Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Techniques Used in DoD Projects (applicable to any project) •Gantt charts •WIP tracking •Database Connectivity •Tanks Ship Design Newport News, Va. USS Monitor ProModel – USS Monitor (not really) Gantt charts • Write to Excel – Start/Stop times – Attribute data – Other stuff • Use ProModel tools to generate Gantt Chart Gantt charts WIP tracking • Write a Log file (.CSV) of Entries & Exits • Use Excel to: – Filter for a Time Snapshot – Create a Pivot Table… Use Pivot Table Wizard to compare Entry vs. Exit – Plot as needed WIP tracking WIP tracking WIP – Quantity of Widgets in Storage Locations Database Connectivity • Array Import – Already Available – – – – XLS Worksheet Range Good… But must Open/Close XLS each time • Array Import – Database (NEW!!) – Connection String • Standard protocol • www.connectionstrings.com – Query or Store Procedure • SQL • Excel range • (other spec) – Better… Does not need to open XLS Database – Connection Strings Database - Query or Store Procedure Connection String Query or Store Procedure Tanks • Subroutines • Very Powerful & Flexible • Requires programming skills Tanks