Survey							
                            
		                
		                * Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Accelerator and proton beam Masahito TOMIZAWA and Satoshi MIHARA Outline  Proton Acceleration  Extraction/Transport  Experimental Area 2 Proton Acceleration Requirements on the Proton Beam     Beam Energy and power: 8GeV, 56kW(7mA) Bunch width and bunch-bunch spacing:~100nsec, ~1msec Extinction: <10-9 Bunched slow extraction (slow extraction w/o switching off acceleration RF cavity) Proton Acceleration  Nominal scheme  RCS: h=2  MR:h=9  8 buckets filled  1 empty bucket, used for kicker excitation  MR RF cavities are designed for this scheme  h=18 optional by removing capacitors on cavities  Need long shutdown to change the configuration 8 filled buckets out of 9 buckets Proposed Scheme (I)  RCS: h=2 with one empty bucket  MR:h=9 with 5 empty buckets  Bunched slow extraction  Slow extraction with RF cavity ON, 210kV Realization of an empty bucket in RCS by using the chopper in Linac •Simple solution •No need of hardware modification •Heavier heat load in the scraper •Possible leakage of chopped beam in empty buckets High-frequency Chopper Proposed Scheme (II) & (III) Space charge tune shift is half of (1)  Longitudinal emittance is twice of (1)  NO EMPTY BUCKET IN RCS  RCS RF system needs minor modification (low level RF)  NO EMPTY BUCKET BOTH IN RCS AND MR  Space charge tune shift is half of (1)  LARGE MODIFICATION OF MR RF  SYSTEM IS NECESSARY  Long bunch Proton Acceleration Prospect  Try scheme (I) first for an extinction study  No hardware modification is necessary  Investigate  Time structure of the proton beam  Heat load at chopper  RF voltage while extraction  Scheme (II) may be able to be tested if h=1 operation of RCS is realized for MR intensity upgrade  Check how extinction can be improved MR Simulation  Can we estimate the extinction using simulation?  Difficult…  Impossible to trace >109 particles 11 Acceleration 160kV constant 0turn,0s,Bf=0.046 3GeV 82600turn,0.4414s,Bf=0.047 4000turn,0.02154s,Bf=0.049 3GeV 482800turn,2.54086s,Bf=0.037 30GeV 7450turn,0.04011s,Bf=0.050 Extraction/Transport Extracted Beam Size Acceptance at MR slow extraction line and transport line is 25pmmmad  Beam size shrink by adiabatic damping is SMALL in 38GeV acceleration   Nominal scenario  space charge tune shift: -0.24 (RCS), -0.2 (MR)  144p (0.4GeV)  54p (3GeV)  35p (8GeV) 1.5 times 1.5times  Strategy  Keep MR rep. rate as high as possible  reduce particle number in the bunch to suppress space charge effect  Accelerate beam with smaller emittance than nominal  This can be achieved by  reducing painting area in RCS  narrowing transport line and MR collimator apertures Possible RCS Painting and MR Operation Pattern  0.16x1014 ppb (1/2.6 of designed value)  144p(0.4GeV)  36p (3GeV) 15p(8GeV)  RCS tune shift -0.046  93p(0.4GeV)  23p (3GeV) 10p(8GeV)  RCS tune shift -0.072  Need measurement  MR operation pattern  8GeV extraction  7mA, 56kW  RCS: h=1 (1 bunch)  MR: h=9 (4 bunch), 4 batch injection  Need 6 RF cavities operational  (currently 4 in operation with 1 spare) Extraction  Same with normal slow extraction  Can we keep bunch structure during slow extraction process?  Test of “normal” slow extraction at 30GeV is scheduled on 27/Jan Bunched Slow Extraction Before extraction at ESS Extracted beam at ESS 70nsec  8GeV energy  h=9, RF cavity ON, 210kV  EL=3eVs, matched ellipse MARS Simulation Model of the ESS Uniformly distributed beam (H:80mm, V:20mm) hits the ESS wires normally Protons scattered at the ESS wires (MARS) 40cm downstream from ESS exit Scattered to circulating side Scattered to extracted side “real loss” = N(hitted p)-N(scattered p)/N real loss 0.14%=1kW remaining protons ・scattered to extracted side (one pass) ・scattered to circulated side (circulate in the ring) 4500 4000 3500 3000 2500 2000 1500 1000 500 0 -6 -5.9 -5.8 -5.7 -5.6 -5.5 -5.4 -5.3 -5.2 -5.1 -5 Transport to the Target  Detailed study is not started yet  Probably COMET needs external- extinction device, like AC dipole, to improve the extinction after extraction  The transport line must be long enough (50-100m) to include necessary equipments.  R&D work is in progress by the COMET group in collaboration with the Mu2e group Status of J-PARC Accelerator  Successful acceleration to 30GeV  Preparation of slow extraction in Jan-Feb  Test of bunched slow extraction  Extinction measurement 21 Exp. Hall  The hall itself is ready.  Beam line construction is in progress  4 secondary beam lines are planned to be built  1 primary beam line in (near) future 22 30GeV 8GeV A possible layout… 23 Summary  J-PARC proton acceleration for COMET  Dedicated beam bunch configuration with bunched slow extraction  Scheme (I) can be tested in 2009  Extraction/Transport  possible area layout Bunch length Internal Extinction Device AGS internal extinction test (from BNL K. Brown slide)  Stripline AC dipole at 80 kHz excites coherent vertical betatron resonance  Fast (100 ns) kickers cancel AC dipole at the bunches  Kicker duty factor is low 100 ns / 2.7ms = 4%  Concept tested in FY98 using existing AC dipole and kickers