Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Obsolete Meter Upgrade Kit PM 820 to PM 5563 RD Do you have a PM 820 meter? The PM 820 meter is obsolete, there are no longer parts or repairs available from the manufacturer. PM 820 is ideally suited to local and remote monitoring of low or high voltage electrical installations in critical power environments. Typical applications include power quality compliance monitoring, disturbance and harmonic analysis, energy metering, cost allocation and sub-billing and demand and power factor control. Don’t wait for this meter to fail to plan an upgrade. Typical 820 meter failure modes: The Remote Mounted Display (RMD) goes blank or the buttons no longer work Logging on the meter will stop working Communications cards lock up and do not respond PM 820 Meter APT has a solution APT designed an upgrade kit for the obsolete PM 820 meter as a solution: New PM 5563 meter with remote display to match the RMD panel cutout and includes all required hardware Minimizes rewiring, matches existing meter wire harness to new meter Integrates into ION StruxureWare or Power Monitoring Expert software systems Data Continuity (preserves historical data from your old meter) If necessary, electrician support to remove old meter and replace with new PM 5563 Meter PM 5563 Meter www.apt4power.com (408) 342-0790 Obsolete Meter Upgrade Kit PM820 to PM5563 RD CHOOSE YOUR METER UPGRADE KIT Pick the obsolete meter upgrade kit that matches your current meter, then select the level of support you need to upgrade your meter minimizing the impact to your operation. Not sure which package is right for you? Contact APT and one of our technical experts can assist you in selecting the upgrade kit that suits your needs. Upgrade Kit Description Base 820-5563 Basic Simple kit—do it yourself A DC Power Supply Match the power supply of your old meter B Auxiliary I/O Match the Aux inputs and outputs on your old meter C Expansion I/O Match the expanded inputs and outputs on your old meter Support Description 1 Configuration APT Configuration to match your old meter before shipping to you 2 Integration APT integrates the new meter into your system after upgrade 3 Installation APT dispatches electricians to handle the actual upgrade of the meter Visit our website at the link below or scan the QR code to the right for more information, or to get a quote. www.apt4power.com/MeterReplacement As an ION and PowerLogic meter EcoXpert Systems Integrator for Schneider Electric, APT is uniquely qualified to upgrade your obsolete ION and PowerLogic meters and software. Our integrator status guarantees you the upgrade solution will be properly configured, integrated and installed. [email protected] www.apt4power.com (408) 342-0790