibit the committing of nuisance by his employees within the site or upon the land of the Company or others. Any employee found violating this provision shall be immediately discharged and not employed again on this contract. Page 54 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE 10 Document Number: EDS 04-8000A Version : 2.0 Design doc No : Grid Transformer Schedules Substation:…………………… 11 Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE L - Proposed Exceptions or Additions to the Standard The Tenderer shall state below the detail and extent to which his offer(s) departs from the specified requirements for every clause / sub-clause. The Tenderers offer will be deemed to fully conform to the requirements of the Standard (EDS 04-8000) and Schedules (EDS 04-8000A) except, where the Tenderer specifically states below. Clause / SubClause Conformance Description (Partial Conformance, NonConformance) Supplier Remarks Page 55 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE (To be completed by the Tenderer) Grid Transformer Schedules Substation:…………………… 12 Document Number: EDS 04-8000A Version : 2.0 Design doc No : SCHEDULE M - List of Special Tools and Equipment to be Used Item Description Quantity 1.0 LIST OF SPECIAL TOOLS AND EQUIPMENT TO BE USED: 2.0 LIST OF RECOMMENDED SPARES 3.0 LIST OF REQUIRED TRAINING Page 56 of 56 THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE (To be completed by the Tenderer)