Key_Personnel_files/Corsair Resume
... 54 bridge to the tie back walls required that spread footings used to support the existing US 54 bridge be underpinned with micro piling. Mr. Galvan designed the footing underpinning details and provided construction phasing details for underpinning and wall construction. The problematic nature of t ...
... 54 bridge to the tie back walls required that spread footings used to support the existing US 54 bridge be underpinned with micro piling. Mr. Galvan designed the footing underpinning details and provided construction phasing details for underpinning and wall construction. The problematic nature of t ...
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) PP 53-66
... The auditorium houses a lounge and mechanical Areas in addition to two level seating and stage. While the floors are planned as conventional cast-in-situ R.C.C. beam, slab structure the large span (~18m x 18m) roof over seating area is having one way closely spaced ribbed slab with the rib spacing o ...
... The auditorium houses a lounge and mechanical Areas in addition to two level seating and stage. While the floors are planned as conventional cast-in-situ R.C.C. beam, slab structure the large span (~18m x 18m) roof over seating area is having one way closely spaced ribbed slab with the rib spacing o ...
Bridges
... Cables – thick steel ropes from which the decking is suspended Decking – the supported roadway on a bridge ...
... Cables – thick steel ropes from which the decking is suspended Decking – the supported roadway on a bridge ...
Estruturas de Pontes e Passarelas
... August 2002: start of work on pier support C0 September 2002: assembly of roadway begins November 2002: first piers complete 25 February–26 February 2003: laying of first pieces of roadway November 2003: completion of the last piers (Piers P2 at 221 m and P3 at 245 m are the highest piers in the wor ...
... August 2002: start of work on pier support C0 September 2002: assembly of roadway begins November 2002: first piers complete 25 February–26 February 2003: laying of first pieces of roadway November 2003: completion of the last piers (Piers P2 at 221 m and P3 at 245 m are the highest piers in the wor ...
sr 2017 (gibraltar rd.) over schuylkill river project
... This project involves the rehabilitation of a 6-span bridge carrying S.R. 2017 (Gibraltar Rd.) over the Schuylkill River in Exeter and Robeson Townships, Berks County, Pennsylvania. The two lane S.R. 2017 is classified as an urban minor arterial and carries approximately 7,299 vehicles per day. The ...
... This project involves the rehabilitation of a 6-span bridge carrying S.R. 2017 (Gibraltar Rd.) over the Schuylkill River in Exeter and Robeson Townships, Berks County, Pennsylvania. The two lane S.R. 2017 is classified as an urban minor arterial and carries approximately 7,299 vehicles per day. The ...
Walkway over the Hudson
The Walkway over the Hudson (a.k.a. Poughkeepsie Bridge, Poughkeepsie Railroad Bridge, Poughkeepsie-Highland Railroad Bridge, High Bridge) is a steel cantilever bridge spanning the Hudson River between Poughkeepsie, New York on the east bank and Highland, New York on the west bank. Built as a double track railroad bridge, it was completed on January 1, 1889 and formed part of the Maybrook Railroad Line. It was taken out of service on May 8, 1974 after it was damaged by fire. It was listed on the National Register of Historic Places in 1979, updated in 2008. It was opened as Walkway Over the Hudson State Historic Park on October 3, 2009, as a pedestrian walkway, making it the longest footbridge in the world.