* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download sr 2017 (gibraltar rd.) over schuylkill river project
Sydney Harbour Bridge wikipedia , lookup
San Francisco–Oakland Bay Bridge wikipedia , lookup
Tacoma Narrows Bridge (1940) wikipedia , lookup
Golden Gate Bridge wikipedia , lookup
Structural integrity and failure wikipedia , lookup
Brooklyn Bridge wikipedia , lookup
Forth Bridge wikipedia , lookup
Mackinac Bridge wikipedia , lookup
BP Pedestrian Bridge wikipedia , lookup
Walkway over the Hudson wikipedia , lookup
S.R. 2017 (GIBRALTAR RD.) OVER SCHUYLKILL RIVER PROJECT DESCRIPTION This project involves the rehabilitation of a 6-span bridge carrying S.R. 2017 (Gibraltar Rd.) over the Schuylkill River in Exeter and Robeson Townships, Berks County, Pennsylvania. The two lane S.R. 2017 is classified as an urban minor arterial and carries approximately 7,299 vehicles per day. The rehabilitated structure will maintain a similar out-to-out width as the existing, and will provide two traffic lanes and two shoulders including a widened east shoulder with additional capacity for a future sidewalk or multi-use trail. A detour utilizing SR 724, I-176 and US 422 is proposed although access to each end of the bridge project limits will be maintained for local residents and Exeter Scenic River Trail users. Construction is anticipated to begin in early 2017 and will utilize Accelerated Bridge Construction (ABC) techniques to minimize construction duration. Proposed Cross Section Photo 1: SR 2017, looking South (Exeter Scenic Trail at Lower Right) Photo 2: East Bridge Elevation looking Southwest Proposed East Elevation Project Location Map Rehabilitation of the Gibraltar Rd (SR 2017) Bridge over the Schuylkill River – Exeter & Robeson Twps. Existing Bridge Background Information • 6-Span Prestressed Concrete Adjacent Box Beam Bridge • Built in 1974 to replace bridge destroyed by Hurricane Agnes • Overall Length – 460’-0”; Out-to-Out Width – 53’-7½” • Roadway – Two 12’ Travel Lanes & 10’ Shoulders • Sidewalk – 5’-0” Wide on East (Downstream) Side only • Gibraltar Road (SR 2017) Classification – Urban Minor Arterial • Average Daily Traffic – 7,299 Vehicles • Asphalt Riding Surface with Delineators in Shoulders • Reinforced Concrete Piers and Abutments Brief Project History • Project Design NTP & Bridge Inspection – Late 2014 • Engineering Analysis & Environmental/Cultural Coordination • Preliminary Design Phase Nearing Completion – Spring 2016 Rehabilitation of the Gibraltar Rd (SR 2017) Bridge over the Schuylkill River – Exeter & Robeson Twps. Proposed Bridge • Full Superstructure Replacement • Accelerated Bridge Construction (ABC) • Reuse and Rehabilitation of Piers & Abuts • NEXT Beam Type D – Deck Incorporated • At Roadway Level – Basically the Same • Open Railing System on Concrete Curb • Exception – Sidewalk Elimination • Minimal Approach Roadway Impacts • Wide Shoulder Accommodates a Future Multi-Use Trail Rehabilitation of the Gibraltar Rd (SR 2017) Bridge over the Schuylkill River – Exeter & Robeson Twps. Proposed Construction • Road Closed During Construction • Official Detour – SR 724 to I-176 to US 422, 5.9 Miles • Anticipated Start – Early 2017 • Access Maintained to Driveways/Exeter Scenic Trail • Detour Duration – 3 Months • No Anticipated Property Acquisition • Proposed Temporary Use of Property along West Side PROPOSED PROPOSED