Download Event Reporting Form Template

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
Event Reporting Form Template
Use this form to report events. Submit the completed form to the AESO via email to:
(a) [email protected] for all events, except those events described under (b) below; or
(b) [email protected] for:
(i) damage or destruction that results from actual or suspected intentional human action;
(ii) physical threats which have the potential to degrade normal operation of a control centre; or
(i) a suspicious device or activity.
1
2
3
4
Task
Entity filing the report include:
Company name:
Name of contact person:
Email address of contact person:
Telephone Number:
Submitted by (name):
Date and Time of recognized event.
Date: (mm/dd/yyyy)
Time: (hh:mm)
Time/Zone:
Did the event originate in your system?
Comments
Yes ☐
No ☐ Unknown ☐
Event Identification and Description
(Check applicable box)
Written description (optional):
☐ Damage or destruction of a facility
☐ Physical threat to a facility
☐ Physical threat to a control center
☐ System-wide voltage reduction
☐ Manual firm load shedding
☐ Automatic firm load shedding
☐ Voltage deviation on a facility
☐ Loss of firm load
☐ System separation
☐ Generation loss
☐ Transmission loss
☐ Unplanned control center evacuation
☐ Complete loss of voice communication
capability
☐Complete loss of monitoring capability
☐Remedial action scheme misoperation
☐Protection system misoperation
Page 1
Public
Related documents
April 30, 2008
April 30, 2008
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Alberta Reliability Standards Compliance Monitoring Program Applicability Assessment Request Form
Alberta Reliability Standards Compliance Monitoring Program Applicability Assessment Request Form
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Shunt Compensators
Shunt Compensators
Stakeholder Comment and Reply Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS
Stakeholder Comment and Reply Matrix AESO AUTHORITATIVE DOCUMENT PROCESS
Need for the Hughenden 213S Substation Upgrade in the Hughenden area
Need for the Hughenden 213S Substation Upgrade in the Hughenden area
1.  Recommendations  Consultation on Phase 2 Wind Integration Recommendation Paper
1. Recommendations Consultation on Phase 2 Wind Integration Recommendation Paper
AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)
AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)
Stakeholder Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
ch 16 Electricity Essential Questions
ch 16 Electricity Essential Questions
Stakeholder Comment and AESO Replies Matrix
Stakeholder Comment and AESO Replies Matrix
Stakeholder Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
July 19, 2012 Dear Market Participants and Interested Parties Re:
July 19, 2012 Dear Market Participants and Interested Parties Re:
Stakeholder Comment and AESO Replies Matrix
Stakeholder Comment and AESO Replies Matrix
Stakeholder Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Market Participant Comment and Replies Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS
Market Participant Comment and Replies Matrix AESO AUTHORITATIVE DOCUMENT PROCESS
Resistance and Voltage Worksheet
Resistance and Voltage Worksheet
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft