Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
OPSCOM-2 METERON Experiment OPSCOM-1 Experiment Commanding network CGBA5 T61p DTN network DTN Node VPN ISS ESOC DTN GW HOSC (Huntsville) MOCUP1 IF ET-Talker MOCUP2 IF METERON GSE BUSOC (Brussels) ET-Talker BioServe (CU Boulder) CGBA5 GSE MOCUP1 ESOC (Darmstadt) MOCUP2 DTN-Laptop Setup for OPSCOM-1 EXPRESS RACK 2 (USL) 1553 packets EXPRESS RACK 1 (USL) LAN Downlink Packets RIC RIC LAN (RIC) TCP/IP Packets CGBA4 CGBA5 LAN Rack-Rack Packets PEHB LAN-0 PEHB PL PL LOCAL BUS PL-2,PL-APM TO/FROM PL MDM TO/FROM PEHG DTN: Delay Tolerant Network LAN: Local Area Network MDM: Multiplexer/Demultiplexer PEHB: Payload Ethernet Hub Bridge PEHG: Payload Ethernet Hub Gateway PL: Payload UIP: Utility Interface Panel Reforwarded RIC TCP/IP Packets LAN-0 LAN-2 UIP RACK UIP (COL) (TBD) POWER SUPPLY J47 120VDC DTN LAPTOP 4 OPSCOM-1 Notes • Experiment was performed using CGBA as a proxy onboard to route traffic to the METERON laptop • Cu-Boulder’s ground site was also used to proxy DTN traffic to ESA – No ACS was used for this experiment – Custody Transfer was not used for this experiment OPSCOM-2 Approach VPN T61p T61p HK & Maintenance DTN Link ISS DTN-NODE ESA DTN GW HOSC ESTEC EGP DTN SITH BUSOC EGP (EGNC) RoverIFA ET-Talker METERON GSE BACKUP MOCUP ESOC Figure 1: Connect ivit y Scenario 1 Proposed DTN-Laptop Setup for OPSCOM-2 DTN LAPTOP 1553 packets LAN Downlink Packets RIC LAN (RIC) TCP/IP Packets LAN Rack-Rack Packets PEHB TO/FROM PL MDM TO/FROM PEHG LAN-0 POWER SUPPLY 120VDC LOCAL BUS PL-2,PL-APM LAN-2 DTN: Delay Tolerant Network LAN: Local Area Network MDM: Multiplexer/Demultiplexer PEHB: Payload Ethernet Hub Bridge PEHG: Payload Ethernet Hub Gateway PL: Payload UIP: Utility Interface Panel 7 METERON Laptop Configuration • OPSCOM-2 will be executed in 3rd annual quarter 2014 – Custody Transfer will be enabled – ACS will also be used for this experiment • The METERON ISS Laptop will need to be reconfigured to route directly to HOSC DTN Node – ESA has access to this load and will make the configation changes for the onboard laptop – ESA will also need to make similar configuration changes to the DTN node located at B.USOC – MSFC will make the necessary database modification to route the redefined ESA bundles and data appropriately – MSFC will provide ESA with a Payload Rack Checkout Unit (PRCU) to verify the changes in a high fidelity test environment