• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
RE: 24-inch Wide Cable Rack
RE: 24-inch Wide Cable Rack

... within Central Office lineups of IOF equipment bays. All new equipment bays should be equipped with a fuse panel(s) to provide power to equipment in that bay. In situations where new equipment shelves will be placed in existing bays, which do not have sufficient fusing or fuse panels (except DSX bay ...
GRAFIK Systems CCP Custom Combination Panels SPEC
GRAFIK Systems CCP Custom Combination Panels SPEC

Schneider Electric CSI Specification Template
Schneider Electric CSI Specification Template

Glossary of Terms by TDK-Lambda - TDK
Glossary of Terms by TDK-Lambda - TDK

... ac Line Filter - A circuit placed in the ac line to remove unwanted noise from the ac supply. ac Loss Detector – A power fail detector circuit that monitors the status of the ac lines. ANSI – Abbreviation for American National Standards Institute. ATE – Abbreviation for Automatic Test Equipment. AWG ...
Captain`s Cabin - Yankee Clipper Contest Club
Captain`s Cabin - Yankee Clipper Contest Club

... also internally tied to the transistor case. A piece of heavy red wire extends from one of the collector terminals to the PCB. This wire may be attached to a center terminal and bar on the socket. This bar also forms the nuts for the screws. The bases are connected together with a section of light d ...
Aalborg Universitet Controlled Single Phase Islanded Microgrids
Aalborg Universitet Controlled Single Phase Islanded Microgrids

... not affected by these mismatches as long as the frequency of the microgrid is not affected. The frequency of the microgrid remains constant throughout the whole microgrid once steady state conditions are achieved provided that the local load demand does not exceed the maximum apparent power rating o ...
standard power products
standard power products

Model test (sem-II)
Model test (sem-II)

... A. directly proportional to the back emf and inversely proportional to the flux B. inversely proportional to the back emf and directly proportional to the flux C. directly proportional to the back emf as well as to the flux D. inversely proportional to the back emf as well as to the flux. ...
SECTION-4-Chapter_10_Rev1a
SECTION-4-Chapter_10_Rev1a

... The thermal time constant of a capacitor has been defined as the time it takes for the capacitor core temperature to reach 65% of its final value in response to a step change in ambient temperature. Harmonic variations which are slower than the thermal time constant of a capacitor will cause signif ...
BORRI 7000
BORRI 7000

... Small Footprint and Long Autonomy Time The Borri 7000 is carried out with a new concept in UPS design and ergonomics. Using a high frequency technology, it is extremely compact with the smaller footprint reducing significantly the needed floor space, even though it hosts internal batteries for long ...
Dc Motor Power Control
Dc Motor Power Control

RF3930D 10W GaN ON S C POWER AMPLIFIER DIE Features
RF3930D 10W GaN ON S C POWER AMPLIFIER DIE Features

... The physical structure of the GaN HEMT results in three terminal capacitors similar to other FET technologies. These capacitances exist across all three terminals of the device. The physical manufactured characteristics of the device determine the value of the CDS (drain to source), CGS (gate to sou ...
SECTION-4-Chapter 10
SECTION-4-Chapter 10

... The thermal time constant of a capacitor has been defined as the time it takes for the capacitor core temperature to reach 65% of its final value in response to a step change in ambient temperature. Harmonic variations which are slower than the thermal time constant of a capacitor will cause signif ...
DNV Standard for Certification 2.25 Electrical Shore Connections
DNV Standard for Certification 2.25 Electrical Shore Connections

... While the electric shore connection is supplying power to the vessel, at least one of the vessel’s generators shall be in standby. I.e. this generator shall be automatically started and connected to the main switchboards in case of blackout (loss of power supply from shore). ...
Time-Varying and Probabilistic Considerations: Setting Limits
Time-Varying and Probabilistic Considerations: Setting Limits

... The thermal time constant of a capacitor has been defined as the time it takes for the capacitor core temperature to reach 65% of its final value in response to a step change in ambient temperature. Harmonic variations which are slower than the thermal time constant of a capacitor will cause signif ...
TABLE OF CONTENTS
TABLE OF CONTENTS

... popular cartridges. All of the adjustments can be made through the access panel on the top of the unit. While the number of switches may at first appear daunting, setting up the Ares is actually quite simple. Figure 4 shows the different switches for setting up the Ares. There are three different ga ...
Understanding Induction Motor Nameplate Information
Understanding Induction Motor Nameplate Information

... average of all units tested is shown as the nominal nameplate value. Guaranteed minimum is another efficiency that's sometimes noted on a nameplate. This value is determined from a mathematical relationship that assumes that the worst efficiency of any motor in the batch — used to determine the aver ...
Module 2 : Transmission Lines Lecture 13 : Application of
Module 2 : Transmission Lines Lecture 13 : Application of

... What is the resonant section of a transmission line? Frequency response of a resonant section of a line. Input impedance of a resonant section of a line. Voltage and current on a resonant section of a line. ...
9.1 Bonding And Grounding
9.1 Bonding And Grounding

...  Induced voltages from high voltage in close proximity, static and lightning  Any electrical device can become faulty and produce ...
Background and Principles for the System Security Forecast
Background and Principles for the System Security Forecast

... Upper South Island) where three year demand forecasts are used. These sections are more detailed than the sections using a 10 year forecast and describe in detail the power system issues requiring operational management over the next three years and generic contingency plans. It is proposed that the ...
Introduction to Sensors - Universal Lighting Technologies
Introduction to Sensors - Universal Lighting Technologies

... Control Signal ...
Data Sheet - Energy Recovery Products
Data Sheet - Energy Recovery Products

... ERP - Energy Recovery Products (ERP Power, LLC) - reserves the right to make changes without further noNce to any products herein. ERP makes no warranty, representaNon or guarantee regarding the suitability of its products for any parNcular purpose, nor does ERP assume any liability arising out of ...
report
report

AP6503 Description Pin Assignments
AP6503 Description Pin Assignments

... Document number: DS35077 Rev. 5 - 2 ...
Wiring A Tortoise Switch Machine for the Mainline
Wiring A Tortoise Switch Machine for the Mainline

... Similarly, I would not install the LED into the fascia until instructed in paragraph 3.9 (or else be prepared to swap wires here too) Lastly, be prepared to swap the feed wires that power the frog. ...
< 1 ... 328 329 330 331 332 333 334 335 336 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2026
  • DMCA
  • Privacy
  • Terms
  • Report