MOSFIRE Status Update Bob Weber 27 January 2010 COO All-Hands Meeting MOSFIRE Overview • Multi-Object Spectrometer for Infra-Red Exploration • CIT, UCLA, UCSC, Keck collaboration • NIR multi-object spectroscopy over 6.1’ x 6.1’ FOV; up to 46 objects simultaneously • Wavelength coverage: 0.9-2.5 µm (Y, J , H & K) • Commissioning: Keck 1 Cass by end of 2010 2 27 January 2010 Recent Progress Summary • 3rd cool down completed successfully – Cold alignment confirmed – Installed mechanisms (FCS, Grating Turret, Pupil Mechanism, CSU) operated successfully in all gravity orientations • All science optics successfully mounted & aligned – – – – All lenses aligned & bonded into cells (except field flattener) Camera barrel assembled Collimator barrel ready to be assembled Science flats aligned & bonded 3 27 January 2010 MOSFIRE Cold Alignment Check 4 27 January 2010 MOSFIRE Mechanisms CSU during bench tests Grating Turret installation 5 27 January 2010 Lens Mounting Camera Lens #4 Installed Camera Barrel Assembled 6 27 January 2010 Current Activities • 4th cool down preparations – Re-check cold alignment w/ science flats – More mechanism tests • Detector head cold tests – Focus mechanism tests (cold @ UCLA) – Install detector – Field flattener installation 7 27 January 2010 Current Activities (Cont.) • Filter wheel cold tests – Wheel detent design modifications necessary – Cold tests in test chamber before 5th cool down • Guider assembly & alignment check – Assemble to front end cap – CMM metrology & adjustment – Alignment check w.r.t. instrument axis during 4th cool down 8 27 January 2010 Platform & Hexapod structures for alignment checks 9 27 January 2010 Looking Forward • 5th cool down (late March) – – – – Install all optics Install all remaining mechanisms Install science detector Optical tests • 6th cool down (May) – Flexure mapping • 7th cool down (late June) – Acceptance tests? • Pack & Ship (July-August?) • Commissioning (September?) 10 27 January 2010 IRMS InfraRed MultiSlit Spectrometer for TMT Bob Weber 27 January 2010 COO All-Hands Meeting 11 27 January 2010 Overview • IRMS is envisioned as “clone” of MOSFIRE • Fed by NFIRAOS • Three modifications required for TMT: – Alter mounting to attach to NFIRAOS – Alter field lens prescription for TMT – Alter guider system to OIWFS (on instrument wave front sensing) 12 27 January 2010 Current Status • TMT preparing SOW for Conceptual Design Study • Design study period: (late 2010 thru early 2011) • UC Riverside is the design study lead • COO’s contribution (~$100K): – Design & cost required modifications to MOSFIRE – Develop schedule & cost to completion 13 27 January 2010 COO’s Future in IRMS? • The IRMS team remains undefined • This is substantially a fabrication, procurement, and I&T project. To keep IRMS costs minimal, we have suggested that: – COO participates in project engineering/management – Mechanical re-design done by COO – I&T tasks should be done at CIT (infrastructure & experience exist) 14 27 January 2010