CV activities for CPS during YETS PS & PSB YETS meeting 8-10-2015 Highlights • The manpower is common for all the machines of the PS Complex and for half of the LHC. • Time constraints must be sent to the contractor → please send your specific request for water. • Preliminary plan as been established. Highlights Activities for the YETS • Normal yearly maintenance • Example for the cooling circuits: • Emptying the primary circuits and cleaning of the cooling towers • Repairs • Necessary maintenance (filters, belt, greasing, …) • Instrumentation check / calibrating • Bugs fixing • Corrective maintenance Activities for the YETS • Leir, Linac 2 and 3: • Mechanical overhaul of one secondary pump • Linac 3: • Replacement of the power and control cables connections of the ventilation • Booster: • Cleaning the heat exchanger of the cooling plant • Mechanical overhaul of one primary pump • Modification of the beam dump ventilation (sensor + control) → Test with the CCC • Installation of a flowmeter on the extraction air duct for HSE • Create new connections on cooling circuit for power converter in room BRF2 • Take samples and inspection to prepare LS2 works • Request of the Survey (see hereafter) Activities for the YETS • PS: • POPS cooling: create new connections for the future cooling of the dummy loads. • Creation of new connections for the 10 MHz cavity • Chilled water pumps mechanical overhaul • Take samples and inspection to prepare LS2 works • ISOLDE • Target cooling: modification of the control system for the leak detection • Main cooling plant: new version of the program and functional tests • Modification of the stack (roof bldg.170) • Medicis: functional test of the ventilation and commissioning of the hot cell ventilation • East Area • Main cooling plant: new version of the program and functional test • AD • Modification of the main cooling pipework to install flowmeter • Sump in TT6: correctives interventions MEYRIN, CPS (1/2) Linac + Leir Booster PS Circuits Stop Restart LEIR – LINAC 2 and 3 (Demi water) 15/12/2015 25/01/2016 LINAC 2 (Raw water) Running LINAC 3 (Raw water) 15/12/2015 25/01/2016 Booster / TT2 16/12/2015 01/02/2016 Booster – chilled water (affecting PS 359 RF room) 16/12/2015 01/02/2016 PS – Central building Anneau 16/12/2015 26/01/2016 PS – Main magnet 16/12/2015 01/02/2016 POPS 16/12/2015 26/01/2016 PS – Chilled water 16/12/2015 26/01/2016 MEYRIN, CPS (2/2) Machine Circuits Stop Restart Isolde 7/12/2015 29/02/2016 East area 18/11/2015 21/03/2016 AD TBD AD Target 16/11/2015 TBC CTF3 CTF3 TBD nTOF nTOF Running Isolde East area AD 29/03/2016 Survey request Survey request Survey request