Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Rural Water Programme 2006 Evaluation of Progress John Fitzgerald Engineering Inspector Procurement Guidance Documents Part A: Rural Water Modulw (DBO) Part B: Small Wastewater Projects Part C: Small Water Supply Projects Part C: Small Water Supply Projects Chapter 12: Conventional Procurement for GWSS Prior to Group employing Consulting Engineer Local Authority will (a) Prepare Brief (b) Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction. Scale of fees: (a) Fee per member for preparation of design drawings and calculations still valid. (b) Scale of fees based on Circ. 11/87 Preliminary Report 0 – 20% Design and Tender Drawings. Up to 30% Conditions of Contract / Specifications. 0 – 20% Construction Stage. 0 – 30% (c) PSDS accures separate fee. (ACEI scale of fee dated 9/2/96) The Procurement “Goalposts” Waste Water Water Directive 04/18/EC Directive 04/17/EC OJEU OJEU National National Newspapers Newspapers Three Prices Three Prices One Price One Price L. Doyle The Procurement “Goalposts” Waste Water OJEU Directive 04/18/EC National Water Newspapers Directive 04/17/EC Three Prices One Price L. Doyle Water Quality Water Conservation New & Upgrade (85%) Takeover (100%) DBO Civil (85%) M&E (100%) Metering grants for DBO only. Universal Metering Domestic (85% grant subject to max €300) Non-domestic (85%) grant subject to max €250) Additional CLAR funding