Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
PROJECT MANAGEMENT FOR INFORMATION, TECHNOLOGY, BUSINESS AND CERTIFICATION INSTRUCTOR GUIDE No part of this manual may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information storage or retrieval system, without the written permission of the publisher, except where permitted by law. Copyright 2005, KAPUR International, Inc. Center for Project Management® All rights reserved. Published by: Center for Project Management® One Annabel Lane, Suite 108 San Ramon, CA 94583 Phone: (925) 275-8000 Fax: (925) 275-8115 Email: [email protected] web page: http://www.center4pm.com PRINTED IN THE UNITED STATES OF AMERICA Selected materials in this document are based on Center for Project Management’s publications Estimating MIS Projects, PERT, CPM®, and Gantt. Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Table of Contents PREFACE ................................................................................. xxi Chapter 1 Introduction ........................................................... 1 Chapter 1: Introduction.....................................................................................3 Objectives .....................................................................................................3 Overview ......................................................................................................4 Details ..........................................................................................................4 Why Project Management? .........................................................................4 What is a Project? ......................................................................................4 Project vs. Operations ................................................................................5 It’s not a “Three-Legged Stool” ...................................................................5 When Does Work Turn into a Project? .........................................................5 What is Project Management?.....................................................................5 Project Management is not a Tool ...............................................................5 The State of Project Management ...............................................................5 Extreme Project Failures .............................................................................6 The Seven Deadly Sins of Project Management ............................................6 Why Your Project Management Investment may Never Pay Off. ...................6 The Success Equation ................................................................................6 The Project Process Architecture (PPA)..................................................7 Idea Stage .............................................................................................7 Pre-Launch Stage ...................................................................................7 Launch Stage .........................................................................................7 Execute Stage ........................................................................................7 Implement Stage ....................................................................................7 Operation Stage .....................................................................................7 Tailoring the PPA .................................................................................8 Mapping the PPA to PMBOK .....................................................................8 Mapping the PPA to CompTIA Project+ ....................................................8 Mapping the PPA to SEI’s CMMI ...............................................................9 Product Development Methodology .............................................................9 Celebrating Project Success ...................................................................... 10 It’s the Other Leg, Stupid. ........................................................................ 10 Organizational Discipline and Individual Skills ............................................ 10 The Mocking Post ..................................................................................... 10 Summary................................................................................................. 11 Questions and Discussion Points ............................................................... 11 Chapter 2 Fundamentals ....................................................... 12 Chapter 2: Fundamentals ................................... Error! Bookmark not defined. Objectives ...................................................... Error! Bookmark not defined. iii Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Overview ....................................................... Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. Project Management Roles and Responsibilities .......... Error! Bookmark not defined. Project Sponsor ....................................... Error! Bookmark not defined. Project Manager ...................................... Error! Bookmark not defined. Program Manager .................................... Error! Bookmark not defined. Stakeholders ........................................... Error! Bookmark not defined. Customers and End Users ........................ Error! Bookmark not defined. Functional Managers ................................ Error! Bookmark not defined. Team Members ....................................... Error! Bookmark not defined. Subject Matter Experts (SMEs) ................. Error! Bookmark not defined. Vendors .................................................. Error! Bookmark not defined. Contractors and Consultants ..................... Error! Bookmark not defined. Key Project Elements .................................. Error! Bookmark not defined. Phase ..................................................... Error! Bookmark not defined. Deliverable .............................................. Error! Bookmark not defined. Task ....................................................... Error! Bookmark not defined. Subtask ................................................... Error! Bookmark not defined. Activity.................................................... Error! Bookmark not defined. Event ...................................................... Error! Bookmark not defined. Milestone ................................................ Error! Bookmark not defined. Issue ...................................................... Error! Bookmark not defined. Resource ................................................. Error! Bookmark not defined. Lag ......................................................... Error! Bookmark not defined. Work Product .......................................... Error! Bookmark not defined. Work Package ......................................... Error! Bookmark not defined. Work Breakdown Structure .......................... Error! Bookmark not defined. Creating a WBS ....................................... Error! Bookmark not defined. Phase-Level Decomposition ...................... Error! Bookmark not defined. Deliverable-Level Decomposition .............. Error! Bookmark not defined. Task-Level Decomposition ........................ Error! Bookmark not defined. Order of WBS Decomposition ................... Error! Bookmark not defined. Level of WBS Decomposition .................... Error! Bookmark not defined. WBS Exercise .......................................... Error! Bookmark not defined. Task Network ............................................. Error! Bookmark not defined. Activity-on-Arrow (AOA) Network.............. Error! Bookmark not defined. Activity-on-Node (AON) Network .............. Error! Bookmark not defined. Task Dependencies or Relationships ......... Error! Bookmark not defined. Finish-to-Start (FS) ............................... Error! Bookmark not defined. Start-to-Start (SS) ................................ Error! Bookmark not defined. Finish-to-Finish (FF) ............................. Error! Bookmark not defined. Start-to-Finish (SF) ............................... Error! Bookmark not defined. Developing a Task Network ...................... Error! Bookmark not defined. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved iv Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Critical Path Calculation ............................... Error! Bookmark not defined. Forward Path and Backward Path Computation ....... Error! Bookmark not defined. Example .............................................. Error! Bookmark not defined. Late Finish (LF) .................................... Error! Bookmark not defined. Late Start (LS) ..................................... Error! Bookmark not defined. Example .............................................. Error! Bookmark not defined. Determining the Critical Path .................... Error! Bookmark not defined. Activity Float, Free Float, or Free Slack .. Error! Bookmark not defined. Path Float or Total Slack ....................... Error! Bookmark not defined. Network Constraints ................................ Error! Bookmark not defined. Extra Resources ....................................... Error! Bookmark not defined. Why Version 0 Network? .......................... Error! Bookmark not defined. Network Diagram Exercise ....................... Error! Bookmark not defined. Tree House: Suggested WBS and Task Network.......... Error! Bookmark not defined. Summary.................................................... Error! Bookmark not defined. Questions and Discussion Points .................. Error! Bookmark not defined. Chapter 3 Idea Stage ........................Error! Bookmark not defined. Chapter 3: Idea Stage ........................................ Error! Bookmark not defined. Objectives ...................................................... Error! Bookmark not defined. Overview ....................................................... Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. The Wheel of Half-Baked Ideas .................... Error! Bookmark not defined. Idea Statement—PPA Step 1..................... Error! Bookmark not defined. Situation Analysis .................................... Error! Bookmark not defined. Purpose of the Project ............................. Error! Bookmark not defined. Focus on the Business Problem................. Error! Bookmark not defined. Who Will Use It? ...................................... Error! Bookmark not defined. Key Search Words ................................... Error! Bookmark not defined. Strategy Alignment .................................. Error! Bookmark not defined. Value-to-Business .................................... Error! Bookmark not defined. Critical Success Factors ............................ Error! Bookmark not defined. Customer’s Deadline ................................ Error! Bookmark not defined. Project Impact ......................................... Error! Bookmark not defined. Consequences of Doing Nothing ............... Error! Bookmark not defined. Security Requirements ............................. Error! Bookmark not defined. Window of Opportunity ............................ Error! Bookmark not defined. Project Request—PPA Step 2 .................... Error! Bookmark not defined. Key Stakeholders ..................................... Error! Bookmark not defined. Key Assumptions ..................................... Error! Bookmark not defined. Organizational Change ............................. Error! Bookmark not defined. Spending Limit ........................................ Error! Bookmark not defined. v Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Funding Source ....................................... Error! Bookmark not defined. Ownership............................................... Error! Bookmark not defined. Project Duplication/Overlap ...................... Error! Bookmark not defined. The Filtering Process ................................... Error! Bookmark not defined. Stage Gate No. 1 ........................................ Error! Bookmark not defined. Summary.................................................... Error! Bookmark not defined. Questions and Discussion Points .................. Error! Bookmark not defined. Chapter 4 The Pre-Launch Stage .......Error! Bookmark not defined. Chapter 4: Pre-Launch Stage .............................. Error! Bookmark not defined. Objectives ...................................................... Error! Bookmark not defined. Overview ....................................................... Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. The Pre-Launch Stage ................................. Error! Bookmark not defined. Responsibility .......................................... Error! Bookmark not defined. Project Description—PPA Step 3 ................ Error! Bookmark not defined. The Nature of the Project ......................... Error! Bookmark not defined. Project Objectives .................................... Error! Bookmark not defined. Validated Assumptions ............................. Error! Bookmark not defined. Conceptual Build ...................................... Error! Bookmark not defined. Runaway Triggers .................................... Error! Bookmark not defined. Shutdown Conditions ............................... Error! Bookmark not defined. Current System Retirement ...................... Error! Bookmark not defined. Intra-Project Priority Analysis—PPA Step 4. Error! Bookmark not defined. Definition of Quality .................................... Error! Bookmark not defined. Intra-Project Priorities—Example 1............ Error! Bookmark not defined. Intra-Project Priorities—Example 2............ Error! Bookmark not defined. Intra-Project Priorities—Example 3............ Error! Bookmark not defined. Intra-Project Priorities—Example 4............ Error! Bookmark not defined. A Change in Intra-Project Priorities .............. Error! Bookmark not defined. Option 1.................................................. Error! Bookmark not defined. Option 2.................................................. Error! Bookmark not defined. Option 3.................................................. Error! Bookmark not defined. Worst Case Scenario ................................ Error! Bookmark not defined. Stakeholder Analysis—PPA Step 5 ............. Error! Bookmark not defined. Stakeholder Assessment........................... Error! Bookmark not defined. Policy Level Stakeholders ......................... Error! Bookmark not defined. Implementation Level Stakeholders .......... Error! Bookmark not defined. Examples ................................................ Error! Bookmark not defined. Complexity Assessment—PPA Step 6 ......... Error! Bookmark not defined. Project Complexity Assessment................. Error! Bookmark not defined. Business Environment .............................. Error! Bookmark not defined. Technical Environment ............................. Error! Bookmark not defined. Complexity Zones .................................... Error! Bookmark not defined. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved vi Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Value-to-Business vs. Complexity ................. Error! Bookmark not defined. High Value and Low Complexity: Sure BetsError! Bookmark not defined. High Complexity and High Value: Challenging.......... Error! Bookmark not defined. High Complexity and Low Value: Questionable ........ Error! Bookmark not defined. Low Complexity and Low Value: Sustaining ............. Error! Bookmark not defined. Tailoring the PPA ..................................... Error! Bookmark not defined. Policies, Standards, and Procedures—PPA Step 7 ..... Error! Bookmark not defined. Impact Assessment—PPA Step 8 ............... Error! Bookmark not defined. Data Quality ............................................ Error! Bookmark not defined. Volume ................................................... Error! Bookmark not defined. Frequency ............................................... Error! Bookmark not defined. Media Compatibility ................................. Error! Bookmark not defined. Security .................................................. Error! Bookmark not defined. Timeliness ............................................... Error! Bookmark not defined. Infrastructure .......................................... Error! Bookmark not defined. Cross-Project Dependencies ..................... Error! Bookmark not defined. Constraints and Obstacles—PPA Step 9 ..... Error! Bookmark not defined. Audit and Control Requirements ............... Error! Bookmark not defined. Budget .................................................... Error! Bookmark not defined. Technology Infrastructure ........................ Error! Bookmark not defined. Vendor Capability .................................... Error! Bookmark not defined. Vendor Capacity ...................................... Error! Bookmark not defined. Stability Assessment—PPA Step 10 ............ Error! Bookmark not defined. Issues Management—PPA Step 11 ............ Error! Bookmark not defined. Risk Assessment—PPA Step 12 ................. Error! Bookmark not defined. Ignore the Risk ........................................ Error! Bookmark not defined. Avoid the Risk ......................................... Error! Bookmark not defined. Transfer the Risk ..................................... Error! Bookmark not defined. Accept the Risk ........................................ Error! Bookmark not defined. Risk Management Examples ..................... Error! Bookmark not defined. Probability vs. Impact .............................. Error! Bookmark not defined. Risk Management Plan ............................. Error! Bookmark not defined. Preliminary Scope Statement—PPA Step 13 ............. Error! Bookmark not defined. Customer Expectations............................. Error! Bookmark not defined. Scope Decision Drivers ............................. Error! Bookmark not defined. Developing the Preliminary Scope Statement ........... Error! Bookmark not defined. Scope Chunking ....................................... Error! Bookmark not defined. Technology Obsolescence—Moore’s Law ... Error! Bookmark not defined. vii Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Project Size Estimate—PPA Step 14 ........... Error! Bookmark not defined. Range Values .......................................... Error! Bookmark not defined. Phase-Based Size Estimate ....................... Error! Bookmark not defined. Creating a Size Estimate Using a Phase-Based Model Error! Bookmark not defined. Create or Select a Phase-Based Model ... Error! Bookmark not defined. Calibrate the Phase-Based Model ........... Error! Bookmark not defined. Select and Estimate the Base Phase ...... Error! Bookmark not defined. Extrapolate Effort Estimates for Various Phases .... Error! Bookmark not defined. Compute the Estimated Work-Months for Each Phase .. Error! Bookmark not defined. Compute Optimal Full-Time Equivalent Resource .. Error! Bookmark not defined. Determine the Probable Full-Time Equivalent Resources ................ Error! Bookmark not defined. Compute the Estimated Duration for Each Phase .. Error! Bookmark not defined. Estimate Project Duration—WM ............. Error! Bookmark not defined. Estimate Sponsor, Management, and Customer Time .. Error! Bookmark not defined. Estimate Project Manager’s Effort .......... Error! Bookmark not defined. Compute Estimated Cost ....................... Error! Bookmark not defined. Level of Accuracy ................................. Error! Bookmark not defined. Deliverables-Based Size Estimate Model ....... Error! Bookmark not defined. Deliverables-Based Estimate—Example 1 .. Error! Bookmark not defined. Deliverables-Based Estimate—Example 2 .. Error! Bookmark not defined. Historical Deliverables Database ............... Error! Bookmark not defined. Use of Deliverables-Based Size Estimates .. Error! Bookmark not defined. Level of Accuracy..................................... Error! Bookmark not defined. Rework and Scope Growth Reserves ......... Error! Bookmark not defined. Need for Rework .................................. Error! Bookmark not defined. Scope Growth ...................................... Error! Bookmark not defined. Management Reserve .............................. Error! Bookmark not defined. Cost of Ownership (Life Cycle Costing) ...... Error! Bookmark not defined. Fixed Price Quotes ...................................... Error! Bookmark not defined. Project Priority ............................................ Error! Bookmark not defined. Uniform Criteria to Assess Project Priority .. Error! Bookmark not defined. Define Criteria Weight Points .................... Error! Bookmark not defined. Score Each Project ................................... Error! Bookmark not defined. Prioritize Projects ..................................... Error! Bookmark not defined. Special Recommendations ........................... Error! Bookmark not defined. Build or Buy (Procurement) ...................... Error! Bookmark not defined. Project Charter—PPA Step 15 ................... Error! Bookmark not defined. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved viii Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Expiration Date .................................... Error! Bookmark not defined. Glossary .............................................. Error! Bookmark not defined. Key Words ........................................... Error! Bookmark not defined. Items that Should not be Included in a Project Charter ... Error! Bookmark not defined. Project ID ............................................ Error! Bookmark not defined. Summary Project Schedule ................... Error! Bookmark not defined. Charter Assembly .................................... Error! Bookmark not defined. Charter Approval ..................................... Error! Bookmark not defined. The Signing Ceremony ............................. Error! Bookmark not defined. The Moment of Truth ............................... Error! Bookmark not defined. Pre-Launch Stage Benefits ........................... Error! Bookmark not defined. Stage Gate No. 2 ........................................ Error! Bookmark not defined. Order of PPA Steps .................................. Error! Bookmark not defined. Summary.................................................... Error! Bookmark not defined. Questions and Discussion Points .................. Error! Bookmark not defined. Chapter 5 Launch Stage: Planning ....Error! Bookmark not defined. Chapter 5: Launch Stage—Planning .................... Error! Bookmark not defined. Objectives ...................................................... Error! Bookmark not defined. Overview ....................................................... Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. Launch Stage—An Overview ........................ Error! Bookmark not defined. Launch Stage Responsibility ......................... Error! Bookmark not defined. Project Staging—PPA Step 16 ................... Error! Bookmark not defined. The Project Kickoff Meeting ...................... Error! Bookmark not defined. Why the Staging Session? ........................ Error! Bookmark not defined. Helpful Tools and Tactics ......................... Error! Bookmark not defined. Experts to the Rescue .............................. Error! Bookmark not defined. Project Organization—PPA Step 17 ............ Error! Bookmark not defined. Project Organization Models ..................... Error! Bookmark not defined. Functional Organization ........................ Error! Bookmark not defined. Matrix Organization .............................. Error! Bookmark not defined. Project Organization ............................. Error! Bookmark not defined. Self-Managed Organization ................... Error! Bookmark not defined. Task Force Organization ....................... Error! Bookmark not defined. Project Types and Project Organization ..... Error! Bookmark not defined. The Center’s Project Organization Model ... Error! Bookmark not defined. Project Sponsor .................................... Error! Bookmark not defined. Executive Steering ................................ Error! Bookmark not defined. Project Manager ................................... Error! Bookmark not defined. Team ................................................... Error! Bookmark not defined. Vendors/Consultants/Suppliers .............. Error! Bookmark not defined. End Users/Customers ........................... Error! Bookmark not defined. ix Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Project Politics...................................... Error! Bookmark not defined. Team Size ............................................... Error! Bookmark not defined. Multiple Sponsors and Multiple Project Managers ..... Error! Bookmark not defined. Task Plan—PPA Step 18 ........................... Error! Bookmark not defined. Task Plan Source ..................................... Error! Bookmark not defined. Innovative Guess.................................. Error! Bookmark not defined. Memory and Experience........................ Error! Bookmark not defined. Knowledge Base ................................... Error! Bookmark not defined. Developing a Master Task List .................. Error! Bookmark not defined. Phases .................................................... Error! Bookmark not defined. Deliverables ............................................ Error! Bookmark not defined. Description .......................................... Error! Bookmark not defined. Completion Criteria ............................... Error! Bookmark not defined. Owner ................................................. Error! Bookmark not defined. Tasks ...................................................... Error! Bookmark not defined. Milestones ............................................... Error! Bookmark not defined. Issues ..................................................... Error! Bookmark not defined. Task Network .......................................... Error! Bookmark not defined. Risk Management Tasks ........................... Error! Bookmark not defined. Time Dependent Risk ........................... Error! Bookmark not defined. Floating Risk ........................................ Error! Bookmark not defined. Current System Retirement ...................... Error! Bookmark not defined. Project Manager’s Responsibility ............... Error! Bookmark not defined. Plans? We Don’t Need No Stinking Plans ... Error! Bookmark not defined. Comprehensive Task Plan......................... Error! Bookmark not defined. Contingency Tasks ............................... Error! Bookmark not defined. Current System Retirement Tasks.......... Error! Bookmark not defined. Customer Training Tasks ...................... Error! Bookmark not defined. Deployment Tasks ................................ Error! Bookmark not defined. Development Tasks .............................. Error! Bookmark not defined. Infrastructure Upgrade Tasks ................ Error! Bookmark not defined. Operations Tasks.................................. Error! Bookmark not defined. Organization Change Management Tasks ............. Error! Bookmark not defined. Project Closure Tasks ........................... Error! Bookmark not defined. Quality Management Tasks ................... Error! Bookmark not defined. Team Education and Training Tasks ...... Error! Bookmark not defined. Milestones ........................................... Error! Bookmark not defined. Sponsor Sign-Off ..................................... Error! Bookmark not defined. Comprehensive Task Plan—Summary........ Error! Bookmark not defined. Important Considerations ......................... Error! Bookmark not defined. Prototyping Plan—PPA Step 19 ................. Error! Bookmark not defined. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved x Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Organization Change Management Plan—PPA Step 20..... Error! Bookmark not defined. Psychology of Change .............................. Error! Bookmark not defined. Project Stress Analysis ............................. Error! Bookmark not defined. Time Away from Primary Responsibility . Error! Bookmark not defined. Degree of Change ................................ Error! Bookmark not defined. Willingness to Absorb the Change ......... Error! Bookmark not defined. Ability to Absorb the Change ................. Error! Bookmark not defined. Timing of the Change ........................... Error! Bookmark not defined. Project Stress Interpretations ................... Error! Bookmark not defined. Develop Organization Change Management Plan ..... Error! Bookmark not defined. Change Agent.......................................... Error! Bookmark not defined. Scope Management Plan—PPA Step 21 ..... Error! Bookmark not defined. Scope Growth .......................................... Error! Bookmark not defined. The Velcro Suit ........................................ Error! Bookmark not defined. Contractors and Consultants ..................... Error! Bookmark not defined. Project Team ........................................... Error! Bookmark not defined. Uninvolved Sponsor ................................. Error! Bookmark not defined. Scope Management Process ..................... Error! Bookmark not defined. Scope Creep—An Example ....................... Error! Bookmark not defined. Team Member’s E-Mail ......................... Error! Bookmark not defined. Project Manager’s Response .................. Error! Bookmark not defined. Sponsor’s Response .............................. Error! Bookmark not defined. Team Member’s Response .................... Error! Bookmark not defined. Summary ............................................. Error! Bookmark not defined. Change Control Board .............................. Error! Bookmark not defined. Scope Growth—The Limit ......................... Error! Bookmark not defined. Configuration Management ...................... Error! Bookmark not defined. Project Change Management Plan............. Error! Bookmark not defined. Staffing Plan—PPA Step 22 ....................... Error! Bookmark not defined. Management Team .................................. Error! Bookmark not defined. Sponsor .................................................. Error! Bookmark not defined. Sponsor’s Roles and Responsibilities ...... Error! Bookmark not defined. Appoint an Appropriately-Skilled Project Manager . Error! Bookmark not defined. Approve Project Charter, Task Plan, Estimate, Budget, and Schedule ........................................................... Error! Bookmark not defined. Champion the Project, Project Manager, and Project Team ............ Error! Bookmark not defined. Commit Time and Political Capital to the Project ... Error! Bookmark not defined. Conduct Formal Appraisals of the Project Manager’s Performance .. Error! Bookmark not defined. xi Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Empower the Project Manager with Appropriate Authority ............. Error! Bookmark not defined. Encourage Intelligent Disobedience ....... Error! Bookmark not defined. Ensure Sustained Buy-In at All Levels .... Error! Bookmark not defined. Ensure Timely Availability of Needed Resources ... Error! Bookmark not defined. Follow up to Ensure that Promised Benefits are Realized................ Error! Bookmark not defined. Formally Manage Project Scope ............. Error! Bookmark not defined. Keep Informed About Project Status ...... Error! Bookmark not defined. Keep the Team Out of Political Minefields ............ Error! Bookmark not defined. Provide Guidance and Direction for Key Business Strategies ........... Error! Bookmark not defined. Provide Feedback on Performance vs. Expectations ..... Error! Bookmark not defined. Resolve Major Policy Issues .................. Error! Bookmark not defined. Shield Project Teams from Unrealistic Customer Demands ............. Error! Bookmark not defined. Understand Project Complexity.............. Error! Bookmark not defined. Sponsor Self-Assessment ......................... Error! Bookmark not defined. The Forty Questions................................. Error! Bookmark not defined. Project Manager’s Supervisor.................... Error! Bookmark not defined. Functional Managers ................................ Error! Bookmark not defined. Project Manager ...................................... Error! Bookmark not defined. Project Manager’s Roles and Responsibilities ........ Error! Bookmark not defined. Soft Skills: ........................................... Error! Bookmark not defined. Negotiation .......................................... Error! Bookmark not defined. Positive Outlook ................................... Error! Bookmark not defined. The Business of the Business ................ Error! Bookmark not defined. Skills Gap Assessment .......................... Error! Bookmark not defined. Dumb Mistakes and Good Traits ............ Error! Bookmark not defined. How Many Projects Can a Project Manager Manage? ... Error! Bookmark not defined. Team Leader ........................................... Error! Bookmark not defined. Administrative Support ............................. Error! Bookmark not defined. Team Members ....................................... Error! Bookmark not defined. Team Selection .................................... Error! Bookmark not defined. To Clone or Not to Clone ...................... Error! Bookmark not defined. Team Recruitment ................................ Error! Bookmark not defined. Recruiting Interviews ............................ Error! Bookmark not defined. The Interview ...................................... Error! Bookmark not defined. Sample Questions................................. Error! Bookmark not defined. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved xii Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Making the Selection ............................ Error! Bookmark not defined. SMEs ...................................................... Error! Bookmark not defined. The Already-Assembled Team: What Should You Do? ..... Error! Bookmark not defined. Teamwork ............................................... Error! Bookmark not defined. Forming ............................................... Error! Bookmark not defined. Storming .............................................. Error! Bookmark not defined. Norming .............................................. Error! Bookmark not defined. Performing ........................................... Error! Bookmark not defined. Cross-Cultural Teams ............................... Error! Bookmark not defined. The Importance of Trust .......................... Error! Bookmark not defined. Recommended Team Behaviors ................ Error! Bookmark not defined. Resolving Conflicts ...................................... Error! Bookmark not defined. Define the Conflict ................................... Error! Bookmark not defined. Assess the Conflict ................................... Error! Bookmark not defined. Brainstorm .............................................. Error! Bookmark not defined. Decision Time .......................................... Error! Bookmark not defined. Team Motivation ......................................... Error! Bookmark not defined. Work....................................................... Error! Bookmark not defined. Responsibility .......................................... Error! Bookmark not defined. Achievement ........................................... Error! Bookmark not defined. Recognition ............................................. Error! Bookmark not defined. Advancement .......................................... Error! Bookmark not defined. I Can’t Hear You, It’s Too Dark in Here ..... Error! Bookmark not defined. Focus .................................................. Error! Bookmark not defined. Open Your Mental Door ........................ Error! Bookmark not defined. Patience .............................................. Error! Bookmark not defined. Don’t Step on Their Lines ...................... Error! Bookmark not defined. Keep Your Eyes Open ........................... Error! Bookmark not defined. Hold Your Horses ................................. Error! Bookmark not defined. Pencil to the Paper ............................... Error! Bookmark not defined. Healthy Competition ................................ Error! Bookmark not defined. Trouble in Paradise .................................. Error! Bookmark not defined. A Safe Project Environment ...................... Error! Bookmark not defined. Communications Plan—PPA Step 23 .......... Error! Bookmark not defined. Recipient ................................................. Error! Bookmark not defined. Mechanism .............................................. Error! Bookmark not defined. Messages ................................................ Error! Bookmark not defined. Telephone Messages ............................ Error! Bookmark not defined. Frequency ............................................... Error! Bookmark not defined. Project Notebook—PPA Step 24 ................ Error! Bookmark not defined. Characteristics of a Sound Project Plan ......... Error! Bookmark not defined. Comprehensiveness ................................. Error! Bookmark not defined. Uniqueness ............................................. Error! Bookmark not defined. xiii Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Unambiguousness.................................... Error! Bookmark not defined. Authoritativeness ..................................... Error! Bookmark not defined. Keeping Current ...................................... Error! Bookmark not defined. Summary.................................................... Error! Bookmark not defined. Questions and Discussion Points .................. Error! Bookmark not defined. Chapter 6 Launch Stage: Developing detailed Estimates.. Error! Bookmark not defined. Chapter 6: Launch Stage—Detailed Estimates ..... Error! Bookmark not defined. Objectives ...................................................... Error! Bookmark not defined. Overview ....................................................... Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. Detailed Estimates—PPA Step 25 .............. Error! Bookmark not defined. Range Values .......................................... Error! Bookmark not defined. Estimate Review Points ............................ Error! Bookmark not defined. Estimating Responsibility .......................... Error! Bookmark not defined. Computing Accurate Estimates: The Concept........... Error! Bookmark not defined. Task Types .............................................. Error! Bookmark not defined. Effort Driven Task ................................ Error! Bookmark not defined. Duration Driven Task ............................ Error! Bookmark not defined. Baseline Effort—Defined .............................. Error! Bookmark not defined. Creating a Baseline Effort Database .......... Error! Bookmark not defined. Effort Variance Factor (EVF) ........................ Error! Bookmark not defined. Skill Factor (SF) ....................................... Error! Bookmark not defined. Work Interruption Factor (WIF) ................ Error! Bookmark not defined. Losses Due to Multiproject Assignment (MPF).......... Error! Bookmark not defined. The Project Productivity Influencing Factor (PPIF) ... Error! Bookmark not defined. EVF Computed......................................... Error! Bookmark not defined. Impact of Skill Level .................................... Error! Bookmark not defined. Profiling the Unknown Team ........................ Error! Bookmark not defined. Computing Task Effort................................. Error! Bookmark not defined. Computing Task Duration ............................ Error! Bookmark not defined. Computing Project Duration ......................... Error! Bookmark not defined. Sponsor Effort ............................................ Error! Bookmark not defined. Management Effort ..................................... Error! Bookmark not defined. Project Management Effort ....................... Error! Bookmark not defined. Rework Reserve .......................................... Error! Bookmark not defined. Scope Growth Reserve ................................ Error! Bookmark not defined. Accounting for Reserves ........................... Error! Bookmark not defined. Time Losses Often Overlooked ..................... Error! Bookmark not defined. Cost Estimates ............................................ Error! Bookmark not defined. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved xiv Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Task-Based Estimating ............................. Error! Bookmark not defined. Compress the Critical Path ........................... Error! Bookmark not defined. Task-Based Estimating Example—Lessons Learned ..... Error! Bookmark not defined. PERT Estimating Methods ............................ Error! Bookmark not defined. Words to Avoid ........................................... Error! Bookmark not defined. Task-Based Estimating—A Summary ............ Error! Bookmark not defined. Developing a Historical Baseline Effort Database ......... Error! Bookmark not defined. Steps to Reduce Estimates .......................... Error! Bookmark not defined. Review Constraints and Obstacles ............. Error! Bookmark not defined. Reduce Scope.......................................... Error! Bookmark not defined. Split/Overlap Tasks .................................. Error! Bookmark not defined. Validate Task Dependencies ..................... Error! Bookmark not defined. Aggressively Manage Lag ......................... Error! Bookmark not defined. Improve Team Skills ................................ Error! Bookmark not defined. Use Overtime .......................................... Error! Bookmark not defined. Add Team Members ................................. Error! Bookmark not defined. Improve the Work Environment ................ Error! Bookmark not defined. Transfer Risk Responsibility ...................... Error! Bookmark not defined. Project Charter Review and Budget Approval—PPA Step 26 ............... Error! Bookmark not defined. Stage Gate No. 3 ........................................ Error! Bookmark not defined. Order of PPA Steps .................................. Error! Bookmark not defined. Summary.................................................... Error! Bookmark not defined. Questions and Discussion Points .................. Error! Bookmark not defined. Chapter 7 Execute Stage: Schedule, Track, and Control the Project .................................................Error! Bookmark not defined. Chapter 7: Execute Stage ................................... Error! Bookmark not defined. Objectives ...................................................... Error! Bookmark not defined. Overview ....................................................... Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. The Execute Stage ...................................... Error! Bookmark not defined. Project Management Software ..................... Error! Bookmark not defined. Project Schedule—PPA Step 27 ................. Error! Bookmark not defined. Schedule the Work .................................. Error! Bookmark not defined. Define Cross-Project Dependencies ....... Error! Bookmark not defined. Build Organization Calendar .................. Error! Bookmark not defined. Specify Team Member Information ........ Error! Bookmark not defined. Specify Team Member Calendars ........... Error! Bookmark not defined. Build a Task List ................................... Error! Bookmark not defined. Specify Task Assignments, Effort, and Duration .... Error! Bookmark not defined. xv Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Specify Lags......................................... Error! Bookmark not defined. Specify Floating Risk Contingencies ....... Error! Bookmark not defined. Specify Reserves .................................. Error! Bookmark not defined. Build Project Schedule .......................... Error! Bookmark not defined. Must-Do Dates ..................................... Error! Bookmark not defined. Validate the Schedule .............................. Error! Bookmark not defined. Business Cycles: Conflict Assessment ........ Error! Bookmark not defined. Window of Opportunity Assessment .......... Error! Bookmark not defined. Schedule Compression ............................. Error! Bookmark not defined. Crashing .............................................. Error! Bookmark not defined. Fast-Tracking ....................................... Error! Bookmark not defined. Budget Compression ................................ Error! Bookmark not defined. Establish Baseline Schedule and Budget .... Error! Bookmark not defined. Baseline Version Control System ............... Error! Bookmark not defined. Task Gantt Chart .................................. Error! Bookmark not defined. Resource Gantt Chart ........................... Error! Bookmark not defined. List of Deliverables .................................. Error! Bookmark not defined. List of Deliverable Owners ........................ Error! Bookmark not defined. List of Milestones ..................................... Error! Bookmark not defined. Scope Change Management ..................... Error! Bookmark not defined. Project Scope Management: Summary ...... Error! Bookmark not defined. Progress Review and Control—PPA Step 28Error! Bookmark not defined. Tracking Team Members’ Progress............ Error! Bookmark not defined. Project Status .......................................... Error! Bookmark not defined. Project Vital Signs ................................ Error! Bookmark not defined. Project Health Report ............................... Error! Bookmark not defined. Lines of Command and Frequency of Reporting ....... Error! Bookmark not defined. Look-Ahead Window ................................ Error! Bookmark not defined. Short-Term Forecast ............................. Error! Bookmark not defined. Long-Term Forecast ............................. Error! Bookmark not defined. Earned Value Management System ........... Error! Bookmark not defined. Earned Value Basics ............................. Error! Bookmark not defined. Cost Variance (CV) ............................... Error! Bookmark not defined. Schedule Variance (SV)......................... Error! Bookmark not defined. Cost Performance Index (CPI) ............... Error! Bookmark not defined. Schedule Performance Index (SPI) ........ Error! Bookmark not defined. Project Cost Forecasting ........................... Error! Bookmark not defined. Low-End Forecast ................................. Error! Bookmark not defined. High-End Forecast ................................ Error! Bookmark not defined. Rate of the Remaining Work ..................... Error! Bookmark not defined. Project Schedule Forecasting .................... Error! Bookmark not defined. EV of a Partially Completed Task .............. Error! Bookmark not defined. EV—The Bottom Line ............................... Error! Bookmark not defined. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved xvi Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Analytical Tools ....................................... Error! Bookmark not defined. Fishbone Diagram ................................ Error! Bookmark not defined. Affinity Diagram ................................... Error! Bookmark not defined. Nominal Group Technique (NGT) ........... Error! Bookmark not defined. Matrix Display ...................................... Error! Bookmark not defined. Reporting Project Progress ....................... Error! Bookmark not defined. Team Members to Project Manager ....... Error! Bookmark not defined. Project Manager to Functional Managers Error! Bookmark not defined. Project Manager to Her Manager ........... Error! Bookmark not defined. Project Manager to Sponsor .................. Error! Bookmark not defined. Steering Committee Update .................. Error! Bookmark not defined. Project Status Reports ............................. Error! Bookmark not defined. Exception Reporting ................................. Error! Bookmark not defined. Progress Review Principles ....................... Error! Bookmark not defined. Dealing with Deadlines ............................. Error! Bookmark not defined. Schedule Review .................................. Error! Bookmark not defined. Scope Review....................................... Error! Bookmark not defined. Budget Review ..................................... Error! Bookmark not defined. Quality Review ..................................... Error! Bookmark not defined. Worst Case Scenario ................................ Error! Bookmark not defined. Dealing with Troubled Projects .................... Error! Bookmark not defined. Troubled Project Assessment ....................... Error! Bookmark not defined. Analysis .................................................. Error! Bookmark not defined. Key Questions ...................................... Error! Bookmark not defined. Vital Signs ............................................ Error! Bookmark not defined. Decision .................................................. Error! Bookmark not defined. Action ..................................................... Error! Bookmark not defined. Deploy Recovery Plan ........................... Error! Bookmark not defined. Deploy Cancellation Plan ....................... Error! Bookmark not defined. Words for the Wise Project Manager ............ Error! Bookmark not defined. Stage Gate No. 4 ........................................ Error! Bookmark not defined. Summary.................................................... Error! Bookmark not defined. Questions and Discussion Points .................. Error! Bookmark not defined. Chapter 8 Implement Stage..............Error! Bookmark not defined. Chapter 8: Implement Stage .............................. Error! Bookmark not defined. Objectives ...................................................... Error! Bookmark not defined. Overview ....................................................... Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. Project Implementation and Closure—PPA Step 29 ... Error! Bookmark not defined. Prepare the Operations Group .................. Error! Bookmark not defined. Prepare the Customer .............................. Error! Bookmark not defined. Site Assessment ...................................... Error! Bookmark not defined. xvii Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Site Preparation ....................................... Error! Bookmark not defined. Security Infrastructure ............................. Error! Bookmark not defined. Project Implementation Office .................. Error! Bookmark not defined. Implementation Plan Basics ...................... Error! Bookmark not defined. Rolling Wave Implementation ................... Error! Bookmark not defined. Scope Verification .................................... Error! Bookmark not defined. Fine Tuning ............................................. Error! Bookmark not defined. Customer Support.................................... Error! Bookmark not defined. The Celebration ....................................... Error! Bookmark not defined. Process Assessment—PPA Step 30 ............ Error! Bookmark not defined. Ground Rules .......................................... Error! Bookmark not defined. Benefits .................................................. Error! Bookmark not defined. Key Players ............................................. Error! Bookmark not defined. Support Players ....................................... Error! Bookmark not defined. Agenda ................................................... Error! Bookmark not defined. Lessons Learned Database ....................... Error! Bookmark not defined. Project Closure ........................................ Error! Bookmark not defined. Chapter 9: Operation Stage .................Error! Bookmark not defined. Chapter 9: Operation Stage ................................ Error! Bookmark not defined. Objectives ...................................................... Error! Bookmark not defined. Overview ....................................................... Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. The Operation Stage ................................... Error! Bookmark not defined. Preparing for Project Operations .................. Error! Bookmark not defined. Operations Documentation .......................... Error! Bookmark not defined. Value-to-Business Assessment—PPA Step 31 ........... Error! Bookmark not defined. Operations Metrics—PPA Step 32 .............. Error! Bookmark not defined. Current System Retirement—PPA Step 33.. Error! Bookmark not defined. Summary.................................................... Error! Bookmark not defined. Questions and Discussion Points .................. Error! Bookmark not defined. Chapter 10: Project Portfolio Management ..... Error! Bookmark not defined. Chapter 10: Project Portfolio Management .......... Error! Bookmark not defined. Objective ....................................................... Error! Bookmark not defined. Overview ....................................................... Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. The Importance of the Project Portfolio ........ Error! Bookmark not defined. Project Portfolio—The Concept..................... Error! Bookmark not defined. Project Portfolio Structure............................ Error! Bookmark not defined. Ideas Portfolio ............................................ Error! Bookmark not defined. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved xviii Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Pre-Launch (Charters) Portfolio ................ Error! Bookmark not defined. Launch (Plans and Estimates) Portfolio ..... Error! Bookmark not defined. Execute (Development) Portfolio .............. Error! Bookmark not defined. Implement (Deployment) Portfolio ............ Error! Bookmark not defined. Operations Portfolio ................................. Error! Bookmark not defined. Suspended Project Portfolio ...................... Error! Bookmark not defined. Canceled Project Portfolio ........................ Error! Bookmark not defined. Portfolio Views ............................................ Error! Bookmark not defined. Portfolio Alerts—Early Warning Signals ......... Error! Bookmark not defined. Unaligned Project .................................... Error! Bookmark not defined. Duplicate/Overlapping Project .................. Error! Bookmark not defined. Breach of Vital Signs ................................ Error! Bookmark not defined. Unsecured System ................................... Error! Bookmark not defined. High Defect Rate ..................................... Error! Bookmark not defined. Supporting Project/System Nonperformance............ Error! Bookmark not defined. Strategy Fulfillment ..................................... Error! Bookmark not defined. Stage Gate Reviews .................................... Error! Bookmark not defined. Appointing a Portfolio Manager .................... Error! Bookmark not defined. Portfolio Management Software—Three Strikes and You are Out........... Error! Bookmark not defined. Frequently Asked Questions—Project Portfolio ManagementError! Bookmark not defined. Lessons Learned ......................................... Error! Bookmark not defined. Project Portfolio—Benefits ........................... Error! Bookmark not defined. Summary.................................................... Error! Bookmark not defined. Questions and Discussion Points .................. Error! Bookmark not defined. Appendix 1: Procurement Planning .....Error! Bookmark not defined. Appendix 1: Procurement Planning ..................... Error! Bookmark not defined. Objectives and Overview ................................ Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. Procurement Process ................................... Error! Bookmark not defined. Procurement Planning .............................. Error! Bookmark not defined. Fixed Price Contract.............................. Error! Bookmark not defined. Cost Plus Fixed Fee Contract ................. Error! Bookmark not defined. Time and Materials Contract ................. Error! Bookmark not defined. Unit Price Contract ............................... Error! Bookmark not defined. Modular Contract .................................. Error! Bookmark not defined. Solicitation Planning ................................. Error! Bookmark not defined. RFI ...................................................... Error! Bookmark not defined. RFQ ..................................................... Error! Bookmark not defined. RFP ..................................................... Error! Bookmark not defined. Solicitation .............................................. Error! Bookmark not defined. xix Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Full file at http://testbank360.eu/solution-manual-project-management-forinformation-technology-business-and-certification-1st-edition-kapur Source (Contractor/Supplier) Selection ...... Error! Bookmark not defined. Contract Negotiation and Approval............ Error! Bookmark not defined. Contract Administration ............................ Error! Bookmark not defined. Contract Closeout .................................... Error! Bookmark not defined. SLA ..................................................... Error! Bookmark not defined. Performance is in the Mind of the Beholder .. Error! Bookmark not defined. Procurement Words of Wisdom .................... Error! Bookmark not defined. Appendix 2: Financial Analysis ............Error! Bookmark not defined. Appendix 2: Financial Analysis ............................ Error! Bookmark not defined. Objectives and Overview ................................ Error! Bookmark not defined. Details ........................................................... Error! Bookmark not defined. Whose Project is it Anyway? ........................ Error! Bookmark not defined. Principles and Practices of Financial Justification for Projects ................ Error! Bookmark not defined. NPV ........................................................ Error! Bookmark not defined. IRR ......................................................... Error! Bookmark not defined. ROI......................................................... Error! Bookmark not defined. Payback Period ........................................ Error! Bookmark not defined. Intangible Benefits ...................................... Error! Bookmark not defined. Garbage in and Garbage Out ....................... Error! Bookmark not defined. Risk Exposure and Financial Analysis ............ Error! Bookmark not defined. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved xx Preface PREFACE This instructor’s guide provides a summary of the content of all the chapters and sections of the “Project Management for Information, Technology, Business and Certification”1 textbook. It highlights the key points of each section of the book and offers suggestions regarding instruction. A full index to the content of the textbook is included. All summaries are keyed to the pages in the textbook and to the appropriate, accompanying slides. You may find it beneficial to use this guide in conjunction with the chapter questions provided in the textbook and with the additional set of questions provided in the supplemental material. Gopal K. Kapur: Project Management for Information, Technology, Business, and Certification. Upper Saddle River, NJ: Pearson Education, 2005 1 CHAPTER 1 INTRODUCTION Chapter 1: Introduction Chapter 1: Introduction Objectives In this chapter, students will learn about the following project management elements (Slides 1.1-1.2): 3 Reasons for project management Definition of a project Project vs. operations Roles of schedule, scope, budget, and quality Definition of project management Differences between a project and a process The state of project management Extreme project failures The "seven deadly sins" of project management Reasons why project management investments may never payoff The success equation Project management methodology Project Process Architecture (PPA) Stage gate reviews Mapping PPA to PMBOK Mapping PPA to CompTIA IT Project+ Understand SEI's Capability Maturity Model Product development methodology Celebrating project success The mocking post Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Chapter 1: Introduction Overview The chapter starts with a discussion of why project management is necessary to transform ideas into products or processes in an effective and efficient manner. It compares and contrasts project work with day-to-day operations and outlines the key differences between the two. Next, the chapter deals with the important subject of extreme project failures, far too common in IT/Business projects, and the Seven Deadly Sins that lead to such failures. The content includes a detailed discussion of how the principles, practices, and tools for managing IT/Business projects are different from those needed to manage engineering (construction) projects. The chapter also introduces the Project Process Architecture (PPA), a project management methodology designed by the Center for Project Management (CPM or the Center) that retains the applicable principles and practices of classic engineering project management and adds the principles and practices needed to manage IT/Business projects successfully. The chapter maps the PPA to the Project Management Institute's (PMI's) Project Management Book of Knowledge (PMBOK), to CompTIA's IT Project+ certification, and to Software Engineering Institute's (SEI's) Capability Maturity Model Integration (CMMI). Finally, the need for professionalism and discipline throughout the organization is emphasized, along with the introduction of a mocking post for those who wish to sidestep the project management discipline put forth in this book. Details Why Project Management? As evidenced by the quotes in this section, ideas and visions are worthless without the ability to transform them into reality. Project management is the discipline that facilitates that transformation. Slides: 1.3 Pages: 2-3 What is a Project? A project is generally undertaken to solve a business problem or capitalize on a business opportunity. It represents an investment, must have appropriate ownership, and signals a change in the status quo. It is of specific duration. It has a plan, which includes an interrelated set of deliverables, tasks, and milestones to be completed by designated resources. Projects generally operate in changing environments and are disruptive, especially for the project’s customers. Slides: 1.4 Pages: 3-4 Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved 4 Chapter 1: Introduction Project vs. Operations A project represents change, while day-to-day operations involve repeatable processes with consistent, predefined outcomes. Slides: 1.5 Pages: 4-5 It’s not a “Three-Legged Stool” Traditional project management approaches have defined the basic components of a project as schedule, scope, and budget. In the PPA, quality—because of its importance— is singled out as a fourth component. Slides: 1.6 Pages: 5-6 When Does Work Turn into a Project? As an overall guide, work requiring more than 200 hours of effort should be managed as a project. Slides: 1.7 Pages: 6 What is Project Management? Project management involves five key activities: Slides: 1.8 Pages: 6-7 1. Defining 2. Planning 3. Estimating and scheduling 4. Directing and leading 5. Monitoring and controlling It also involves: 6. Communications 7. Closure Project Management is not a Tool Well-formulated, disciplined and forthright project management practices are the essential ingredient in project success. Project management software tools can facilitate success if these practices are in place. The use of project software tools, without sound practices, is a waste of time and money and not likely to lead to success. Slides: 1.9 Pages: 7 The State of Project Management Studies show staggering numbers for the failure of IT projects in the public and private sectors. Not only have short-term losses occurred; long-term losses impacting strategy, market position, opportunities, credibility, and Slides: 1.10 Pages: 7-8 5 Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Chapter 1: Introduction human capital have also been observed. Extreme Project Failures Still another study details 10 US companies that lost millions, including two that filed for bankruptcy. A CPM study conducted through the 1990’s detailed 13 key reasons for the high rate of failure. Slides: 1.11-1.12 Pages: 8-9 The Seven Deadly Sins of Project Management A more focused CPM study involving seven CIOs, 23 project managers, and 49 projects resulted in the list of “Seven Deadly Sins of Project Management,” released in the Gartner “Talking Technology Series.” Slides: 1.13-1.21 Pages: 9-16 1. Mistaking half-baked ideas for projects 2. Dictated deadlines 3. Ineffective Sponsorship 4. Under-skilled project managers 5. Failing to monitor the vital signs 6. Failing to deploy a sound project management methodology 7. Not formulating a comprehensive project portfolio A “Sin Index” can be calculated by scoring an organization on the various “sins.” Organizations are rated from “Project Nirvana” to “Project Hell.” Why Your Project Management Investment may Never Pay Off. Investment in project management practices designed for classic, engineering projects may not lead to success in IT/business projects. This section details 31 attributes that differ significantly between engineering and IT/business projects. Slides: 1.22.1.28 Pages: 17-31 The Success Equation Success = (Process + Skills + Techniques + Tools) X Slides: 1.29 Pages: 31-33 Accountability X Discipline Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved 6 Chapter 1: Introduction The Project Process Architecture (PPA) The PPA is a robust, well-defined project management process. Affording an accelerated pace, without sacrificing key steps, it is in extensive use by CPM clients in a wide cross section of industries. Slides: 1.30-1.36 Pages: 33-35 The PPA has six “stages” and 36 “steps” and was designed to be scalable to projects of all sizes, complexity, and importance. Idea Stage Purpose: Assess ideas for integrity Output: Project request Pre-Launch Stage Purpose: Analyze project request to determine whether it should be pursued, considering scope, risk, and expected cost. Output: A project charter for review and approval by the project sponsor. Launch Stage Purpose: The development of a comprehensive plan and detailed estimates for the project. Output: Project plan, including detailed estimates. Execute Stage Purpose: Schedule and perform the planned work, monitor progress, solve problems, and keep the project on track. Output: The completed product or process. Implement Stage Purpose: To turn the product or process over to the customer, close out the project, and conduct a project management process assessment. Output: The completed project. Operation Stage Purpose: To assess the value-to-business, operations metrics and, if applicable, current system retirement—after 7 Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Chapter 1: Introduction the project’s product or process is in full operation. Output: Value-to-business assessment and fine-tuning. Stage Gate Reviews: A “Stage Gate” review is held at the end of each PPA stage to make a go/no-go decision to proceed to the next stage. This review process serves to “progressively” elaborate project details. Slides: 1.37-1.38 Pages: 35-37 Tailoring the PPA A suggested approach for tailoring the PPA to project size and complexity (to be defined in Pre-Launch) is offered. Recommended steps for varying complexities are shown in the table on page 37. Mapping the PPA to PMBOK The “Project Management Body of Knowledge (PMBOK)” is a collection of project management material prepared by the Project Management Institute (PMI).” PMI is a nonprofit, international, professional project management organization. It offers professional certification in project management. Slides: 1.39-1.41 Pages: 37-40 As its title implies, the PMBOK is a guide to “what” needs to be done in successful project management. The PPA includes the “what” in a step-by-step “how-to” framework. The table on page 39 shows how the nine knowledge areas and PMBOK component processes map to the PPA. The bottom line is that the PPA incorporates the vital areas of the PMBOK. CPM is an official PMI Global Registered Education Provider. Mapping the PPA to CompTIA Project+ The Computing Technology Industry Association (CompTIA) also offers an industry-wide certification in project management (IT Project+). CompTIA is the world’s largest developer of vendor-neutral, industry-defined IT exams and certifications. Slides: 1.42 Pages: 40-41 The tables on pages 40-42 detail how the elements of the PPA™ relate to the domains and objectives of CompTIA Project+. Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved 8 Chapter 1: Introduction Again, the bottom-line is that the PPA maps well to the CompTIA framework. CPM has received the CompTIA Approved Quality Curriculum (CAQC) certification, signifying that the curriculum prepares the student for IT Project+ certification. Mapping the PPA to SEI’s CMMI The Capability Maturity Model Integration (CMMI)was prepared by Carnegie-Mellon’s Software Engineering Institute (SEI). It is designed to guide software developers on a path through five levels of process “maturity:” Slides: 1.43 Pages: 41-44 1. Initial 2. Repeatable 3. Defined 4. Managed 5. Optimized Once again, the PPA dovetails very well with the CMMI approach. A repeatable project management process is necessary at all levels above level one, where processes are ad hoc and chaos may prevail. Product Development Methodology There is a critical distinction between project management methodologies and product (or process) development methodologies. It is important to recognize the difference and to keep the two separate. Slides: 1.44 Pages: 44-45 Project management methodologies, such as the PPA, provide an overarching structure, containing the steps necessary to successfully manage the project. Product development methodologies (often called life cycles) define the specific tasks and milestones needed to develop the product. Subject to scaling and tailoring, the project management methodology will remain constant from project to project, while the development methodology will vary widely (e.g., software development, staging a large conference, introducing a new business process, etc.) The product/process development methodology comes into play in the PPA most strongly as detailed tasks to 9 Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Chapter 1: Introduction complete the project are planned and executed. This begins in the PPA launch stage. Celebrating Project Success Celebration of project successes, along the way and at the conclusion of a project, is an important form of recognition for all involved. Rewards and gestures of appreciation should come from project managers, sponsors, and customers. Slides: 1.45 Pages: 45-46 It’s the Other Leg, Stupid. The title of this section comes from a story about a surgeon amputating the wrong leg from a patient. It is used to address the question of the culture within an organization. Slides: 1.46 Pages: 46-47 The argument is that the wrong amputation stemmed from a culture that was absorbed in its own beliefs and viewed the customer with a certain disdain. A series of questions are offered to help assess culture in an organization; they are particularly important to address at project staging. The questions probe deference to seniors, fear to say “no,” looking down on customers, devaluing process in favor of deadlines, unresolved issues, and the use of sound communication skills. Organizational Discipline and Individual Skills Organizational project management discipline is vital in project management success. Development of individual skills, alone, will not necessarily lead to project management success. The organization must fully support the project management approach and back up that support with actions to make it work. Slides: 1.47 Pages: 48-49 In cases where organizational discipline is lacking, it is crucial that project managers, working with sponsors, advocate the instilling of such discipline. The Mocking Post The author suggests an apt punishment for sponsors and others who misbehave, called a “mocking post.” The offender is gently strapped to the post and others are allowed to mock and throw things (non injurious) at him/her! Slides: 1.48 Pages: 49 Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved 10 Chapter 1: Introduction Summary The learning objectives of the chapter are reviewed. Slides: -Pages: 49-50 Questions and Discussion Points Questions and discussion points for the chapter are offered. Slides: -Pages: 50 We suggest that you select a number of questions from the set, assign them to student groups, and ask the groups to discuss and respond to the questions. This will enhance group interaction and validate comprehension of the materials presented in the chapter. 11 Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved Chapter 1: Introduction Chapter 2 Fundamentals Instructor Guide 1.1 ©2005 Center for Project Management, All Rights Reserved 12