Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
LHC SU-AC ACTIVITIES during EYETS 2016-2017 Jean-Frederic FUCHS & Dominique MISSIAEN Terminology • R : Roll angle (transversal inclination also called «tilt») of magnet • V : Vertical survey • H : perpendicular/tranversal to the beam direction 27/09/2016 EYETS 2016-2017 2 Terminology • R : roll angle (transversal inclination) of magnet Roll angle T VT 27/09/2016 EYETS 2016-2017 S VS 3 Terminology • V means vertical survey 27/09/2016 EYETS 2016-2017 4 Terminology • H means perpendicular/tranversal to the beam direction Duct will be used against air current 27/09/2016 EYETS 2016-2017 5 Preliminaries • SU work concerns essentially preventive maintenance/operation of alignment proposed either by : • SU when instabilities are well known, • LHC Civil engineering works : LSS1/LSS5, LSS6-R (dump), LSS2/LSS8 (Ti2/Ti8), ….. • LEP and LS1 feedback : S78, S81, S34, S23 • By OP or ABP for machine improvement. 27/09/2016 EYETS 2016-2017 6 Sector 78 (LSS + ARC) [ Roll + Vertical ] 1. Roll angle measurements and corrections LSS+ ARC [ 3 days ] 2. Vertical measurements LSS+ ARC [ ~ 8 days ] – Need LSS7 access 3. ~ 1 day for computing 4. Vertical smoothing [ ~ 10 days ] (to be confirmed) When : to be defined following RP restrictions for LSS7 (March, April) – High priority Constraints : LSS+ARC, need to access to LSS7-R, minimum co-activity, magnets must be cold (< 100 K), need to decrease the ventilation speed 27/09/2016 EYETS 2016-2017 7 Sector 81 (LSS + ARC) [ R + V + H ] 1. 2. 3. 4. 5. Roll angle measurements and corrections LSS+ ARC [ 3 days ] Vertical measurements LSS + ARC [ ~ 8 days ] Radial measurements from Q8 to Q8 [ ~ 8 days ] ~ 2 days for computing Vertical and radial smoothing [ ~ 10 / 15 days ] (to be confirmed) When : February/March 2017 (?) Constraints : LSS+ARC, minimum co-activity, magnets must be cold (< 100 K), need to decrease the ventilation speed, duct 27/09/2016 EYETS 2016-2017 8 LSS6 – Q10R6 Area (LSS + ARC) From Q5 to Q12 : • Roll angle measurements and corrections [1 day] • Vertical measurements [1.5 day] • Radial measurements [1.5 day] • ~ 1 day for computing • Tomography before alignment ? • Vertical and radial smoothing [~ 5 days] • Tomography after alignment ? When : February/March ? Constraints : minimum co-activity, magnets must be cold (< 100 K), need to decrease the ventilation speed, no duct, Tomography needed (before / after) if displacement > 1 mm (JP Tock) 27/09/2016 EYETS 2016-2017 9 LowBeta (TS3 ?) LSS1, LSS2, LSS5 and LSS8 • Levelling between SU network (GITL) and lowbeta [0.5 d x 4] • Foreseen to be done during TS3 (Nominal conditions of the lowbeta magnets) …. When : As soon as possible : December 2016 ? January 2017 ? Constraints : Need to access on L et R side on the same half day, need to access to Q3 triplets (10 min) under vacuum condition and with helium. 27/09/2016 EYETS 2016-2017 10 LSS1/LSS5 : LowBeta -> Q6 LSS1 and LSS5 : • Lowbeta (Q1, Q2, Q3) + MBXW (D1) + MBRC (D2) + MQ (Q5 and Q6) + survey network (GGPSO, GITL) • ~ 2 weeks for initial measurements (per LSS) • Few days for computing • ~ 2 weeks for alignment (per LSS) When : January 2017 – High Priority Constraints : no coactivity during radial measurements (wire / AT40x), no helium in triplets 27/09/2016 EYETS 2016-2017 11 And ….. • Levelling without ventilation in S78 : 1 week (March / April) • No ventilation at all and no co-activity (access conditions under discussion) • Magnets must be cold (< 100 K), • No need to go inside LSS7, SU can work after 17h30 • High priority • Measurement with new instrument (LS15) in S78 : 1 week (March / April) • Magnets must be cold (< 100 K) • No need to go inside LSS7 • Measurement with the train LSS7 (April) • No-coactivity (safety), • LSS7, 1 week 27/09/2016 EYETS 2016-2017 12 Mobile Scanning Leica Pegasus Backpack • Inertial Measurement, • 5 x cameras (360° pictures), • 2 x LiDAR, • ….. When : 15&16 December 2016 Where : LSS : to be defined following LHC constraints, no co-activity (scan) 27/09/2016 EYETS 2016-2017 13 LHC Work requested by others (?) • SU will be requested for : • A31L2 after exchange (?) : 0.5 d • Alignment of 6 collimators (LSS5, LSS7) : 0.5 d / component • Vacuum chamber/collimator measurements (LSS5) : 1 d for each ½ LSS • Alignment of 2 Roman Pots (LSS1) : 0.5 d • Alignment of BSRTR (LSS4) : 0.5 d • Alignment of MKI2D (LSS2) : 0.5 d • 3D Scans (JP Corso) • More ???? The CERN BD Layout must be updated before any alignment No Update = No Alignment ! Please contact us for any new request : D. Missiaen / J.F. Fuchs 27/09/2016 EYETS 2016-2017 14 EYETS 2016-2017 • Other SU activities during EYETS : injectors (SPS, PS, Booster, …), LHC experiments and non- LHC experiments, 3D scan, metrology and fiducialisation, ….. • Most of the field work is done by a Manpower contract under the supervision of CERN staff • Activities / planning /workload : 15/11/2016 • Preparation, supervision, coordination, data post processing and quality checks are done by CERN staff EYETS 2016-2017 27/09/201615 SU Contacts • EN/ACE-SU : “Large Scale Metrology” • Section Leader : D. Missiaen • LHC Coordinator : J.F. Fuchs • http://www.cern.ch/SU 27/09/2016 EYETS 2016-2017 16 Questions ? 27/09/2016 EYETS 2016-2017 17 27/09/2016 EYETS 2016-2017 18 LS1 Feedback 27/09/2016 EYETS 2016-2017 19 Sector 23 (ARC) [ R + H ] 1. Roll angle measurements and corrections LSS+ ARC [ 3 days ] 2. Radial measurements from Q8 to Q8 [ ~ 8 days ] 3. 1 day for computing 4. Radial smoothing [ ~ 10 days ] (to be confirmed) When : February/March 2017 (?) Constraints : minimum co-activity, magnets must be cold (< 100 K), need to decrease the ventilation speed, duck 27/09/2016 EYETS 2016-2017 20 Sector 23 (LSS + ARC) [ R + V + H ] 1. 2. 3. 4. 5. Roll angle measurements and corrections LSS+ ARC [ 3 days ] Vertical measurements LSS + ARC [ ~ 8 days ] Radial measurements from Q8 to Q8 [ ~ 8 days ] 1 day for computing Vertical and radial smoothing [ ~ 15 days ] (to be confirmed) When : February/March 2017 (?) Constraints : LSS+ARC, minimum co-activity, magnets must be cold (< 100 K), need to decrease the ventilation speed, duck 27/09/2016 EYETS 2016-2017 21