* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Generators
Audio power wikipedia , lookup
Power inverter wikipedia , lookup
Power over Ethernet wikipedia , lookup
Stray voltage wikipedia , lookup
Utility frequency wikipedia , lookup
Electrical substation wikipedia , lookup
Electric power system wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Voltage regulator wikipedia , lookup
Surge protector wikipedia , lookup
Buck converter wikipedia , lookup
Power electronics wikipedia , lookup
Three-phase electric power wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
History of electric power transmission wikipedia , lookup
Power engineering wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Voltage optimisation wikipedia , lookup
Alternating current wikipedia , lookup
المواصفات الفنية العائدة للمولد الكهربائي وملحقاته ……………… لزوم كلية PART 1 - SUMMARY Works shall include but not limited to the following: 1. Supply and install diesel generator with associated auxiliaries, cooling air flow system, starting equipment, fuel-water separator filter, connection to fuel tank, batteries & charger, instrumentation, protection and control equipment, sound proof enclosure, operating and maintenance manual and maintenance schedule for diesel alternator etc... 2. Supply and install automatic transfer switches (ATS) with electrical and mechanical interlock, metallic coated panel enclosure and all the required accessories for the good operation etc..., 3. Supply and install load management module able to control up to three power sources, plant cabling and wiring as required for good operation of the Genset systems, all necessary monitoring, control, protection devices for the perfect operation of the system. 4. All cables, ATS, accessories, fuel system, exhaust connections and installation should be done by the contractor when necessary 01. All equipment and accessories listed below have to be installed for a perfect operation Generating set 180KVA + sound proof 02. Generating set 250KVA + sound proof 03. Generating set 315KVA + sound proof 5. and to the satisfaction of the technical staff: 04. 05. 06. 07. 08. 09. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. Generating set 70KVA + sound proof Generating set 100KVA + sound proof Generating set 135KVA + sound proof Generating set 150KVA + sound proof ATS with 2 power contactors (3x150A) for Generating set 70 KVA ATS with 2 power contactors (3x200A) for Generating set 100 KVA ATS with 2 power contactors (3x250A) for Generating set 135 KVA ATS with 2 power contactors (3x250A) for Generating set 150 KVA ATS with 2 power contactors (3x300A) for Generating set 180 KVA ATS with 2 power contactors (3x400A) for Generating set 250 KVA ATS with 2 power contactors (3x500A) for Generating set 315 KVA Load management module between two generators and all necessary control cables power cables for Generating set 100 KVA power cables for Generating set 135 KVA power cables for Generating set 150 KVA power cables for Generating set 180 KVA power cables for Generating set 250 KVA power cables for Generating set 315 KVA Fuel tank 1000 L Fuel tank 2000 L Fuel tank 3000 L Exhaust pipes 4 inches Exhaust pipes 6 inches 1 PART 2 - GENERAL 2.1 LOCATION The contractor is committed to site inspection of the generator location. 2.2 STANDARDS Generator shall comply with the latest edition of IEC, unless otherwise indicated. 2.3 SPARE PARTS Provide manufacturer’s recommended list spare parts for 1000 hours operation of the generator (lubricating oil, oil and fuel and air filters, …) 2.4 QUANTITIES Quantities of Power + control cables and Exhaust pipes are approximate and will be paid according to the effective executed meters as the required needs (depending on the site conditions) for the good operation of the system. 2.5 SUBMITTALS A. Contractor should submit operations and maintenance manuals in English, after the finishing of works. B. Contractor should submit test form for approval. C. Contractor should submit shop drawing for ATS and load management module for approval. 2.6 WARRANTY Provide one year full warranty or 1000 working hours (which ever occurs first) for replacing and repairing any equipment or auxiliary specified in this specifications. PART 3 - PRODUCTS 3.1 MANUFACTURER A. Engine and alternator should be made in Europe or USA. B. Generator could be locally assembled. 3.2 DESCRIPTION OF GENERATOR SET A. DIESEL GENERATOR SET 1. 2. 3. 4. 5. COMPONENTS: Set is to basically consist of diesel engine, Brushless synchronous generator with direct flexible coupling to engine and set mounted control panel. GOVERNING: Shall comply with ISO 3046/1 or BS 5514, using electronic type governor. STARTING AND STOPPING: When in the automatic mode the set is to start automatically by a signal sent through an auxiliary contact. The set is to stop, after an adjustable cool-down period 20 minutes. HAND OPERATION: Is to be possible for testing or normal operation through a selector switch. DUTY: Generator is to reach full speed within 12 seconds of start impulse. Loads are then connected and the generator shall accept immediately 65% of net rated output (load being mixed, steady and inductive, with motor starting). During the process, transient voltage variation is not to exceed 10% under any step-load application for which the system is intended. 2 6. 7. 8. B. FAILURE TO START: If the engine fails to start following a start impulse, the system is to come to rest for a few seconds. Two further starting attempts are to be automatically made with intermediate 20 second maximum periods of rest. If the engine fails to start after three attempts, an alarm is to sound and a start failure signal illuminate. REGULAR EXERCISING: While on “auto”, the set is to start regularly and automatically every weekly and is to operate for an adjustable time preset 30 minutes before stopping. VIBRATION REDUCTION: Is to be achieved by appropriate design and careful balancing at factory. Generator Set is to have approved anti-vibration isolators of steel spring or resilient neoprene between rotating equipment and bed-frame, limiting transmission of vibration to building to a maximum of 0.05 mm amplitude throughout the operating vibration frequency range. DIESEL ENGINE AND AUXILIARIES 1. 2. 3. 4. 5. 6. 7. 8. 9. ENGINE TYPE: Compression-ignition type with direct solid- injection, turbo-charged after-cooled, in line or V type cylinder arrangement, 1500 rpm, class A diesel oil, suitable for direct coupling to driven machine. Flywheel is to be suitably sized for type of service and constraints specified (should be enough for a load pick-up capability of 65% of the generator’s rating), and capable of being rotated at 125% of rated speed without failure. Torsional vibration dampers are to be provided. Engine to be preheated in order to reach 65% of the load in 12 seconds and 100% of the load in 3 minutes. COOLING SYSTEM: Engine is to be water cooled with gear-driven water pumps. System is to be pressurized, with heavy-duty tropical radiator cooled by reverse flow fan. Fan coil and hand protection guard are to be fitted. Coolant temperature is to be controlled by one or more thermostats. Radiator is to be sized for continuous performance at 110% rated load at worst operating ambient conditions with a 15 deg. C temperature differential. Radiator is to be non-ferrous metal, incorporating pressure valve, and radiator cap and drain cock and with integral expansion tank. COOLING AIRFLOW: Obstructions in path of cooling airflow (openings, louvers, grilles, mesh, ducts, bends, etc...) are not to reduce airflow below that needed at full rated output. FUEL SYSTEM: Is to have injection pump and injectors that are easily removable and replaceable for servicing. Engine is to have integral, gear type engine driven transfer pump to lift fuel against a head of 2.5 m and supply it through filters to injection pump at constant pressure. Fuel filter elements are to be easily replaceable. Fuel /water separator should be provided. Generator should be connected to the external fuel tank through steel pipes, valves and all necessary accessories should be dimensioned, supplied and installed by the contractor in such a way to ensure good function of the system. AIR INTAKE SYSTEM: Engine air filter is to be either dry filter with replaceable paper filter elements or oil-bath filter dipstick and provision for adding oil while engine is running. Filters are to be capable of removing particles 10 microns and larger. ELECTRIC STARTING SYSTEM: Engine starting shall be manual by push-button or automatic through control system at control panel. System shall consist of heavy duty 24 V D.C. starter motor, heavy duty battery and battery charger. Cranking motor and battery are to be rated for cranking the engine when cold and at lowest temperature recorded. Starting pinion is to automatically disengage when engine fires. STORAGE BATTERY: Lead-acid, sealed-in-plastic type completes with battery rack and inter-cell connectors. Battery is to have sufficient capacity to provide minimum six (6) cranking periods. BATTERY CHARGER: To be European, Japanese or American made, 25% over-rated, solid state, full-wave rectifier type, adequate to fully recharge depleted battery in not more than 8 hours and to automatically control rate of charge (providing a high-charge rate to a depleted battery and reducing to a trickle-charge rate when battery is fully charged). Ammeter is to be provided to indicate charging rate, which is to be adjustable. ELECTRONIC GOVERNOR: Governor is to have zero percent (isochronous) setting and adjustable drop from zero percent to 10% drop. System is to include power supply unit, magnetic speed pick-up, control module and actuator using fast response D.C motor drive or equally approved alternative. Governor is to be designed for fastresponse and high-precision of speed (frequency) control, and is to include speed adjustment to +/-5% of normal, while running, and with remote control interface. 3 10. 11. 12. 13. C. GENERATOR (ALTERNATOR) 1. 2. 3. 4. D. Frequency deviation under 25% sudden load change is not to exceed 1 Hz, recovering to stable speed condition of +/-0.1 Hz in 1 second. GOVERNOR OVERSPEED TRIP: Is to automatically close fuel pump racks in event of engine overspeed. Device is to be separate and independent from governing mechanism. EXHAUST SYSTEM: Is to be complete with flanged, bolted, black sheet steel, Painted with inflammable aluminum coat ,seamless steel pipe sections, long sweep elbows, flexible expansion sections, clean-outs, residential silencer, wall thimbles and supporting steelwork, . Exhaust system is to be designed to reduce back pressure to below maximum specified by the manufacturer. Dimensions of all exhaust systems should be on the responsibility of contractor (not less than 4 inches diameter). PROTECTIVE SYSTEM: Is to comprise automatic engine shutdown and generator trip with visual and audible alarm in event of overspeed, low lubricating oil pressure, high cooling water temperature and over cranking. TYPE: Synchronous, low reactance, high efficiency, revolving field type, with brushless exciter and flexible coupling, sized to pick up effective load without exceeding transient and steady-state voltage deviation limits specified up to its full nominal rating. MAXIMUM VOLTAGE DIFFERENCE: Between the three phases at 100% balanced load is not to exceed 1%. With unbalanced load up to 30% on one phase at unity power factor and zero loads on other phases, the line-to neutral voltages are not to differ by more than 5%. CHARACTERISTICS: a. Number of phase: 3 b. Rated voltage: 380V c. Frequency: 50Hz d. Rated power factor: 0.8 e. Overload: 10% nameplate rating for 1 hour every 12 hours g. Rotor: Salient pole type. Incorporating damping grid. h. Excitation: Brushless, with rotating Armature rectifiers and discharge resistors. j. Insulation: class H for stator, class H for Rotor and exciter. k. Enclosure: drip proof and screen protected (IP 23 to IEC 529) l. Cooling: built-in centrifugal fans. VOLTAGE REGULATOR: Solid state, volts/Hz type, utilizing silicon semi-conductor devices in control and power stages, with built-in electro-magnetic interference suppression and designed for singles or parallel operation. Optional manual adjustment to +/-5% of regulated voltage level is to be possible. Voltage regulator is to automatically reduce voltage if load exceeds capacity of generator and is to sustain a 3phase short-circuit current at the generator terminals for the period for which the shortcircuit protection operates and at least for 3 seconds. The voltage regulator has to monitor the 3-phases outputs. Voltage regulator power is to be supported by a permanent magnet to maintain excitation field power (PMG). Overall voltage deviation within normal speed variations is to be within limits specified from no-load to full-load, from hot to cold and with load power factor from 0.8 lagging to unity. Regulator is to automatically reduce voltage if load exceeds capacity of generator. Voltage build-up is to be positive and rapid even when full load is suddenly applied. Line-to-line voltage wave-from deviation factor is not to exceed +/-5%. Total harmonic content is not to exceed 5%. INSTRUMENTATION, PROTECTION AND CONTROL EQUIPMENT. 1. GENERATING SET INSTRUMENTS, PROTECTION AND CONTROLS: Control relays, sensing equipment, switchgear protective relays and devices and start, stop and 4 2. shutdown controls are to be provided as necessary for operation specified. Generating set, instruments, protection and controls are to be mounted preferably in one control cubicle. PROTECTIVE GEAR: Is to ensure orderly engine stop or shutdown with reset relays, as required for safety and operational reliability, and is to include the following: a. Molded case circuit breaker (MCCB) 3 poles (Schneider, Siemens, ABB, Moeller or similar ...), compatible with the generator rating and must be adjustable. b. Over-voltage protection with voltage and time lag adjustment. c. Loss-of-field protection. 3. GENERATOR CONTROL PANEL is to include at least the following: a. Digital indication (LCD): 1) Voltage 2) Current. 3) Frequency. 4) System diagnostic. 5) Oil pressure. 6) RPM. 7) Hour meter. 8) Coolant temperature. b. Indicating lights: 1) Low oil pressure. 2) High coolant temperature. 3) Overspeed. 4) Overcrank. 5) Fault shutdown. 6) Charging fault. 7) 3 spare lights. c. Controls: 1) Auto, start/stop. 2) Emergency stop. 3) Lamp test. 4) Cool down timer. 5) Cycle crank. 6) Voltage control. 4. 5. 6. CURRENT TRANSFORMERS: class 1 for measuring and protection. ENCLOSURE CONSTRUCTION: Is to comply with IEC EN 60439-1. VOLTAGE TRANSFORMERS: Single phase, dry type, 0.5 accuracy class. PART 4 - EXECUTION 4.1 SOUND PROOF ENCLOSURE Sound proof enclosure should be designed for 78dB at 1 meter, made of black steel 2 to 3 mm (minimum) sand blasted and painted (humal paint) with rockwool insulation 10mm (minimum), access service lockable doors. It should ensure proper ventilation without using of a separate independent ventilator. 4 lifting points and support pads should be provided to carry the whole set. The sound proof ground should be insulated. 4.2 LOAD MANAGEMENT A. DESCRIPTION: 1. The load management module should be able to control up to three power sources: MAIN and two generators G1 and G2 of different rating. It should be able to measure the voltage and frequency on all three sources as well as the current on the load side. It has four operating modes selectable by the user: OFF, AUTO, MAIN, generator G1, generator G2. The menu gives access to all timers, set points and other parameters relevant to the control and protection of the installation. 5 2. 3. B. FEATURES: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. C. Measurement and display of the voltages and frequency on the three sources. Measurement and display of the current on the load side. All three supplies are monitored for over/under voltage, phase presence and sequence. All three supplies are monitored for frequency. Load side is monitored for over current when it is not supplied by the main. Display switches automatically to show the measurements of the source feeding the load. Automatic switching between the two generators based on the load. Weekly exerciser function. Ability to control contactor and motorized circuit breakers. Menu to provide access to all timers, set points and other parameters. Over/under frequency alarm and shut down. Over/under voltage alarm and shut down. Over current alarm and shut down. OPERATION: 1. OFF. 2. AUTO: On receipt of a start signal signaling loss of power (MAIN), the generator G1 shall automatically and independently start then pick up the load, if the load is less than a preset level (will be determined on site) or G1 fails to start the generator G2 start automatically and pick up the load instead of G1. When the load become higher than a preset level, G1 start automatically and pick up the load instead of G2. 3. MAIN: The module monitors the MAIN supply. The load is fed exclusively from this supply if it is within the acceptable limits. No generator will be started if the MAIN fails. Generator G1: In this mode and regardless of the status of the MAIN supply, the module starts generator1 and engages the load after warm up delay. Generator G2: In this mode and regardless of the status of the MAIN supply, the module starts generator 2 and engages the load after warm up delay. Final sequence of operation should be coordinated with technical staff. 4. 5. 6. 4.3 Load management system can be installed in ATS-1 in adequate way or in a separate enclosure. A manual bypass shall be provided in order to ensure the continuity of electricity feeding for the building, if the load management system fails to operate the system for any reason. AUTOMATIC TRANSFER SWITCH (ATS) A. Works shall include Supply and install automatic transfer switches ATS with all associated auxiliaries, plant cabling and wiring. ATS cabinet shall be made from sheet steel 1.5 mm minimum with continuous welded seams, hinged key locking front door, IP54. All devices and cables should be labeled. B. ATS-1 shall receive incoming cables from the generator G1 and the generator G2 and outgoing cables to the ATS-2 and all necessary control cables. C. ATS-2 shall receive incoming cables from ATS-1 and the MAIN source (EOL) and outgoing cables to the main panel board and all necessary control cables. D. ATS contains but not limited the following: 1. Two power contactors (AC3) (Telemecanique, Siemens, ABB, Moeller or similar ...) 2. The two contactors should be mechanically and electrically interlocked. 3. All incoming and outgoing cable sections shall be adequate with the power of generators 4. All necessary monitoring, control, protection devices for the perfect operation of the system. 6 4.4 CABLES A. Cables glands, cables support, lugs and labels shall be used for all cables. B. Cables sizes: 1. Power cables between generators G1 and G2 , ATS-1, ATS-2 and the MAIN source shall be adequate with the power of generators 2. Control cables shall be selected by the contractor for the perfect operation of the system. 4.5 TESTING A. LOAD TESTS: Are to be carried out at low loads to overload conditions, at various power factors. Measurements are to include voltage and frequency deviations and regulating time under various step-loading conditions, temperature measurements and pressure measurements at various locations, and in accordance with an approved plan under conditions equal to worst site ambient conditions. B. TESTS: Are to include at least the following: 1. 2. 3. 4. Full load test for 8 hours continuous, immediately followed by 10% overload test, without interruption. Insulation measurement. Functional tests for voltage sensing, automatic start and stop etc... Operation of engine shut- down and alarm a signaling and indication, under simulated fault conditions. 7 1 جدول الكميات العائد للمجموعة رقم Lot 1- BILL OF QUANTITIES ITEM 1 2 3 DESCRIPTION Supply and install of generating set 150 KVA prime and the necessary sound proof enclosure with all equipment and devices mentioned in the specifications and all necessary accessories. Supply and install of ATS with two power contactors, electromechanical interlock and all the required accessories for the good operation as mentioned in the specifications. Supply and install of load management system between generators (software and hardware) as mentioned in the specifications. UNIT QTY. No. 1 No. 1 No 1 5 Supply and install of cables 3x95+50mm2 including support, glands, lugs, labels and all necessary accessories. L.M. 100 6 Supply and install of cables 3x70+35mm2 including support, glands, lugs, labels and all necessary accessories. L.M. 10 L.M. 100 No. 1 L.M. 6 7 8 9 10 11 Supply and install of control cable between generators, ATS, Main EOL for the good operation of the sets including support, glands, lugs, labels and all necessary accessories. Supply and install main fuel tank 2000 liters, thickness 3 mm of black steel with all sanitary and accessories needed to feed the two generators in case of mains failure Supply and install of exhaust system 4 inches (one for each generator set) as mentioned in the specifications. Rehabilitation of the room located near the old generator room where it will be installed the new 150KVA generator and the main fuel tank 2000 liters. Works shall include supply and install Iron door of 200 cm width and 240 cm height and two vents with all necessary accessories. The ceiling height of 280 cm should be made from wavy galvanized and reinforced steel 1.0 mm minimum. Labor, tools, transport, unloading, builder's works, testing, one year guarantee, all overhead expenses and profit for all the above items. 8 Shall be included in the items mentioned above. 1 جدول الكميات العائد للمجموعة رقم Lot 1- BILL OF QUANTITIES ITEM 1 2 3 5 6 7 8 9 10 11 DESCRIPTION Supply and install of generating set 150 KVA prime and the necessary sound proof enclosure with all equipment and devices mentioned in the specifications and all necessary accessories. Supply and install of ATS with two power contactors, electromechanical interlock and all the required accessories for the good operation as mentioned in the specifications. Supply and install of load management system between generators (software and hardware) as mentioned in the specifications. Supply and install of cables 3x95+50mm2 including support, glands, lugs, labels and all necessary accessories. Supply and install of cables 3x70+35mm2 including support, glands, lugs, labels and all necessary accessories. Supply and install of control cable between generators, ATS, Main EOL for the good operation of the sets including support, glands, lugs, labels and all necessary accessories. Supply and install main fuel tank 2000 liters, thickness 3 mm of black steel with all sanitary and accessories needed to feed the two generators in case of mains failure Supply and install of exhaust system (one for each generator set) as mentioned in the specifications. Rehabilitation of the room located near the old generator room where it will be installed the new 150KVA generator and the main fuel tank 2000 liters. Works shall include supply and install Iron door of 200 cm width and 240 cm height and two vents with all necessary accessories. The ceiling height of 280 cm should be made from wavy galvanized and reinforced steel 1.0 mm minimum. Labor, tools, transport, unloading, builder's works, testing, one year guarantee, all overhead expenses and profit for all the above items. UNIT QTY. No. 1 No. 1 No. 1 L.M. 100 L.M. 10 L.M. 100 No. 1 L.M. 6 No. 1 Unit price US$ Shall be included in the items mentioned above. Total Price (VAT excluded) VAT Total Price (VAT included) 9 Total price US $ La section des câbles doivent être adéquates avec la puissance de générateurs The cable sections shall be adequate with the power of generators 5. Power cables from generators G1 and G2 to ATS-1, between ATS-1 and ATS-2 and between ATS-2 and the MAIN source shall be adequate with the power of generators اليجب ان يقل ارتفاع السقف.تاهيل الغرفة الموجودة قرب غرفة المولد القديم لوضع المولد الجديد وخزان المازوت السقف يجب ان يكون من.سم042 م وارتفاع0 تركيب باب حديد عرض. تركيب فتحات للتهوئة.سم082 عن .الحديد المزيبق مموج ومدعم تركيب فتحات للتهوئة Rehabilitation of room located near the old generator room where it will be installed the new 150KVA generator and the main fuel tank 2000 liters. Works shall include supply and install Iron door of 200 cm width and 240 cm height and two vents with all necessary accessories. The ceiling height of 280 cm should be made from wavy galvanized and reinforced steel 1.0 mm minimum. Largeur 10