Download CURRICULUM VITAE

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Construction management wikipedia , lookup

PRINCE2 wikipedia , lookup

Transcript
SUBHENDU KUMAR SAHOO
Present Adress-Fl/G2,PL.NO/34,2nd STREET SINGERAVELAN COLONY, PALLAVAN NAGAR,MADURAVOYAL,CHENNAI
Permanent Adress-s/o:Sarat Chandra Sahoo,At/khannagar(Nuasahi) Post :Arundaya Market,Cuttack,Orissa
Contact: +91-8056045672, +91-9025807649; D.O.B.: 19th Sept. 1985
E-mail: [email protected]; [email protected]
Seeking challenging senior level assignments in the field of project engineering & management/Process
engineering with MNCs / reputed companies in infra projects (Building Interior,water supply and sewerage,
roads and buildings)
PROFILE
 Competent & result-oriented professional, with 2.9 years experience in Project Engineering and
Management, Process Engineering Services, Maintenance & Operations, Safety Management and Training
 Results oriented with industrial experience and expertise in process/project management and proficiency
in providing assistance to design and execution
 Adept at designing & execution of work at site of sewer pipe lines and water supply projects, quality check
for pipe & constructions materials; handled the project of rehabilitation and strengthening of underground
drainage system, construction of roads & buildings in different states of India.
 Extensive experience in safety management, predictive, planned and preventive management and evolving
quick breakdown solutions to minimize downtime
Core Competencies:
Project / Resource Management ♦ Strategic Planning ♦ Operation / Maintenance ♦ Quality Control / Compliance
♦ Cross Functional Coordination ♦ Preparation of Reports ♦ Training/ Development ♦ Liaison/Networking ♦
Quality ♦ Cost Reduction ♦ Start-up, shut down Emergency ♦ Pre-commissioning & Commissioning ♦ Data
Analysis ♦ Problem Solving ♦ Safety Measures ♦ Production Targets ♦ Budgeted ♦ Training and counseling ♦
Process Plant Operations ♦
EXPERIENCE & PROFESSIONAL DEVELOPMENT
1. KCR INFRA PROJECTS PVT. LTD
ASSISTANT Project Manager (Project Execution) (May 2010 till date)
Project Name: U.G.D work Of CMWSSB OF Madhuravoyal Package-I
: U.G.D work of HMWSSB of package-I
: Bihar rural roads works
Roles and responsibility:
 Accountable for work on a sewerage project in Chennai , a housing project in Andra Pradesh, a PRMGSY
FUNDED Road Project in bihar.
 Attending review meetings with Director Projects, Superintendent Engineers & Executive Engineers of
Concerned Department; review meetings with Company’s M.D., Executive Director, Project Head.
 Conducting weekly meeting with contractors and Departmental Officers regarding work progress; planning
weekly meetings with the planning department regarding project execution.
 Accountable for complete monitoring in execution of madhurvoyal sewer project in Chennai, roads project
in Bihar, residential building project in raichoti Andra Pradesh.
 Accountable for preparation of Techno-commercial feasibility report of project.
 Handle Process improvement projects like optimization of plant capacity by de bottlenecking of process
steps, small expansion projects and trouble shooting.
 Vital contributor in operational and maintenance activities to reduce downtime and optimize operational
efficiency
.
 Spearheading system development to achieve world class standards in equipment reliability. Responsible for
management of Maintenance Budgeting, Maintenance Planning (schedules, spares, manpower, time), Down
time analysis / root cause analysis, Reliability centered maintenance
 Spearheading Material management, Indenting, Inventory control, Standardization & Waste control measures
thereby achieving productivity enhancement.
 Effectively planning and managing various operations.
 Provided motivational leadership to the team. Guided the team and achieved overall profitability &
productivity
2. PBS CONSULTANCY SERVICES
Project Engineer (MAR09-APRIL10)
Project Name: Rehabilitation and strengthening of existing U.G.D in old city of
Hyderabad
Roles and responsibility:
 Accountable for handling and preparation of DPRs (detailed project reports), PMC (project management
consultancy) & third party quality control in environmental works.
 Responsible for designing & execution of work at site of sewer pipe lines and water supply projects; handling
quality check for pipe & constructions materials.
 Deftly handle project management, project planning, execution and preventive, predictive and breakdown
solutions.
 Attending review meetings with Director Projects, Superintendent Engineers & Executive Engineers of
Concerned Department; review meetings with Company’s M.D., Executive Director, Project Head & Project
Manager.
 Responsible to preparing daily, weekly, monthly and quarterly progress reports, collect data for the DPRs of
different types of sewer projects,roads,residential buildings.
 Attending pre-bid meetings for various types of environmental Projects in various states of India for
preparation of DPRs.
 Accountable for complete monitoring in execution of Zone II U.G.D project
 Checking bills of client contractors and complete controlling in execution of work.
 Attending work related difficulties in site and preparing working longitudinal sections for the client.
3. DEPA INDIA PVT LTD
GRADUATE ENGINEERING TRAINEE (AUG08-FEB09)
Project Name: LEELA KEMPENSKY GURGAON
Roles and responsibility:
 SUPERVISING THE INTERIOR FITOUTS WORK
 ASSISTING THE INTERIOR WORK OF WALL CLADDING,FLOORING AND DECORATIVE FALSE CEILING.
 ASSISTING TO THE SR. ENGINEER, SR.PROJECT ENGINEER AND PROJECT MANAGER REGARDING WORK
EXECUTION AND WORK STATUS.
 FOCUSSING ON THE WORK PROGRESS AND TIMELY COMPLETION OF THE PROJECT WITH COORDINATION WITH
THE PLANNING ENGINEER.
 CHECKING THE DRAWINGS AND ASISTING TO THE SUPERVISOR AND SUBCONTRACTOR TO CARRY OUT THE
WORK.
 COORDINATING WITH THE SKILLED AND UNSKILLED LABOURS TO CARRY OUT THE MAXIMUM OUTPUT FROM
THE WORK.
 DETAILED STUDY OF THE DRAWING TO CARRY OUT THE WORK WITH INVESTMENT WITH MAXIMUM OUTPUT.
 COORDINATING WITH THE CLIENT ENGINEERS TO CARRY OUT THE WORK SMOOTHLY.
 ASSITING TO THE BILLING ENGINEER TO CARRY OUT THE BILLING WORK
 COORDINATING WITH THE MEP SECTION TO CARRY OUT THE WORK WITHOUT ANY HINDERANCE AND
DIFFICULTY.
 CHECKING THE QUALITY OF WORK AND MATERIAL AT SITE.
 PREPARING QUAILY CONTROL REPORTS REGARDING MATERIALS.
 REPOTING TO THE PROJECT MANAGER
INDUSTRIAL TRAINING
Organization:
Subject:
Duration:
BHUNESWAR DEVELOPMENT AUTHORITY (BDA)
water supply system
One month (9th May 2006 to 8th June 2006) – 3rd Sem. Training project
ACADEMIC PROJECT
Project Title:
Duration:
FIRE RETARDING THATCH ROOF
One month
EDUCATIONAL AND PROFESSIONAL CREDENTIALS
B.Tech. (Civil), 2008
Orissa Engineering College (Biju Pattnaik University of Technology - BPUT); 6.89 CGPA
10+2, 2003
Kendriya Vidyalaya, F.C.I./CBSE; 53%
10th, 2001
Kendriya Vidyalaya, F.C.I./CBSE; 63%
Technical Skills:
Windows 98/XP, C, C++, MS-Office, Autocad, Primavera, MS-Project, Data Structure
CO-CURRICULAR ACCOLADES
 Best RAMP coordinator Award for the year 2008 in my college.
 Best player award for the year 2005 and 2008 in my college cricket tournament.
 Participated in various technical paper presentation and debate.
Hobbies:
Languages:
Interacting with people, making friends, Social service like blood donation etc., Reading News
Papers, Business articles and net surfing, Sports (Cricket, Badminton)
English, Hindi, Oriya, Telugu