Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
e8 / PPA Solar PV Design Implementation O&M 2-4. Solar Panels 1 Marshall Islands March 31-April 11, 2008 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Solar Panel Power Rating • Rated in Watts Peak (Wp). This is the number of Watts power that the panel should produce if it is exposed to 1000 W/m2 of sunlight coming straight into the clean panel while there is a cell temperature of 25ºC and an air mass of 1.5. Power is delivered to the load at the maximum power point of the panel (the optimum loading) 2 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Rating Measurement Standards • 1000 Watts per square meter of solar energy • • Energy is falling at right angles onto the panel • Cell temperature of 25 degrees Celsius • Air Mass of 1.5 (sun angle about 46° from vertical) • Clean panel surface • Load taken from panel at maximum power point 3 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Actual Panel Output • Solar energy almost never is great enough to provide 1000 W/m2 of solar radiation. Typically 800-900 W/m2 is the highest seen on clear days at noon. • In the tropics, solar cells are 50ºC to over 60ºC. Higher cell temperatures result in lowered output of 10% to 15% over rated values • Panels rarely face directly toward the sun, surface reflections increase and output decreases as a result • There is often a mismatch between the load and the panel resulting in a few percent reduction from the rated value. 4 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Panel Types • Single Crystal construction. Each cell is a single crystal of silicon. Oldest design, highest efficiency. Round cells initially but may be cut square. Panel made up of many (usually 36) cells connected in series. Very reliable. • Polycrystralline construction. Each cell includes several large crystals of silicon. Cells can be any shape. Almost as high efficiency as single cells. Panel made up of many (usually 36) cells connected in series. Excellent reliability. • Thin film construction. Silicon or other PV material is put in a very thin layer onto metal or plastic. Mass production is relatively easy and theoretically can be cheaper than crystal based panels. Efficiency low to medium. Reliability varies from poor to good. Sometimes called “amorphous” panels. 5 e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 Panel appearances Single crystal cell Polycrystalline Cells Thin Film panel 6 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Panel construction • Top layer is glass or in some cheap panels, clear plastic. • The middle layer is the active PV material. In the case of crystalline cells, 36 individual cells are connected in series to make a panel for charging a 12V battery. Each cell produces about 0.5 to 0.6 volts. The area of the cell determines the Amperes it can produce. • Backing. Typically a special plastic called Tedlar though sometimes glass. Thin film panels may have a backing that is ceramic or metal as well as possibly glass or plastic. • Cells are embedded in a clear plastic material between the top layer and the bottom layer. This is called the encapsulant. 7 e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 Panel construction Typical solar PV panel construction cross section 8 e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 Terminology 9 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Recommended specifications • Panels – Must have an output adequate to bring the battery to full charge several times a week – Screw type wire terminals with lock washers – 36 cells or more – Meet international standards for construction and are certified by testing at an international test center 10 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Key Characteristics • Number of cells (must be at least 36 for SHS) or it will not be very effective in charging a 12V battery • Voc = the open circuit voltage which is the voltage across the terminals with no load attached • Isc = Short circuit current which is the Amperes measured directly across the terminals with no load attached • Impp= Current delivered at the maximum power conditions under standard conditions • Vmpp= Voltage delivered at the maximum power conditions under standard conditions Note that Impp X Vmpp = Wp 11 e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 Voltage-Ampere Relationship (IV Curve) 12 e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 Solar intensity affects mainly current 13 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Connecting panels for increased voltage and amperage • Connecting panels in series (+ terminal of one panel connected to – terminal of the next) results in adding the voltage of the series connected panels • Connecting panels in parallel (+ terminal of one panel connected to + terminal of the other and – terminal of one panel connected to – terminal of the other) results in adding the amperes produced by each panel 14 e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 Sun’s movements over the year 15 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Proper Orientation • Facing toward the Equator (South in the North Pacific) • Tilted about the same number of degrees as the latitude of the site • Never tilt less than 5 degrees because fast water runoff is necessary for cleaning. 10 degrees is better. 16 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Shading • Output from panels in the shade is a small fraction of the output from a panel in the sun • Even shading a few cells on the panel will greatly reduce the output from the panel • No shade should be on the panel from 0900 to 1500 17 e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 Be careful of shading due to changing sun position 18 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Heat effects • Every three degrees C (5.4F) of temperature rise in a PV cell lowers the output of a PV panel by 1%. • Keep panels as cool as possible to prevent power loss due to overheating • NEVER mount solar panels flush on any surface, if at all possible provide at 6 inches (150mm) or more of ventilation space underneath panels, especially on metal roofs and never less than 2.5 inches (60mm). 19 e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 Diodes 20 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Use of Diodes • Bypass Diode - Used to take shaded portions of a panel or array out of the circuit by bypassing cells that are producing electricity at a much lower rate than others. Many panels come with by-pass diodes already installed. • Blocking Diode – used to prevent back flow of electricity from the battery to the panel or to isolate the panel connections from the battery so a short at the panel does not short the battery. Often not needed 21 e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 Use of Blocking and Bypass Diodes 22 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Increasing Array Voltage • So two panels intended to charge a 12V battery can be connected in series to charge a 24V battery. Series connection will work well only if the panels have the same ampere rating. 23 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Increasing Array Current To increase the amperes available, connect the panels in parallel. As long as the two panels have the same voltage it will work ok 24 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Panel Mounting Rules • Face south and tilt to latitude but no less than 10 degrees • Must have ventilating air passing underneath the panel • No shade any time of the year between 0900 and 1500 • Mounting must use marine grade stainless steel fasteners that isolate aluminum panel frames from the roof. No aluminum can be allowed to touch a metal roof. • Mounting arrangement must be strong enough to survive storms yet simple enough to allow access to panel connections without major dismantling of the array. 25 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M Adequate Panel Size • Panel size needs to be fitted to the requirement of the load that will be powered. • Modest oversizing of the panel can dramatically increase system reliability, increase battery life and lower maintenance costs 26