Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Soil erosion wikipedia , lookup
Terra preta wikipedia , lookup
Soil respiration wikipedia , lookup
Surface runoff wikipedia , lookup
Crop rotation wikipedia , lookup
Soil salinity control wikipedia , lookup
Soil compaction (agriculture) wikipedia , lookup
No-till farming wikipedia , lookup
Soil food web wikipedia , lookup
WASTE MANAGEMENT AND REMEDIATION OF CONTAMINATED AREAS Nº Market Segment State 1 GLASS MANUFACTURING INDUSTRY Rio de Janeiro 2 3 4 5 FUEL STORAGE AND DISTRIBUTION GLASS MANUFACTURING INDUSTRY FUEL STORAGE AND DISTRIBUTION AUTO-PARTS MANUFACTURING INDUSTRY São Paulo Rio de Janeiro São Paulo São Paulo Description of Supply Management and service delivery: Excavation, removal and stacking of contaminated soil with waste of metals with characterization NBR 10004, comprising 24,300 tons. Homogenizing the ground totaling 3,000 tons. - Excavation, removal, loading, transport and disposal of 2,370 tons of soil contaminated with metals. - Treatment and disposal of water originating from the excavations. Year 2011 and 2012 Management and service delivery: Dismantling and disposal of scrap tankage (500 ton) 2011 - Demolition of concrete structures and removal of debris (3,000 tons), 2012 - Excavation, loading, transport and disposal of soil contaminated with hydrocarbons in the free phase (1,900 ton) - Excavation, piling and treatment via biopilhas on site soil contaminated with hydrocarbons in the adsorbed phase (16,370 tons). - Backfill the area with treated soil. and Management and service delivery: Loading, transport and disposal of soil contaminated with waste metals comprising 24,300 tons. 2011 Management and service delivery: Demolition of concrete structures and removal of debris (1,000 tons), 2011 - 2012 Excavation, loading, transportation and disposal of soil to prepare the area for paving (1,800 m2), - Backfill wells and ditches with inert soil (760 m3). - Preparation and paving with paving the parking area for trucks. Management and service delivery: Emergency planning and Implementation of Measures to be Implemented with the objective of correcting the situation of landslides (boçoroca). Comprising: - Topographic mapping, - Surveys and analysis of soil samples, - Geological and geotechnical project design, - Implementation of the project to stabilization. and 2012 and 2011 and 2012