AGENCY REQUEST FOR BUILDING COMMISSION ACTION December 2009 Agency: Department of Corrections Locations: Waupun Correctional Institution (WCI) Waupun, Wisconsin Waupun Central Generating Plant (CGP) Waupun, WI Request: Request authority to: a) Construct various maintenance and repair projects at a total estimated cost of $4,663,400 ($3,591,100 General Fund Supported Borrowing - Facilities Maintenance & Repair and $1,072,300 General Fund Supported Borrowing - Utilities Repair & Renovation); b) Transfer all approved GFSB All Agency Allocations to the Department of Corrections Infrastructure [Z480] appropriation; and c) Permit the Division of State Facilities to adjust individual project budgets. UTILITY REPAIR AND RENOVATION LOCATION PROJ. NO. Waupun 09K3A WCI 09B4M PROJECT TITLE Overhaul Turbine #2 Electrical Repairs UR&R SUBTOTAL GFSB $616,000 $456,300 $1,072,300 FACILITIES MAINTENANCE AND REPAIR LOCATION PROJ. NO. PROJECT TITLE WCI 09K2Z South Hall Cell Plumbing FM&R SUBTOTAL GFSB $3,591,100 $3,591,100 DECEMBER 2009 TOTALS $4,663,400 Waupun Central Generating Plant Turbine #2 Overhaul (Project No. 09K3A). Request authority to perform a Turbine Overhaul project at the Waupun Central Generating Plant at a project cost of $616,000 GFSB- Utilities Repair and Renovation. This project will take the turbine completely off line for inspection and repair. These inspections should be done every five years. This inspection is necessary to ensure that the turbine will continue to function without a loss of service. The Waupun Central Generating Plant provides utilities to both the Waupun Correctional Institution and Dodge Correctional Institution. Interruption of services to these institutions would be a critical emergency for the Correctional System. Turbine #1 will remain in service and was overhauled in the previous biennium as project #08I3T. Budget Construction Design (8%) Management (4%) Contingency (15%) Total $485,000 $38,800 $19,400 $72,800 $616,000 Schedule Project Approval A/E Selection Design Report Receive Bids Construction Start Construction Complete Dec. 2009 Jan. 2010 Mar. 2010 May. 2010 July 2010 Dec 2011 Previous Building Commission Action: None. Waupun Correctional Institution South Hall Plumbing Upgrade (Project No. 09K2Z). Request authority to construct a Cell Hall Plumbing Upgrade project at Waupun Correctional Institution (WCI) at a total project cost of $3,591,100 General Fund Supported Borrowing – Facilities Maintenance and Repair. This project will remove existing china type water closets and lavatories from each cell and replace with new stainless steel water closets and lavatories and replace the sanitary waste and vent piping, the hot water, hot water circulating and cold water piping in the Southwest Cell Hall with 200 cells and South Cell Hall with 240 cells. The sanitary piping will be replaced to the exterior of the cell halls. The cell halls will be occupied during construction. The current sinks and toilets are made of porcelain, which is broken easily and can be used as a weapon. The flush valves are a major maintenance problem. These flush valves open at 35 pounds of pressure and have caused the entire institution to lose water pressure. The sewer and water piping are originals that do not meet code requirements, requiring modification with the installation of new fixtures. Favorable bidding conditions and the experience completing the North Cell Hall Plumbing Project (#02A4U) lead us to believe that the project can be done well within this budget. Budget Construction Abatement Design (8%) Management (4%) Contingency (15%) Total Schedule $2,800,000 30,000 224,400 112,200 424,500 $3,591,100 Project Approval A/E Selection Design Report Construction Approval Receive Bids Construction Start Construction Complete Dec. 2009 Feb. 2010 Apr. 2010 May 2010 July 2010 Sep. 2010 Aug. 2011 Previous Building Commission Action May 2007- Approved project #02A4U to upgrade the North Cell Hall Plumbing. Waupun Correctional Institution Electrical Repairs (Project No. 09B4M). Request authority to construct electrical repairs at Waupun Correctional Institution (WCI) at a total project cost of $456,300 General Fund Supported Borrowing –Utilities Renovation and Repair. A study of WCI’s electrical system in the institution’s utility tunnel, cell halls and kitchen was completed in August 2009 to identify life safety hazards and code violations. This project will address the high priority areas identified in that study by removing and replacing conduits and conductors in the utility tunnels that have rusted through the conduit, replace receptacles in cell halls with GFCI protected receptacles, and conduct various other electrical upgrades and repairs at the institution. Budget Construction Design (8%) Management (4%) Contingency (12%) Total Schedule $368,000 $29,400 $14,700 $44,200 $456,300 Project Approval A/E Selection Design Report Receive Bids Construction Start Construction Complete Previous Building Commission Action None. Dec. 2009 Feb. 2010 Apr. 2010 Jul 2010 Jul 2010 Aug 2011