Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
SUBHENDU KUMAR SAHOO Present Adress-Fl/G2,PL.NO/34,2nd STREET SINGERAVELAN COLONY, PALLAVAN NAGAR,MADURAVOYAL,CHENNAI Permanent Adress-s/o:Sarat Chandra Sahoo,At/khannagar(Nuasahi) Post :Arundaya Market,Cuttack,Orissa Contact: +91-8056045672, +91-9025807649; D.O.B.: 19th Sept. 1985 E-mail: [email protected]; [email protected] Seeking challenging senior level assignments in the field of project engineering & management/Process engineering with MNCs / reputed companies in infra projects (Building Interior,water supply and sewerage, roads and buildings) PROFILE Competent & result-oriented professional, with 2.9 years experience in Project Engineering and Management, Process Engineering Services, Maintenance & Operations, Safety Management and Training Results oriented with industrial experience and expertise in process/project management and proficiency in providing assistance to design and execution Adept at designing & execution of work at site of sewer pipe lines and water supply projects, quality check for pipe & constructions materials; handled the project of rehabilitation and strengthening of underground drainage system, construction of roads & buildings in different states of India. Extensive experience in safety management, predictive, planned and preventive management and evolving quick breakdown solutions to minimize downtime Core Competencies: Project / Resource Management ♦ Strategic Planning ♦ Operation / Maintenance ♦ Quality Control / Compliance ♦ Cross Functional Coordination ♦ Preparation of Reports ♦ Training/ Development ♦ Liaison/Networking ♦ Quality ♦ Cost Reduction ♦ Start-up, shut down Emergency ♦ Pre-commissioning & Commissioning ♦ Data Analysis ♦ Problem Solving ♦ Safety Measures ♦ Production Targets ♦ Budgeted ♦ Training and counseling ♦ Process Plant Operations ♦ EXPERIENCE & PROFESSIONAL DEVELOPMENT 1. KCR INFRA PROJECTS PVT. LTD ASSISTANT Project Manager (Project Execution) (May 2010 till date) Project Name: U.G.D work Of CMWSSB OF Madhuravoyal Package-I : U.G.D work of HMWSSB of package-I : Bihar rural roads works Roles and responsibility: Accountable for work on a sewerage project in Chennai , a housing project in Andra Pradesh, a PRMGSY FUNDED Road Project in bihar. Attending review meetings with Director Projects, Superintendent Engineers & Executive Engineers of Concerned Department; review meetings with Company’s M.D., Executive Director, Project Head. Conducting weekly meeting with contractors and Departmental Officers regarding work progress; planning weekly meetings with the planning department regarding project execution. Accountable for complete monitoring in execution of madhurvoyal sewer project in Chennai, roads project in Bihar, residential building project in raichoti Andra Pradesh. Accountable for preparation of Techno-commercial feasibility report of project. Handle Process improvement projects like optimization of plant capacity by de bottlenecking of process steps, small expansion projects and trouble shooting. Vital contributor in operational and maintenance activities to reduce downtime and optimize operational efficiency . Spearheading system development to achieve world class standards in equipment reliability. Responsible for management of Maintenance Budgeting, Maintenance Planning (schedules, spares, manpower, time), Down time analysis / root cause analysis, Reliability centered maintenance Spearheading Material management, Indenting, Inventory control, Standardization & Waste control measures thereby achieving productivity enhancement. Effectively planning and managing various operations. Provided motivational leadership to the team. Guided the team and achieved overall profitability & productivity 2. PBS CONSULTANCY SERVICES Project Engineer (MAR09-APRIL10) Project Name: Rehabilitation and strengthening of existing U.G.D in old city of Hyderabad Roles and responsibility: Accountable for handling and preparation of DPRs (detailed project reports), PMC (project management consultancy) & third party quality control in environmental works. Responsible for designing & execution of work at site of sewer pipe lines and water supply projects; handling quality check for pipe & constructions materials. Deftly handle project management, project planning, execution and preventive, predictive and breakdown solutions. Attending review meetings with Director Projects, Superintendent Engineers & Executive Engineers of Concerned Department; review meetings with Company’s M.D., Executive Director, Project Head & Project Manager. Responsible to preparing daily, weekly, monthly and quarterly progress reports, collect data for the DPRs of different types of sewer projects,roads,residential buildings. Attending pre-bid meetings for various types of environmental Projects in various states of India for preparation of DPRs. Accountable for complete monitoring in execution of Zone II U.G.D project Checking bills of client contractors and complete controlling in execution of work. Attending work related difficulties in site and preparing working longitudinal sections for the client. 3. DEPA INDIA PVT LTD GRADUATE ENGINEERING TRAINEE (AUG08-FEB09) Project Name: LEELA KEMPENSKY GURGAON Roles and responsibility: SUPERVISING THE INTERIOR FITOUTS WORK ASSISTING THE INTERIOR WORK OF WALL CLADDING,FLOORING AND DECORATIVE FALSE CEILING. ASSISTING TO THE SR. ENGINEER, SR.PROJECT ENGINEER AND PROJECT MANAGER REGARDING WORK EXECUTION AND WORK STATUS. FOCUSSING ON THE WORK PROGRESS AND TIMELY COMPLETION OF THE PROJECT WITH COORDINATION WITH THE PLANNING ENGINEER. CHECKING THE DRAWINGS AND ASISTING TO THE SUPERVISOR AND SUBCONTRACTOR TO CARRY OUT THE WORK. COORDINATING WITH THE SKILLED AND UNSKILLED LABOURS TO CARRY OUT THE MAXIMUM OUTPUT FROM THE WORK. DETAILED STUDY OF THE DRAWING TO CARRY OUT THE WORK WITH INVESTMENT WITH MAXIMUM OUTPUT. COORDINATING WITH THE CLIENT ENGINEERS TO CARRY OUT THE WORK SMOOTHLY. ASSITING TO THE BILLING ENGINEER TO CARRY OUT THE BILLING WORK COORDINATING WITH THE MEP SECTION TO CARRY OUT THE WORK WITHOUT ANY HINDERANCE AND DIFFICULTY. CHECKING THE QUALITY OF WORK AND MATERIAL AT SITE. PREPARING QUAILY CONTROL REPORTS REGARDING MATERIALS. REPOTING TO THE PROJECT MANAGER INDUSTRIAL TRAINING Organization: Subject: Duration: BHUNESWAR DEVELOPMENT AUTHORITY (BDA) water supply system One month (9th May 2006 to 8th June 2006) – 3rd Sem. Training project ACADEMIC PROJECT Project Title: Duration: FIRE RETARDING THATCH ROOF One month EDUCATIONAL AND PROFESSIONAL CREDENTIALS B.Tech. (Civil), 2008 Orissa Engineering College (Biju Pattnaik University of Technology - BPUT); 6.89 CGPA 10+2, 2003 Kendriya Vidyalaya, F.C.I./CBSE; 53% 10th, 2001 Kendriya Vidyalaya, F.C.I./CBSE; 63% Technical Skills: Windows 98/XP, C, C++, MS-Office, Autocad, Primavera, MS-Project, Data Structure CO-CURRICULAR ACCOLADES Best RAMP coordinator Award for the year 2008 in my college. Best player award for the year 2005 and 2008 in my college cricket tournament. Participated in various technical paper presentation and debate. Hobbies: Languages: Interacting with people, making friends, Social service like blood donation etc., Reading News Papers, Business articles and net surfing, Sports (Cricket, Badminton) English, Hindi, Oriya, Telugu