Transcript
Design & Layout of Foodservice
Facilities
Chapter 6
Chapter 6 Overview
This Chapter:
 Describes the basis for selecting
foodservice equipment
 Outlines the standards of workmanship and
common materials for constructing foodservice equipment
 Provides an overview of the equipment
specifications as they would appear in a set
of contract documents.
Reasons for Equipment Purchase






The equipment is a part of a new food facility.
Existing equipment needs to be replaced.
Changes in the menu or variations in volume of
business require an addition to the food facility.
The equipment will reduce labor costs.
The equipment will reduce maintenance costs.
The equipment will produce savings in energy.
Total Cost of Ownership
 The
initial purchase price
 The cost of installing the equipment
 The direct costs of operation
 The cost of maintenance and repair
 The labor costs required to operate the
equipment
 The useful life of the equipment
Initial Purchase Price



Initial purchase price is important, but the lowest
price item may not have the lowest total cost of
ownership
Equipment is manufactured for a wide variety of
facilities; Owners need to know what is right for
them
Equipment Manufacturers and Dealers have a
financial incentive to sell their products against
competitors; One way to do that is to propose a
cheaper item – even if it isn’t necessarily the best
alternative for the operation
Installation Cost - Examples




Adding a char broiler could require expensive
modifications to a ventilation system or even a new
hood.
Adding a steam-jacketed kettle could require
cutting into the floor to install a trench drain.
Adding an steamer with an electric steam generator
could require additional power circuits.
Replacing a hood could require additional ductwork
running from the kitchen to the roof.
Direct Operating Costs
 Gas
 Electricity
 Water
 Steam
 Additives,
machines
such as rinsing agents for dish
Maintenance & Repair
Examples
 “De-liming” steamers and servicing steam
boilers
 Adjusting oven thermostats
 Replacing door seals on reach-ins
 Replacement of moving parts and bearing
surfaces
 Replacement of heating elements and
burners
Labor Costs of Operation




Replacing a manual slicer with an automatic slicer
will reduce labor requirements
Replacing a manual pot washing system with a
power soak and wash system will reduce labor
requirements
Replacing a bussing system that relies on racks
with a conveyor will reduce labor costs
Remember that actual labor savings are not
realized until fewer labor hours are scheduled!
Useful Life of Equipment
Useful life is hard to
estimate in practice:
Examples (years):
Convection Oven
8-10
Depends on extent of use
Mixer
15-20
Fryer
8-12
Depends on quality of
maintenance and repair
Dish Machine
10-15
Also, comparative estimates
for the same item between
manufacturers are rarely
available and seldom
accurate
The Role of Equipment
Specifications
 Insure
that the products have exactly the
features required by the Owner
 Insure that the equipment is manufactured
or custom fabricated in accordance with
industry standards and governmental
regulations
 Insure that the equipment is installed
properly
Equipment Specifications
PROJECT MANUAL
Equipment
Specifications for
foodservice are part
of the “Project
Manual” (the
complete set of
specifications).
They are found in
Division 11,
Equipment, Section
400
Division 0 Contract Conditions
Division 1 General Requirements
Division 2 Site Work
Division 3 Concrete
Division 4 Masonry
Division 5 Metals
Division 6 Wood & Plastic
Division 7 Thermal and Moisture Protection
Division 8 Doors and Windows
Division 9 Finishes
Division 10 Specialties
Division 11 Equipment
Section 11400 Food Service Equipment
Division 12 Furnishings
Division 13 Special Construction
Division 14 Conveying Systems
Division 15 Mechanical
Division 16 Electrical
Two Types of Equipment Specs
EQUIPMENT
SPECIFICATIONS
MANUFACTURED
EQUIPMENT
FABRICATED
EQUIPMENT
Manufactured Equipment
is selected from
manufacturers’ catalogs
of standard products
Fabricated Equipment is
designed and custom
built for the project
Manufactured Equipment

EQUIPMENT
SPECIFICATIONS


MANUFACTURED
EQUIPMENT





The dimensions of the unit
The quantity of units to be
purchased
The specific utility requirements of
the equipment item
The materials used in the
construction of the equipment
The specific construction
techniques employed
Any relevant performance criteria
The desired features, accessories,
and/or options
The relevant industry, association,
or governmental standards
Fabricated Equipment
EQUIPMENT
SPECIFICATIONS



FABRICATED
EQUIPMENT





The dimensions of the unit
The quantity of units to be
purchased
The specific utility requirements of
the equipment item
The materials used in the
construction of the equipment
The specific construction
techniques employed
Any relevant performance criteria
The desired features, accessories,
and/or options
The relevant industry, association,
or governmental standards
Example of Elevation Drawing for
Fabricated Dish Table (Elevation)
Example of Elevation Drawing for
Fabricated Dish Table (Section)
Construction Materials for
Foodservice Equipment

Stainless steel






Internal structure for
counters, etc.





Decorative surfaces
Functional surfaces (as
in storage shelving
Wood

Carts, racks
Galvanized iron
Plastic

Aluminum


Type 302, 304
Work surfaces,
equipment panels, etc.

Hard Maple for bakers’
tables
Decorative trim
Tile
Glass
Solid Surface
“Plastic” Laminate
Stainless Steel Gauges & Uses
GAUGE
8 and 10
TYPICAL USE
Support elements for heavy equipment or at stress points
12
Heavily used tabletops, pot sinks, or other surfaces that will
receive a great amount of wear
14
Tabletops, sinks, overshelves, and brackets that will receive
frequent use or that will carry heavy weights
16
Equipment tops and sides that are small and that will carry
little weight; shelves under equipment and heavily used
side panels
18
Side panels that are not exposed to wear, equipment doors,
hoods, and partitions
20
Covers for supported or insulated panels, such as
refrigerators or insulated doors
Solid Surface Material as Countertop;
Wood as Counter Facing
Section 11400 – Three Parts
Section 11400
Part 1 - General
Part 2 - Products
Part 3 - Execution
Section 11400 Part 1 - General




Refers the bidder to other parts of the contract documents
that are necessary for understanding all of the project
requirements.
Describes the specific responsibilities of the foodservice
equipment contractor, as well as the electricians, plumbers,
and other tradespeople, in connecting the equipment.
Indicates who will provide the hardware necessary for
plumbing connections – the plumber or the foodservice
equipment contractor.
Discusses how the foodservice equipment contractor is to
deal with removal, storage, repair, and reinstallation of
existing equipment that is to be used in the new or renovated
facility.
Section 11400 Part 1 - General






Establishes the requirements for submittals
Instructs the foodservice equipment contractor how to handle
deviations from the requirements of the contract documents.
Sets standards designed to insure a quality installation.
Sets standards for the manufacture and installation of the
foodservice equipment.
Provides information to the foodservice equipment contractor
regarding storage, delivery, and handling of the foodservice
equipment.
Requires the foodservice equipment contractor to check that
the utility services are appropriate before actually installing
the equipment.
Section 11400 Part 2 - Products






Sets standards for the composition and quality of the stainless
steel used in manufactured and fabricated equipment.
Sets standards are set for other raw materials used in the
construction of foodservice equipment.
Describes the requirements for the components to be used in
the foodservice equipment, including plumbing (faucets,
drains) and electrical components (junction boxes,
receptacles).
Sets standards for workmanship in stainless steel fabrication,
such as how joints are to be made and the quality of the arcwelding.
Sets standards for the fabrication and installation of stainless
steel sinks, drainboards, utensil drawers, work surfaces (table
tops), legs, shelving, and other fabricated items.
Sets standards for architectural millwork, including the grade
and type of materials and specific construction techniques.
Section 11400 Part 3 - Execution





Establishes the requirements and describes the procedures
for ensuring the quality of the installation of the equipment in
the field, including inspection – —and rejection if necessary –
—of the work of the foodservice equipment contractor.
Requires the foodservice equipment contractor to set up and
test each item of equipment, adjust it as necessary, and
replace equipment that is not functioning to specifications.
Requires the foodservice equipment contractor to clean and
sanitize the equipment prior to turning it over to the owner.
Requires the foodservice equipment contractor to
demonstrate the use of the equipment and clearly instruct the
Owner in proper maintenance procedures.
Sets the requirements for product guarantees and warranties.
Section 11400 Part 3




Requires the foodservice equipment contractor to verify that
the utility rough-in connections provided by the electricians
and plumbers are located where required for the equipment.
Requires the contractor to “field- measure” to determine that
dimensions are as required for the equipment installation.
Provides specific instructions for the installation of walk-in
coolers and freezers.
Describes how field joints in equipment are to be made.
Copyright © 2003 John Wiley & Sons, Inc. All rights reserved.
Reproduction or translation of this work beyond that named in Section 117
of the 1976 United States Copyright Act without the express written
consent of the copyright owner is unlawful. Request for further information
should be addressed to the Permissions Department, John Wiley & Sons,
Inc. The purchaser may make back-up copies for his/her own use only
and not for distribution or resale. The Publisher assumes no responsibility
for errors, omissions, or damages, caused by the use of these programs
or from the use of the information contained herein.