Download ATF2 Magnets & PS lessons learned

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Three-phase electric power wikipedia , lookup

Audio power wikipedia , lookup

Electrical substation wikipedia , lookup

History of electric power transmission wikipedia , lookup

Standby power wikipedia , lookup

Voltage optimisation wikipedia , lookup

Electrification wikipedia , lookup

Islanding wikipedia , lookup

Electric power system wikipedia , lookup

Alternating current wikipedia , lookup

Power over Ethernet wikipedia , lookup

Integrated circuit wikipedia , lookup

Rectiverter wikipedia , lookup

Electrical engineering wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Mains electricity wikipedia , lookup

Telecommunications engineering wikipedia , lookup

Power engineering wikipedia , lookup

Electronic engineering wikipedia , lookup

AC adapter wikipedia , lookup

Transcript
ATF2
Magnets
Lessons learned from designing, fabricating &
installing ATF2 magnets and their power
supplies that should be remembered for same
tasks for the ILC’s BDS
Cherrill Spencer, SLAC. Member of ATF2 Magnet Team
Briant Lam, SLAC. ATF2 Power Supply Engineer
KNU,Korea ATF2 mtg
Spencer & Lam SLAC
Lessons learned
1
ATF2
Magnets
Lessons learned and comments on ATF2
magnet engineering, fabrication & installation
• Integration of magnets with rest of beamline apparatus needs
attention of fulltime integration engineer from early-on in project
• Beamline installation drawings showing all beamline devices and
their supports and their precise locations must be made before
installation starts
• BDS will have magnets with tight harmonic & stability tolerances,
avoid using old magnet designs or actual old magnets as they will
rarely match the ILC requirements, quality will be compromised &
money won’t be saved in the end
• Different countries have different standards and rules regarding
magnet fabrication & integration. ILC-wide magnet group must
develop, promulgate and enforce design + fabrication standards;
integration rules (e.g. can a beampipe touch a magnet’s poletips?)
• If choose to have magnet vendors “build to spec” rather than “build
to print” then must carefully review vendor drawings before they start
fabrication & have on-going visits by ILC magnet engineer to their
factory (later is best practice even if building to ILC-provided drawings)
• Have regular engineering meetings just on magnet issues via webex
KNU,Korea ATF2 mtg
Spencer & Lam SLAC
Lessons learned
2
ATF2
Magnets
Lessons learned and comments on ATF2 power
supply engineering, fabrication & installation
• Understand the AC power grid of the lab where magnet PSs to be
installed.
– Neutral line on 3 phase power at KEK not available [used in a ground
current detection circuit], SLAC sent bulk PS needing neutral
• Do not daisy chain extension cords; do not put too many devices on
one circuit
– Japan uses 100V AC at 50Hz, USA uses 120V AC at 60 Hz. Most 120V
devices can deal with 100V, but daisy chaining etc causes ATF2 line
voltage to drop to 80 V- then equipment misbehaves or fails.
• Keep Memoranda of Understanding up-to-date, have clear
agreements on property transferrals
– Donating the 44 brand new redundant PSs was impossible because not
enough time to get all approvals and do paperwork
• Allow remote data acquisition so distant engineers can monitor the
performance of the power supplies they designed and built and
troubleshoot operating problems more effectively
– A remotely accessible electronic logbook would help distant magnet &
PS engineers monitor repeating problems and track reliability
KNU,Korea ATF2 mtg
Spencer & Lam SLAC
Lessons learned
3