Energy Measuring Unit EcoMonitorLight Series
... upper/lower limits monitoring, alarm output and pulse input/output, in addition to the Standard Model features ② Standard Model: For customers who "want to start measuring energy in a simple and low-cost manner". ...
... upper/lower limits monitoring, alarm output and pulse input/output, in addition to the Standard Model features ② Standard Model: For customers who "want to start measuring energy in a simple and low-cost manner". ...
Negotiated Customer Connection Contract
... The Customer must ensure that: 4.1.1 the electrical plant in its facility complies with the relevant Australian Standards as applicable at the time of first installation of that electrical plant in the facility; 4.1.2 circuit breakers provided to isolate the Customer’s facilities from Energex’s faci ...
... The Customer must ensure that: 4.1.1 the electrical plant in its facility complies with the relevant Australian Standards as applicable at the time of first installation of that electrical plant in the facility; 4.1.2 circuit breakers provided to isolate the Customer’s facilities from Energex’s faci ...
Stakeholder Comparison Comment Rationale Matrix 2011-09-28 AESO AUTHORITATIVE DOCUMENT PROCESS
... fault conditions and evaluate the above relay’s loadability at 0.85 per unit voltage and a power factor angle of 30 degrees. ...
... fault conditions and evaluate the above relay’s loadability at 0.85 per unit voltage and a power factor angle of 30 degrees. ...
Stakeholder Comparison Comment Rationale Matrix 2011-09-28 AESO AUTHORITATIVE DOCUMENT PROCESS
... above, except for switch-on-tofault schemes, the beginning of the first calendar quarter following ninety (90) days after the date of approval by the Commission. For requirements R1 and R2 for transmission lines operated at 100 kV to 200 kV as identified by the ISO as critical to the reliability of ...
... above, except for switch-on-tofault schemes, the beginning of the first calendar quarter following ninety (90) days after the date of approval by the Commission. For requirements R1 and R2 for transmission lines operated at 100 kV to 200 kV as identified by the ISO as critical to the reliability of ...
Section 3 GDT Telecom Applications Protection Examples
... Telecom equipment should be protected from overvoltage conditions using GDTs, MOVs, or silicon devices such as SIDACtors or TVS diodes. Gas Discharge Tubes / Surge Arresters are mostly used for Primary Protection against transients caused by lightning. Secondary Protection applications traditionally ...
... Telecom equipment should be protected from overvoltage conditions using GDTs, MOVs, or silicon devices such as SIDACtors or TVS diodes. Gas Discharge Tubes / Surge Arresters are mostly used for Primary Protection against transients caused by lightning. Secondary Protection applications traditionally ...
Metal-Enclosed Switchgear
... The Digitrip 520MCV relay includes an Arcflash Reduction Maintenance System™ (ARMS) feature that may be activated at the breaker or from remote. When activated, the ARMS feature lowers the available arc flash energy at the connected downstream device by faster clearing of the downstream fault The Di ...
... The Digitrip 520MCV relay includes an Arcflash Reduction Maintenance System™ (ARMS) feature that may be activated at the breaker or from remote. When activated, the ARMS feature lowers the available arc flash energy at the connected downstream device by faster clearing of the downstream fault The Di ...
EASA Proposed CM-ES-001
... A means of indication should be provided to enable the cabin crew to identify which outlets are in use. If multiple de-powering switches are used in the design, consideration should be given to including a system status indicator at each switch location. This feature would allow cabin crew members t ...
... A means of indication should be provided to enable the cabin crew to identify which outlets are in use. If multiple de-powering switches are used in the design, consideration should be given to including a system status indicator at each switch location. This feature would allow cabin crew members t ...
lesson 1
... THE POWER RATINGS OF TRIMMING POTENTIOMETERS ARE USUALLY MORE THAN ADEQUATE FOR MOST VOLTAGE DIVIDER APPLICATIONS WHERE THE POWER IS DISSIPATED EVENLY OVER THE ENTIRE LENGTH OF THE ELEMENT UNDER ALL CIRCUMSTANCES. KEEP IN MIND, HOWEVER, THAT THE STATED POWER RATING IS FOR THE ENTIRE RESISTANCE ELEME ...
... THE POWER RATINGS OF TRIMMING POTENTIOMETERS ARE USUALLY MORE THAN ADEQUATE FOR MOST VOLTAGE DIVIDER APPLICATIONS WHERE THE POWER IS DISSIPATED EVENLY OVER THE ENTIRE LENGTH OF THE ELEMENT UNDER ALL CIRCUMSTANCES. KEEP IN MIND, HOWEVER, THAT THE STATED POWER RATING IS FOR THE ENTIRE RESISTANCE ELEME ...
Electrical Hazards
... Illumination (Over 600 Volts) • Adequate illumination must be provided for all working spaces around electrical equipment. • The lights and switches must be arranged so that persons making repairs or turning on lights wont contact live ports. ...
... Illumination (Over 600 Volts) • Adequate illumination must be provided for all working spaces around electrical equipment. • The lights and switches must be arranged so that persons making repairs or turning on lights wont contact live ports. ...
Liebert Series 610 UPS Installation Manual - 500-750kVA, 60Hz, Three Phase Single-Module
... This equipment contains several circuits that are energized with high voltage. Only test equipment designed for troubleshooting should be used. This is particularly true for oscilloscopes. Always check with an AC and DC voltmeter to ensure safety before making contact or using tools. Even when the p ...
... This equipment contains several circuits that are energized with high voltage. Only test equipment designed for troubleshooting should be used. This is particularly true for oscilloscopes. Always check with an AC and DC voltmeter to ensure safety before making contact or using tools. Even when the p ...
User Manual
... Working status is divided into 3 kinds: normal working status, faulty status, and termination status. 1. Normal Working Status There are two modes: standby status and running status for this stage. Under this mode, the system is running in normal status. Meanwhile tracking all functioning data to ke ...
... Working status is divided into 3 kinds: normal working status, faulty status, and termination status. 1. Normal Working Status There are two modes: standby status and running status for this stage. Under this mode, the system is running in normal status. Meanwhile tracking all functioning data to ke ...
Metal-layer capacitors in the 65nm CMOS process and the
... would be almost identical under the same RC time constant. For emphasizing the impact of gate leakage issue, only MOM capacitor was composed in the power-rail ESD clamp circuit to observe the gate leakage issue as compared to the thin-oxide MOS capacitor. Thus, two power-rail ESD clamp circuits with ...
... would be almost identical under the same RC time constant. For emphasizing the impact of gate leakage issue, only MOM capacitor was composed in the power-rail ESD clamp circuit to observe the gate leakage issue as compared to the thin-oxide MOS capacitor. Thus, two power-rail ESD clamp circuits with ...
simplest chaotic circuit
... Fig. 6. In this figure, we compare experimental versus theoretical attractors. The top two sets of attractor plots y(t) (iL (t), current through the inductor) versus x(t) (vC (t), voltage across the capacitor). The axes scales for the experimental attractor on the top-left are 0.5 V/division. Hence f ...
... Fig. 6. In this figure, we compare experimental versus theoretical attractors. The top two sets of attractor plots y(t) (iL (t), current through the inductor) versus x(t) (vC (t), voltage across the capacitor). The axes scales for the experimental attractor on the top-left are 0.5 V/division. Hence f ...