Download Glenn Ballard, Collaboration and Competition

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
Collaboration and Competition
Glenn Ballard
AOM 2010
Montreal, Canada
How maintain productive tension between
collaboration and competition?
• Externally imposed demands
• Self-imposed goals
“Lower the river to reveal the rocks.” (Taiichi
Ohno, Chief Engineer, Toyota)
2005
CURRENT
Proposed Building Area:
1,298,500 BGSF
914,757 BGSF
Number of Stories (incl.
below grade Parking and
CUP):
21
18
Total No. of Beds:
620
555
Total No. of LDRs:
24
24
Total No. of ORs:
19
19
Total No. of ER Treatment
Rms:
34
34
Loading Dock Location:
Access off Post St.
Access off Franklin St.
Ambulance Location:
Access off Franklin
St.
Access off Post St.
Total No. of Parking
Spaces:
620
555
90% of the program in 70% of the space.
Initial target cost for construction=$911 million, 14% below market
Innovation – Making Creativity and Learning Safe
The “Patient Boom” – Combined Patient Lift and Medical Boom