• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
CP2101 - Sparkfun
CP2101 - Sparkfun

Chapter 4: Physical Installation
Chapter 4: Physical Installation

... same wiring and the same trigger board as the existing NWL controller. If you are replacing a controller from another supplier, read all three sections and carefully follow all instructions. This will help assure a smooth installation and fast startup. If you are familiar with simple mechanical and ...
Extra Material Part 3 - University of Waterloo
Extra Material Part 3 - University of Waterloo

H8436V Install - Veris Industries
H8436V Install - Veris Industries

... • NEVER short the secondary of a potential transformer. • Before performing Dielectric (Hi-Pot) or Megger testing on any equipment in which the power meter is installed, disconnect all input and output wires to the power meter. High voltage testing may damage electronic components contained in t ...
BD35390FJ
BD35390FJ

... damaging the IC. Avoid nearby pins being shorted to each other especially to ground, power supply and output pin. Inter-pin shorts could be due to many reasons such as metal particles, water droplets (in very humid environment) and unintentional solder bridge deposited in between pins during assembl ...
HEWITT PYROMETERS Installation Instructions
HEWITT PYROMETERS Installation Instructions

... Installation Instructions ...
BD9329AEFJ
BD9329AEFJ

... (1) The thermal Pad on the back side of the IC offers great thermal conduction to the chip. So, using the GND plain on the PCB as broad and wide as possible can help thermal dissipation. And a lot of thermal via for helping the spread of heat to the different layers is also effective. (2) The input ...
TPS2838 数据资料 dataSheet 下载
TPS2838 数据资料 dataSheet 下载

Stakeholder Comparison Comment Rationale Matrix 2012-09-06 AESO AUTHORITATIVE DOCUMENT PROCESS
Stakeholder Comparison Comment Rationale Matrix 2012-09-06 AESO AUTHORITATIVE DOCUMENT PROCESS

... AESO Replies ...
STUDY OF UPQC FOR POWER QUALITY IMPROVEMENT MIHIR
STUDY OF UPQC FOR POWER QUALITY IMPROVEMENT MIHIR

... voltage harmonics present in the utility voltage. In [24] the authors present the steady state analysis of unified power quality conditioner (UPQC). The mathematical analysis is based on active and reactive power flow through the shunt and series APF, wherein series APF can absorb or deliver the act ...
SEMITOP 3 Power Board
SEMITOP 3 Power Board

... Application Note was written for TRIAC, the isolation constraints still apply for fast switching semiconductor devices such as IGBTs.) ...
DS-100C I-V CURVE TRACER User Manual
DS-100C I-V CURVE TRACER User Manual

... has been on for more than 15 minutes without taking a curve it will power down and you will receive an error indicating that the DS-Tracer does not respond. Simply turn the DS-Tracer switch off, wait several seconds, and turn it back on. Allow the tracer approximately 10 seconds to initialize. Then ...
Power converter optimal control for wind energy conversion systems
Power converter optimal control for wind energy conversion systems

... the operating point of the generator changes constantly. The LPV-based control system is capable of adapting dynamically the controller to the operating point of the system, in this way, the response defined during the design process is always obtained. Using this technique, the system stability ove ...
- Free Documents
- Free Documents

... A supply regulating from . Threeterminal mode has the control pin connected to the power input pin which gives a limitation of . the loop gain is unchanged by changing the output voltage or bypassing. fb . This allows for a . For the LT. Use of a true current source allows all the gain in the buffe ...
Research Article A Binary Weighted 7
Research Article A Binary Weighted 7

... Department of Electrical, Electronics and Communication Engineering, American University of Ras Al Khaimah, United Arab Emirates Abstract: In domestic and industrial applications, the automatic AC voltage regulator is an important device especially during AC voltage fluctuations. Multi tap transform ...
01-08-07, TJ18, TJ22, TJ42, TJ80 , TJF42 Refrigerator
01-08-07, TJ18, TJ22, TJ42, TJ80 , TJF42 Refrigerator

... Important: Before connecting the refrigerator to the 12 VDC power supply, check that the line voltage corresponds to the indications on the refrigerator rating plate and those of the compressor plate. ...
Partial Shading Detection and Smooth Maximum Power Point
Partial Shading Detection and Smooth Maximum Power Point

... . It limits the search area for GMPP as in [11], and yields suitable results; but needs high sampling number. Reference [12] proposes two methods: the first approach samples the P-V curve and limits the search area based on short circuit current of the modules and the highest local power. As it is m ...
Leakage Power Analysis and Comparison of Deep Submicron Logic
Leakage Power Analysis and Comparison of Deep Submicron Logic

Catalog - All Pages | Nexxus Lighting
Catalog - All Pages | Nexxus Lighting

... to have instant access to pre-assigned scenes, each scene having a limit of 1000 different steps.In addition to the eight assigned scenes, there are 247 other scenes available for playback. These then are accessible through the next/ previous buttons, or can be set to run sequentially with an accura ...
Validation of the Measurement Characteristics in an Instrument for
Validation of the Measurement Characteristics in an Instrument for

... Its aim, among others, is to follow the energy use throughout the industrial processes, in order to improve the efficiency of energy producing. Many ecological and environmental impacts are the side products of electrical power generation, delivery, and consumer systems [1]. The electrical power sys ...
Aalborg Universitet Converters
Aalborg Universitet Converters

... DC Link Current Stress in Voltage Source Converters. In Proceedings of IEEE International Conference on Power Electronics, Drives and Energy Systems, PEDES 2014. IEEE Press. DOI: 10.1109/PEDES.2014.7041953 ...
Design - University of Portland
Design - University of Portland

SPP07N60S5 SPI07N60S5 Cool MOS™ Power Transistor
SPP07N60S5 SPI07N60S5 Cool MOS™ Power Transistor

... For further information on technology, delivery terms and conditions and prices please contact your nearest Infineon Technologies Office in Germany or our Infineon Technologies Reprensatives worldwide ( ...
A Novel Approach to Vibration Isolation in Small
A Novel Approach to Vibration Isolation in Small

... high-frequency vibration imparted onto electrical accelerometers from a quad-propeller system. As demonstrated in a TV commercial, a mattress-sized piece of the foam could negate low frequency vibrations, but would it significantly reduce higher frequencies used in RC helicopters? A quad-propeller s ...
Transformer modeling basics
Transformer modeling basics

< 1 ... 214 215 216 217 218 219 220 221 222 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2026
  • DMCA
  • Privacy
  • Terms
  • Report