Rural Water Programme
2006
Evaluation of Progress
John Fitzgerald
Engineering Inspector
Procurement Guidance Documents
Part A:
Rural Water Modulw (DBO)
Part B:
Small Wastewater Projects
Part C:
Small Water Supply Projects
Part C:
Small Water Supply Projects
Chapter 12: Conventional Procurement for GWSS
Prior to Group employing Consulting Engineer
Local Authority will
(a)
Prepare Brief
(b)
Determine indicative scale of fee
acceptable for grant purposes – if
scheme advances to construction.
Scale of fees:
(a)
Fee per member for preparation of design drawings and
calculations still valid.
(b)
Scale of fees based on Circ. 11/87
Preliminary Report 0 – 20%
Design and Tender Drawings. Up to 30%
Conditions of Contract / Specifications. 0 – 20%
Construction Stage. 0 – 30%
(c)
PSDS accures separate fee.
(ACEI scale of fee dated 9/2/96)
The Procurement “Goalposts”
Waste Water
Water
Directive
04/18/EC
Directive
04/17/EC
OJEU
OJEU
National
National
Newspapers
Newspapers
Three Prices
Three Prices
One Price
One Price
L. Doyle
The Procurement “Goalposts”
Waste Water
OJEU
Directive
04/18/EC
National
Water
Newspapers
Directive
04/17/EC
Three Prices
One Price
L. Doyle
Water Quality
Water Conservation
New & Upgrade (85%)
Takeover
(100%)
DBO
Civil
(85%)
M&E
(100%)
Metering grants for DBO only.
Universal Metering
Domestic (85% grant subject to max €300)
Non-domestic (85%) grant subject to max €250)
Additional CLAR funding