Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE TRANSMISSION SDH / STM-1/4/16/MADM O.F. System T&D CIRCLE, JABALPUR TEST SCHEDULE STM-1/4/16/MADM OPTICAL FIBRE SYSTEM Document No. (TD/LG/2382/SDH/G/COLL.III) No of Pages. 10 Issue No. 01 Issued By: T&D Circle Jabalpur. Approved by: CGM T&D Circle Jabalpur. Date of Issue: 23-12-2008 Amendment No. (If any) No of Pages Issue No. Issued By: T&D Circle Jabalpur. Approved by: CGM T&D Circle Jabalpur. Date of Issue: Restricted use by BSNL Employees only “FIX IT RIGHT FOR THE FIRST TIME” Page 1 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE TRANSMISSION SDH / STM-1/4/16/MADM O.F. System BHARAT SANCHAR NIGAM LIMTED OFFICE OF THE CHIEF GENERAL MANAGER TECHNICAL AND DEVELOPMENT CIRCLE JABALPUR TEST SCHEDULE FOR SDH/STM-1/4/16/MADM OFC SYSYTEM PART-A INFRASTRUCTURE TEST S. No. 1. . TEST DESCRIPTION Location Alignment and Rigidity (LAR) 2. Raised floor and False Ceiling or Antistatic flooring (As provided) 3. Illumination and Power outlets Check of Earthing system 4. 5. 9. Check of Environmental condition QA certification of all equipment Check of Documentation Hardware Conformity / Software/ Conformity *Power plant 10. *Battery 6. 7.. 8. OBSERVATION TEST PROCEDURE/REFERENCE As per approved Layout plan REMARKS Earth resistance value should be < 0.50 ohm. As per E.I. No. I-001 Protection Earthing. i) Temperature between 22 to 25 degree C. ii) Relative Humidity RH : 40% to 60% For imported items refer to QA Test results from vendor As per P.O. As per P.O. To be checked for licensing As per T&D Test Schedule in case of new Power Plant As per T&D Test Schedule in case of new Battery. Page 2 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE S. No. 11. TEST DESCRIPTION *Engine Alternator 12. 13. Check of Fire fighting Equipt / Fire Detection system Voltage drop 14. Sign. Writing TRANSMISSION SDH / STM-1/4/16/MADM O.F. System OBSERVATION TEST PROCEDURE/REFERENCE REMARKS As per T&D Test Schedule As per T&D Test Schedule <1 Volt (Voltage drop from Battery terminal to Equipt input ) Note: * If existing, then earlier A/T clearance to be shown and adequacy as per present load requirement to be ascertained. Page 3 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE TRANSMISSION SDH / STM-1/4/16/MADM O.F. System PART – B LOCAL TEST Name of Route : Station : Bay Code and Serial No. Make : Capacity : S. No. 1. Parameter Check of Power Supply and its distribution 1.1 D.C. Mains distribution to equipment 1.2 Check Of Derived Voltage 2. 2.1 SDH Test On Optical Interface Optical Mean Launched Power Measurement Date of Testing: Operating Wave Length: 1310 nm / 1550 nm Fibre Number Used : Measurement Limit - 40 to – 60 Volts (-51 Volts Nominal) For L1.1 (0 to –5 dBm) For L4.2 (+2 to –3 dBm) For L16.2 (+3 to –2 dBm) 2.1.1 Laser Bias Current 2.2 Check of Receiver Sensitivity / Dynamic Range Receiver Sensitivity (To be checked for all optical ports ) 2.2.1 2.2.2 Minimum Overload Power Measurement 2.2.3 Dynamic Range Less than 80 mA. For L1.1 (-34 dBm or better) For L4.2 (-28 dBm or better) For L16.2 (-27 dBm or better) For L 1.1 –10 dBm For L 4.2 –8 dBm For L 16.2 –9 dBm For L1.1 (24 dB or better) For L4.2 (20 dB or better) For L16.2 (18 dB or better) 2.3 2.3.1 2.3.2 3. 3.1 Check of Laser Safety Manual Re-start Automatic Laser Shutdown Measurement of Bit Rate on Electrical Interface Bit Error Rate Tolerance ppm 2 Mb/s 50 34 Mb/s 20 140 Mb/s 15 155 Mb/s 20 622.08 Mb/s 20 No Error No Error No Error No Error No Error Page 4 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE S. No. Parameter 3.2 Combined Jitter From Tributary Mapping Bit Rate 2 Mb/s 3.2.1 4. 4.1 4.2 4.3 4.4 4.5 4.6 * 4.7 5 Test for Ethernet Interfaces Types of Ethernet Ports : 10BaseT, 10/100 BaseT, 100 Base Fx, 1000Base T, 1000 Base Fx In case of 100Base Fx, 1000 Base Fx a. Laser Window : 1310 nm / 1550 nm b. Trans. Power c. Auto Laser Shutoff : Ok / Not Ok No. of Ethernet ports available Check for network accessibility Cross connection details w. r. t. Ethernet ports Check for proper configuration details w. r. t. Ethernet ports a. Ethernet class of interface : Ethernet Port b. Protocol used : Generic Framing Procedure (GFP) c. Ethernet Flow Control : Enable d. Link Capacity Adjustment Scheme (LCAS) : Enable TRANSMISSION SDH / STM-1/4/16/MADM O.F. System Measurement Limit HP1+ LP F1-F4 0.4 UI (HP1+LP) F3-F4 0.075 UI (HP2+LP) -8 to –15 dbm a. Throughput test b. Latency test c. Packet (frames) Loss rate test d. Back to Back frames test Alarms w.r.t Ethernet ports a. Ethernet port Link down. b. Loss of Capacity. c. Partial Loss of Capacity d. VCC Link down e. Client Signal failure f. Far End Client Signal failure MADM Applications A) Map one E1 with each aggregate line card and measure BER B) Map one STM-1 tributary with each aggregate line card and measure BER C) Create cross connection among all four aggregate ports(two at a time) on STM-1 & E1 level and measure BER No error No error No error Page 5 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE TRANSMISSION SDH / STM-1/4/16/MADM O.F. System * Note :- For Test No.4.6 Ethernet Tester is required PART – C THROUGH TEST Station: S. No. 1. Parameter 2. BER Measurement Tolerance Bit Rate (ppm) 2 Mb/s 50 34 Mb/s 20 140 Mb/s 15 155 Mb/s 20 3. 4. Optical Receive Power Measurement a) With Power Meter b) With LCT 622.08 Mb/s 20 AIS Clock Frequency: Measurement Output jitter Measurement Bit Rate 2 Mb/s 34 Mb/s 140 Mb/s 155 Mb/s 622.08 Mb/s 5. Input jitter Tolerance Measurement 2 Mb/s 34 Mb/s 140 Mb/s 155 Mb/s 622.08 Mb/s Date. of Testing Measurement Limit For L1.1 (-28 dBm or better) For L4.2 (-22 dBm or better) For L16.2 (-21 dBm or better) Error Value No Error No Error No Error No Error No Error 2048 KHz 102 Hz F1-F4 0.75 UIPP F3-F4 0.2 UIPP F1-F4 0.75 UIPP F3-F4 0.15 UIPP F1-F4 0.75 UIPP F3-F4 0.075 UIPP F1-F4 0.75 UIPP F3-F4 0.075 UIPP F1-F4 0.75 UIPP F3-F4 0.075 UIPP F1-F4 1.5 UIPP F3-F4 0.2 UIPP F1-F4 1.5 UIPP F3-F4 0.15 UIPP F1-F4 1.5 UIPP F3-F4 0.075 UIPP F1-F4 1.5 UIPP F3-F4 0.075 UIPP F1-F4 1.5 UIPP F3-F4 0.075 UIPP Page 6 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE S. No. 6. Parameter 7. 7.1 Check of Order Wire: Selective Calling (List of Order wires no. to be attached) Omnibus Calling Check of Synchronization: with PRC Source # External Clock Measurement Tributary Clock Measurement Holdover Mode Check of Protection Switching Path Protection Switching 7.2 8. 8.1 8.2 8.3 9. 9.1 9.2 9.3 10. 10.1 10.2 10.3 11. 11.1 11.2 11.3 12. 12.1 TRANSMISSION SDH / STM-1/4/16/MADM O.F. System Measurement Limit Test for Ethernet Interface. ** a. Through put test b. Latency test c. Packet (frames) Loss rate test d. Back to Back frames test 2048 KHz 4.6 ppm 2048 Kb/s 50 ppm Check that after protection Switching. AIS is restored Equipt. Protection Switching Order wire Function (After Switch over) Network Management System (NMS) (Applicable only for NMS stations) Performance Monitoring Configuration Management Security Management Craft Terminal ( For Local & Remote ) Performance Monitoring Configuration Management Security Management Alarms Alarms Name a. FERF b. AIS c. LOP d. MS e. LOS f. LOF 13. Error Performance (Stability Test) (48 hrs. continuously) 13.1 Bit Rate 2 Mb/s Limit at 64 Kb/s DM : 0.023 % ES : 0.018 % SES : 0.00023 % Note: Limits are given for length of 280 kms. of fibre. ** For Test item 6. Ethernet Tester is required. # Tracing of the Sync path to be indicated. Page 7 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE TRANSMISSION SDH / STM-1/4/16/MADM O.F. System ANNEXURE BHARAT SANCHAR NIGAM LIMITED OFFICE OF THE CHIEF GENERAL MANAGER T&D CIRCLE JABALPUR Procedure for SDH OFC system for SDH/STM-1/4/16 LOCAL TEST (1) SDH.TEST ON OPTICAL INTERFACE. 2.1 Check of optical mean launched power THE TEST SET UP IS SHOWN BELOW:----Optical Power Meter SUT (System Under Test) Fig. 1 1.1 OPTICAL POWER MEASUREMENT ON PC/LCT :-- (a) OPTICAL POWER (b) LASER BIAS CURRENT NOTE: POWER SHOULD BE MEASURED WITH ALS( AUTOMATIC LASER SHUT DOWN INHABITED WITH THE HELP OF PC ) i.e. OPTICAL POWER IS IN FORCED ON CONDITION. 2.0 CHECK OF RECEIVER SENSITIVITY/DYNAMIC RANGE :The test set up is given in fig. 2 below:DTA TX SYSTEM UNDER TEST OPTICAL POWER METER OPTICAL ATTENUATOR DTA RX FIG. 2 Page 8 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE TRANSMISSION SDH / STM-1/4/16/MADM O.F. System 3. CHECK OF LASER SAFETY :LIMIT :TX POWER SHOULD COME DOWN TO 10 db with respect to measured trans power (it should be below –10 dBm) The above test may be conducted with the help of software if available with the system under test. 4.0 MESUREMENT OF BER ON ELECTRICAL INTERFACE: Measure the BER at electrical interface as per procedure given in the diagram 3 given below:SYSTEM UNDER TEST E/I O/E SDH ANALYSER /DTA TX/RX OPTICAL ATTENUATOR FIG. 3 5.0 COMBINED JITTER FROM TRIBUTARY MAPPING :- Make the test set up as given in fig.4 below. Now vary the bit rate tolerance of 2 Mb/s pay load as applicable (i.e. 50 ppm) & measure the output jitter. Measure the output jitter & check for it being in the limit. REFERENCE CLOCK DTA SYSTEM UNDER TEST TX OPTICAL ATTENUATOR RX FIG 4 DTA IS WORKINGON INTERNAL CLOCK Page 9 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE TRANSMISSION SDH / STM-1/4/16/MADM O.F. System THROUGH TEST 1.0 Optical receive power: Optical receive power should be measured with the help of power meter and craft terminal and observations are to be recorded. 2.0 BER Measurement 3.0 AIS CLOCK FREQUENCY MEASUREMENT:Measure the AIS frequency on any two 2 Mb/S tributaries. 2.0 Output Jitter Measurement (with mapping): Feed the 2/34/140 Mb/s PRBS signal 3.0 (without jitter) from DTA transmitter to the tributary input of the SDH 4.0 equipment under test. Now measure the output jitter for the tributary mapped 5.0 by SDH system with the help of DTA Rx as shown in fig.5 by selecting suitable 6.0 filters. The output jitter should be within the limits given below. Repeat the 7.0 test for other tributaries also. 2/34/140 2/34/140 Mb/S DTA TX Mb/S DTA RX SDH SYSTEM UNDER TEST B B SDH SYSTEM UNDER TEST A A STATION A STATION B FIG 5 5.0 6.0 7.0 8.0 9.0 10.0 INPUT JITTER TOLERANCE (With mapping): Feed 2/34/140 Mb/s signal modulated by sinusoidal jitter frequency from DTA transmitter to the tributary input of SDH equipment. Set the jitter frequency as per table below & increase the jitter level till error appears in DTA receiver. Note down the maximum jitter amplitude corresponding to no error, condition. Repeat the above procedure with clock offset also as applicable for bit rates. Page 10 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008 BHARAT SANCHAR NIGAM LTD. TEST SCHEDULE TRANSMISSION SDH / STM-1/4/16/MADM O.F. System 6.0 Check of O/W : (i) O/W may be tested up to BER 1x10-3 for speech and signalling by attenuating the power by inserting optical pads.O/W should be able to work when BER is upto 1x10-3 7.0 Check of Synchonisation : Check that master station/node is synchronised with Cesium or Rubidium clock or from the clock of nearby TAX. Other nodes may be synchronised with the clock extracted from incoming tributaries. 8.0 Check Of Protection switching :Put the system on PPS and record the time of AIS Restored. 9.0. ALARMS: As per manufacture’s guidelines. 10.0 ERROR PERFORMANCE (STABILITY TEST): System should meet the following limits at Bit rate of 64Kb/s for test duration of Available time of 48 hours continuously. These limits are given for HRDS length of 280 KM. If a real digital section under test is longer than HRDS length of 280 Km ,its overall allocation should correspond to that of integer number of HRDS,the combined length of which are atleast as long as the real digital section length. If a real section is shorter than 280 Km ,there will be no reduction of bit error allocation. __________________________________________________________________________ Page 11 of 10 O/o CGM T&D CIRCLE JABALPUR Issue 5, Dt. 23-12-2008