• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
SKY77163-12 数据资料DataSheet下载
SKY77163-12 数据资料DataSheet下载

Decrease Total System Costs with Industry`s Lowest Cost
Decrease Total System Costs with Industry`s Lowest Cost

BU3087FV
BU3087FV

Development Steps of the RF
Development Steps of the RF

... A RIT as designed and qualified for Artemis was equipped with a grid system optimised for maximum thrust level. The grid design was driven by the results of the study of the ESA-XX thruster (26 cm, 200 mN thrust level, Isp = 4500 s) and computer codes which allow the calculation of the ion trajector ...
MAX15023 Wide 4.5V to 28V Input, Dual-Output Synchronous Buck Controller General Description
MAX15023 Wide 4.5V to 28V Input, Dual-Output Synchronous Buck Controller General Description

... MAX15023 includes two independent power-good outputs and two independent enable inputs with precise turn-on/turn-off thresholds, which can be used for supply monitoring and for power sequencing. Additional protection features include cycle-by-cycle, low-side, sink peak current limit, and thermal shu ...
IEEE Std 519™-2014, IEEE Recommended Practice and
IEEE Std 519™-2014, IEEE Recommended Practice and

... This introduction is not part of IEEE Std 519-2014, IEEE Recommended Practice and Requirements for Harmonic Control in Electric Power Systems. ...
R-EF-11: Stray Voltage Problems with Dairy Cows
R-EF-11: Stray Voltage Problems with Dairy Cows

SIM808 Hardware Design
SIM808 Hardware Design

Driver/Receiver MC145406
Driver/Receiver MC145406

Brushless DC Motor Unit - User`s Guide
Brushless DC Motor Unit - User`s Guide

- Legrand
- Legrand

magnetizing current effect minimization in current transformers
magnetizing current effect minimization in current transformers

... Measuring power in the system has always been a difficulty to carry out. To achieve credible of power measurement results a precise current measurement has to be performed. Current measurement realized using current transformers requires actual current transformation. The measurements carried out in ...
Switch-on-to-Fault Schemes in the Context of Line Relay Loadability
Switch-on-to-Fault Schemes in the Context of Line Relay Loadability

... tripping provided that the current fault detector is set above line charging current as well as any tapped load current, including transformer magnetizing inrush current. A short time-delay in the current fault detector input would increase security by allowing the line voltage detector time to bloc ...
Design Considerations for Electrical Fast Transient (EFT)
Design Considerations for Electrical Fast Transient (EFT)

... otherwise), redesign or rework is required. This significantly increases the cost of design. These costs are in addition to delayed timelines, customer dissatisfaction, and loss of market share. Therefore, it is vital for the design engineer to start a regime of mitigation immediately in parallel wi ...
J. Lu, D.J. Perreault, D. Otten, and K.K. Afridi, “Impedance Control Network Resonant Converter for Wide-Range High-Efficiency Operation,” IEEE Transactions on Power Electronics , (to appear).
J. Lu, D.J. Perreault, D. Otten, and K.K. Afridi, “Impedance Control Network Resonant Converter for Wide-Range High-Efficiency Operation,” IEEE Transactions on Power Electronics , (to appear).

... switching frequency [1], [2]. Because of the inductive loading requirements to achieve ZVS switching, power is reduced in such converters by increasing switching frequency, exacerbating switching loss. Wide frequency operation also makes design of magnetic components and EMI filters more challenging ...
ups howto - The Linux Documentation Project
ups howto - The Linux Documentation Project

... intended for safety or life−critical equipment. These devices should be considered to be pieces of consumer electronics. As such, the number−one basis on which most of these devices compete with each other is on price, not quality. Cost−effectiveness is more important to UPS vendors (because it appe ...
Maxim Integrated MAX14870 DC motor driver datasheet
Maxim Integrated MAX14870 DC motor driver datasheet

Trio preamp integrated Owner`s manual.indd
Trio preamp integrated Owner`s manual.indd

SIMATIC S7-200 SMART
SIMATIC S7-200 SMART

... technologies, Siemens has been instrumental in enhancing our customers’ competitiveness for over 140 years. Our state-of-the art automation products and solutions not only improve production efficiency but also reduce total cost of ownership. One such innovation from the house of Siemens is the SIMA ...
Series E70 Speakers and Speaker Strobes
Series E70 Speakers and Speaker Strobes

... All speakers shall be designed for a field selectable input of either 25 or 70 VRMS, with selectable power taps from 1/8 watt to 2 watts. All models shall have listed sound output of up to 87 dB at 10 feet and a listed frequency response of 400 to 4000 Hz. The speaker shall also incorporate a sealed ...
External Reactive Power Compensation of Permanent Magnet
External Reactive Power Compensation of Permanent Magnet

... rotor blades, and it had a capacity of 12 kilowatts. Later, in the year 1891, Danish inventor Poul La Cour discovered that faster rotating wind turbines with fewer rotor blades generate more electricity than slow moving turbines with many rotor blades. Using this knowledge, he developed the first wi ...
An Interleaved Totem-Pole Power Factor Correction
An Interleaved Totem-Pole Power Factor Correction

... During this period, body-diodes of the negativephase group act as the catch diode. In this phase, return current is delivered by D2 . The converter operation during this stage is illustrated by Fig. 5(a) When Vi is in its negative phase, the opposite condition occurs. Through out this time, negative ...
New Open LED Shunt Protection (LSP) Devices
New Open LED Shunt Protection (LSP) Devices

... such as streetlights, parking lots and garages, high-bay factory, commercial, and arena lighting all realize the longevity and reliability benefits ...
UM0509
UM0509

... The kit also integrates an on-board optical insulated serial line allowing isolation of the board ground reference in order to avoid propagation of overvoltage on the PC side. Moreover, the on-board charge pump allows burning the STPM01 energy meter ASSP device registers. Access to the STPM01 device ...
Wireless Communications and Networks
Wireless Communications and Networks

< 1 ... 115 116 117 118 119 120 121 122 123 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2026
  • DMCA
  • Privacy
  • Terms
  • Report