Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1506 Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Date PID Prepared Estimated Date of Appraisal Authorization Estimated Date of Board Approval Third Jiangxi Highway Project EAST ASIA AND PACIFIC Roads and highways (100%) P093906 PEOPLES REPUBLIC OF CHINA [X] A [ ] B [ ] C [ ] FI [ ] TBD (to be determined) April 4, 2005 December 23, 2005 May 30, 2006 1. Key development issues and rationale for Bank involvement Background. The Government of China is committed to developing an efficient multi-modal transport system to enhance competitiveness and promote development. At the core of these programs is the National Trunk Highway System (NTHS), comprised of 13 major expressway corridors connecting all provincial capitals and main cities. The initial NTHS backbone has made great progress towards providing the core network connectivity. The development is now shifting towards linking poorer western regions with eastern China, the engine of China’s economic growth. Jiangxi is a land locked province in south central China with a population of over 40 million. It is one of the lagging regions in China by every standard: (i) 32 counties out of total 99 counties and cities in Jiangxi province have been identified as poor; and, (ii) among which 21 are classified as national level poverty counties. Ganzhou City Prefecture is the largest prefecture and accounts for 24% (39,600 km2) of the Jiangxi province. Located in the south of the province, it is a highly mountainous area. Most poor counties of the province are located in Ganzhou City Prefecture. With a population of 8.3 million, the prefecture has agricultural, mineral and manufacturing industries. The citrus industry, already annually exporting over 350,000 tons, is undergoing rapid expansion. There is significant potential for growth in the mining industries due to the high levels of non-ferrous and rare earth metals in the area. The need for improved high grade access to key facilities. Lack of transport accessibility is one of the constraints to the social and economic development of these southern landlocked mountainous areas. The Ruijin-Ganzhou Expressway (RGE) is planned to link Ganzhou and the area east to an expressway currently under construction in Fujian province. This will provide a high quality transport link to the coastal port and international airport at Xiamen (Fujian province). In the future, the network will continue to develop westwards, eventually connecting with Kunming (Yunnan province) and Chengdu (Sichuan province). The need for improved local road access to markets and services. The Ganzhou City Prefecture is poorly served by local roads. Local roads, Class IV, and unclassified roads, account for about 75% of the total mileage (61,860 km) of the road network in the province; and more than half of these roads are unpaved. The need for improved sector management. The previous two Bank highway projects have helped the Jiangxi Provincial Communications Department (JPCD) improve their operations in a number of key areas, such as safety and road maintenance, however, more needs to be done. There is a need to further improve planning and safety processes at JPCD as well as to assist them implementing better quality assurance. There is also a need to improve the delivery of HIV/AIDS education in the sector. Rationale for Bank involvement. The East-West linkages of the NTHS are critical for China’s lagging region development and to attain the full benefit of the NTHS network connectivity. The RGE will be a key contributor to the development of NTHS and to stimulate trade lead growth in a landlocked poor province of China. It will further strengthen regional integration and competitiveness of the Jiangxi province and its neighbors. The local roads improvement program will address the needs of the poor and disadvantaged people within Ganzhou prefecture. The project will build on the previous institutional strengthening activities to assist the JPCD to manage the road network effectively. The project will address key areas, including safety, quality assurance, maintenance and HIV/AIDS. Of particular value will be the assistance of the Bank in facilitating co-ordination between the central, provincial and local governments to ensure that the provincial highway development is supportive of the local development plans and their objectives. The project therefore contributes to the sector related CAS objectives of facilitating trade, improving regional and market integration, and fostering the development of lagging Western Regions. This will be achieved by enhancing highway sector management and lowering of transportation costs. 2. Proposed objective(s) The project’s development objective is to improve east-west passenger and freight flows in poorer areas of Jiangxi province through enhanced road infrastructure conditions and strengthened highway management. 3. Preliminary description Expressway Component: Ruijin – Ganzhou Expressway (RGE) The RGE will be a 119 km long section (about US$660 million) of the Xiamen – Chengdu expressway, one of the seven east-west corridors of the NTHS. It will connect Ganzhou in the west with the Guangdong – Beijing expressway. In the east it will terminate at Ruijin city. A 28 km, domestically financed, expressway will be built between Ruijin and the Fujian provincial border. With the completion of the expressway, and the link between the Fujian border and Xiamen (under construction), Ganzhou will have direct high quality access to Xiamen. The area crossed by RGE is a succession of three basins separated by mountains: the Ganzhou basin (100 m of altitude), the Yudu basin and the Ruijin basin (200 m of altitude). Between these basins the mountains are high, some exceeding 1,000 m of altitude. The main river between Huichang and Ganzhou is the Gong. In Ganzhou, the Gong River becomes the Gan River. The Gong river links the Ganzhou basin with the Yudu basin via a narrow valley. The terrain is very challenging and will require careful route selection and designs so as to minimize the environmental and social impacts while providing adequate access to local communities. Local Road Improvement Program Component The Local Road Improvement Program (LRIP) of approximately US$70 million, will aim to improve access in poor areas of the province. The size of the LRIP will be at least 10% of the total project cost and the amount of the Bank financing shall be approximately US$ 10 million. Ganzhou, the largest prefecture in the province, is the priority area for the LRIP, and is where the expressway component will be built. Currently its road network density is about 23 km/100 km2, about 38% lower than the average road density (37 km/per 100 km2) in the province. Among the total mileage of 11,544 km in Ganzhou City Prefecture, 8,901 km of roads are Class IV or unclassified, some 2% lower than the average technical standard in the province. As one of the poorest prefectures with lowest densities of road network in the province, the LRIP component will support high priority needs of local access. Institutional Strengthening Component The institutional strengthening component (about US$2 million) is still under development but potential activities include: Traffic safety operations for tunnels. The JPCD has undertaken a number of safety activities on previous projects. Although they have not had major accidents in tunnels, they are acutely aware of the potential dangers they pose, especially as they may result in closure for an extended period. They would like to establish a systematic tunnel safety management plan and ensure that there are adequate resources to handle emergencies. Improved quality assurance techniques. There have been a number of quality issues with previous projects so the JPCD recognizes the need to improve their overall quality management. Extension of maintenance by contract to expressways. The JPCD recognizes that there are potential cost savings through improved efficiencies by extending maintenance by contract to expressways. HIV/AIDS. Discussions are under way to having a component looking at HIV/AIDS education for all JPCD workers and their families. This would be funded in a large part by the Global HIV campaign. 4. Safeguard policies that might apply Environmental Assessment (OP/BP 4.01) This project is expected to be assigned an EA category A. The JPCD and its Environmental Consultant (the Highway Environmental Engineering Research Center (HEERC) of the Ministry of Communications (Beijing) prepared the TOR for the preparation of the EIA and EMP for the proposed Expressway. The TOR was reviewed by the Bank team during the identification mission and the Team’s comments were discussed with the JCPD. The TOR, which incorporates the first round of public consultation, was submitted to SEPA on December 30, 2004. By the end of April 2005, the JPCD will submit to the Bank the final revised TOR inclusive of the comments from SEPA, the Bank and the consultation. The mission held lengthy discussions with JPCD’s EA Consultants, emphasizing the Banks requirements and expectations of the consideration of the environmental and resettlement issues in the comparisons and selection of the final alignment; meaningful consultations of all stakeholders (local government officials, potentially affected people, etc.) and the timely disclosure of the EIA, EMP and the Resettlement reports locally and in the Bank. JPCD and its Consultant has also agreed to prepare separate stand-alone EA reports (combined EIA/EMP reports) for all “linked” local roads 10 km and over in length. For roads under 10 km, the EIA/EMP will be consolidated in the main EA reports. The chosen alignment will generally pass through mountainous areas and cross river systems and valleys in Jiangxi Province. Therefore, the expressway will comprise of many tunnels, viaducts, large interchanges and many local roads. While the determination of the final alignment and the design is expected to consider environmental issues, notwithstanding, significant adverse impacts are to be expected of any chosen alignment. Construction related impacts are likely to include potential disturbance to the ecosystem, excavation and disposal of excess waste materials from tunnels and cuts, impacts on the water ecosystems due to bridge construction, impacts from excavation for fill material and aggregates, spoil transportation and disposal, slope stability, erosion and sedimentation flows, water quality, fuel and lubricants management, noise, dust, worker camps, etc. Impacts during operations of the expressway are expected to be mainly noise related, traffic and public safety, and air quality in tunnels. The EAs will investigate these issues and will identify suitable and tangible mitigation, monitoring, and institutional measures and estimate the budget to ensure effective implementation, management and monitoring of these impacts. Involuntary Resettlement (OP/BP 4.12) The first Chinese draft of the EIA/EMP for the Expressway is expected by May 15, 2005. The second draft is expected on September 1, 2005. Involuntary resettlement is expected. Among the many factors determining the choice of the final alignment, is the absolute need to minimize resettlement as mush as possible. The JCPD is firmly committed to apply the principles of OP4.12 where persons/communities are affected by resettlement not only for the expressway, but also for all linked local roads. RAPs and an RPF are being prepared and will be submitted to the bank for approval by April 15, 2005. Natural Habitats (OP/BP 4.04) Preliminary investigations along the alternative alignments indicate that the Natural Habitat OP will not be triggered. So far, the investigations have not identified any natural habitats, protected forests, sensitive habitats, nature reserves or parks along or in the vicinity of the proposed alignments. This will be studied in more detail during the preparation of the EIA. Indigenous Peoples (OD 4.20) The JCPD is conducting a Social Assessment, which will confirm the presence of ethnic minorities in the project area. The JCPD is committed to applying the principles of OD 4.20 where issues affecting ethnic minorities (should they exist in the project area) arise, and will prepare and submit to the Bank for approval an EMDP should it become necessary. 5. Tentative financing Source: BORROWER INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT ($m.) 532 200 Total 6. Contact point Contact: Christopher R. Bennett Title: Senior Transport Specialist Tel: 1-202-473-0057 Fax: 1-202-522-3573 Email: [email protected] 732