Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Minutes of the Land Use Subcommittee, November 16, 2006 at 7:15 at Beth’s house Present: Ernie Burgess, Mabel Doughty, Beth Howe (Chair), Sheila Jordan and Peter Olney. Absent: Nancy Adams, Leila Bisharat, Marguerite Bowman, Bruce Bowman, Jane Frizzell and Bob Libby. Summary of the discussion with Bill Shane and Bill Longley at the Town Office that afternoon. It was a very useful meeting and there is a tape recording of it if anyone wants the details. People who came were Mabel, Beth, Sheila, Bruce, Peter and Bob. Cumberland has four code enforcement officers: Longley who is joint with Yarmouth, Richard Peterson, plumbing; Stanford Brown, electrical inspector; and Dan Small who is the fire chief but also does some back-up inspections especially on chimneys, oil burners and sprinklers. Shane did a “back of the envelope” calculation that Chebeague might need a CEO for one day a week and that this should be covered by the building permit fees which have recently been high on Chebeague. We asked Longley about the pros and cons of having a building code. He said that there are two national model codes. The Residential Code covers one and two family dwellings while the International Building Code covers nonresidential structures including apartment buildings. He said that when he had worked in Woolwich they did not have a building code. Neither does Arrowsic. If Chebeague had a building code it would be unusual among small communities. A few communities like Freeport have building codes other than the state-adopted ones, but they get out of date as building technology changes. Backup safeguards: In communities without an electrical code there is a state-wide electrical code and there are state inspectors, but not enough to provide regular inspections to all small communities. The state licenses electricians and plumbers. CMP requires a sign-off by a master electrician (and?) a state permit to connect to a new building. There is no state licensing of builders. Not having a building code is not really an issue of cost since the building permit fees can cover the cost. It is an issue of how regulated people want to be. Localities have no choice about shoreland zoning. As a firefighter, he thought that the danger of fire due to faulty wiring was not great. But it is true that people building their own houses may be an issue. 1 Peter asked whether, if we do adopt all of Cumberland’s land use codes, would it make sense to adopt them completely initially and then make modifications. Longley said he thought that made sense. He walked us through the process of inspections that would be done on a new house: Septic. Get HHE 200 permit. Prebed inspection of the cleared site for the septic system. Then a second inspection is one when the chambers are all in. A final inspection is done when the septic system has been covered and grassed over. Then the builder gets a building permit. He has to submit plans, specs, a plot plan with setbacks. Then when the foundation has been put in and before it is back-filled there is an inspection related to the drainage and frost protection. Once the framing is done and before the sheetrock there is an inspection of the framing, wiring and plumbing in the walls. After the sheetrock and finish work there is a final inspection of the plumbing, electrical and building elements. Then the occupancy permit can be given (it seems not to be automatic and is sometimes forgotten till the house is sold. Inspections take from 10 to 30 minutes. Multiple inspections will take longer. The building permit fee covers the cost of the inspections. It cannot be an arbitrarily high amount but must be consistent with the cost of the inspection work that it covers. The fee in Cumberland is based on square footage (some towns use value of the building). Electrical permit is 5 cents per square foot with a minimum fee of $50. Plumbing has a minimum $24 that goes to the state. The rest of the fee is based on the number of fixtures (?). [We need to get copies of the fee schedules.] If Chebeague adopts a code it should get a copy to keep in the public library so that it is available to anyone who wants to look at it. There should be enough copies for the CEO and the Town Clerk to have. He lent us copies of the various model codes. The budget item for “publications” is for getting multiple copies of these codes. Membership in ICC which publishes the codes is $100 per year. The codes cost extra. How much work comes to the Board of Zoning Appeals from Chebeague? Longley said about 2 cases over the past 2.5 years. This will depend on how many special exceptions the zoning that Chebeague adopts has. Special exceptions are acted on by the ZBA. Also it is an appellate body for the decisions of the CEO; some CEOs have a lot of appeals, others, very few. Someone asked how he handles the enforcement of the codes. He said they are not out looking for violations. If an occupancy permit has not been issued, for example, that will turn up when the house is sold. But he did recommend that the CEO and the assessor have an annual update on every project that is underway, from whole houses to decks and sheds. This minimizes slippage, and it is useful for the two officials to look at construction projects together. 2 Longley and Shane said that since Cumberland and Yarmouth already have an interlocal agreement on code enforcement, they would not have enough capacity to provide this service for Chebeague. Someone asked how we might find an inspector. Longley said that the State Planning Department keeps a roster of certified inspectors. North Yarmouth would be a logical community to approach because of Barbara Skelton’s (McPheters) background on Chebeague. She is full-time there. Frye Island has a full-time CEO though it has no winter residents, so that person might be approached. The jobs of assessor and CEO might be shared if someone had the skills. He thought it is better for the CEO not to live in the community where s/he works because of the pressures inherent in knowing people and being interdependent. Someone asked if there is a special computer program for doing the code enforcement record keeping. Longley said that Cumberland just uses an access spreadsheet. He does use the Town’s GIS system sometimes but usually gets help from someone else when he wants information. Other budget items: legal services. Longley said this is something that is very erratic from year to year Chebeague did have a junkyard case a few years ago that went to court. He went to court but also had the help of the Town attorney. Attorneys fees may be paid by the violator. He belongs to the Maine Building Officials International (?) Association, paid by the Town. Cumberland is doing less of their printing of forms and ordinance changes outside, and more internally. He had a capital item of a lap-top computer. Should we have a floodplain ordinance? Longley said that it is a good idea. FEMA is in the process of revising the Cumberland maps, including Chebeague, now. Mabel asked about having a wetlands ordinance. Longley said Cumberland does not have one but Yarmouth has adopted one in the past few months. Subcommittee meeting that evening: Sheila moved, seconded by Mabel to adopt the minutes. Sheila corrected $1700, should be $17,000. Amended minutes passed unanimously. Ernie reported that Harpswell has no building code but they do have two full-time code enforcement officers. They also have a full-time town planner. The CEOs issue permits and do inspections for zoning and site plans, shoreland zoning, runoff and siltation. Construction and electrical inspections as well though others asked what this involved if they have no building code. The most pressing problem with their ordinance now is regulation of wharves. They are not interested in having an interlocal agreement with us for code enforcement. 3 Since Bill Longley had virtually recommended that Chebeague not have a building code, the committee discussed again the pros and cons for one. It is a very basic issue of individual freedom weighed against health and safety. Peter made the point that the issue of protection from fires is not just an issue of whether the wiring is faulty but whether the house is built so that it is fire resistant or retardant and that can be required in a building code. It was agreed that this issue is one that has to be put before all Chebeague residents, perhaps at the public meeting on December 3. Beth said she would work up numbers for a code enforcement budget and update the RFP draft. Ernie will talk again with Long Island – probably Stevie Train – about what their inspections cover and whether they would be interested in exploring an interlocal agreement. 4