Project approved by UTTIPEC
1. Name of the Project:
Proposal of Link Road connecting Press Enclave road
with Outer Ring Road.
2. Name of the Agency:
Delhi Integrated Multi Modal Transit Systems
Limited, Government of
Delhi
3. Consultants:
Craphts Consultants(I) Pvt. Ltd.,
14/3, Mathura Road, Faridabad
Ph. 95129-2278813, 2275948
4. Project Scheduled:
a.
Likely to be started by March 2009.
b.
Likely to be completed by June, 2010.
5. UTTIPEC Processing:
a. The project of DIMTS was considered by UTTIPEC Working Group IIB in
its meeting dt. 20.11.08.
b. Working Group recommended the project for approval with following
concerns/observations.

The traffic speed, as expected to be 40 Km./h, on the interferencefree down ramp may not be correct , especially during lean period.

The weaving length of 150 meters may cause congestion during
the peak hour on Outer ring road and may create unsafe conditions
during the lean period.

At the point of merger of ramp loop with the outer ring road the
available carriage way space of 10 mts may not be adequate to
accommodate through traffic comprising of public transport,
personalized vehicles and non motorized vehicles.

The proposed new link road is likely to have additional induced
traffic which has not been accounted for in traffic projections.

The proposed link road including the ramp loop may attract public
opinion due to shift in function of the existing internal colony road
to local area link.

DIMTS shall interact with the local residents to convince them
about the benefits of the proposal before implementing the project.

All road geometrics and engineering design parameters are to be
ensured by DIMTS as per norms.
c. UTTIPEC Governing body in its meeting held on 21.11.08 under the
chairmanship of Hon'ble L.G, Delhi accorded its approval in principle,
based on the recommendation and observation/concern of the working
group meeting.
6. Location Map
7. Copy of the approved plan
8. For additional details:
kindly contact D.G.M., (Engineering),DIMTS, 2nd
Floor, ISBT, Kashmere Gate, Delhi. 110006. Ph.
No. 43090100.