Download Pre-Installation Manual SkyVision Linx 300 Integration Control System TEC-R-0047 REV1

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Ground (electricity) wikipedia , lookup

Audio power wikipedia , lookup

History of electric power transmission wikipedia , lookup

Electrification wikipedia , lookup

Alternating current wikipedia , lookup

Earthing system wikipedia , lookup

Voltage optimisation wikipedia , lookup

Power engineering wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Power over Ethernet wikipedia , lookup

Distribution management system wikipedia , lookup

National Electrical Code wikipedia , lookup

AC adapter wikipedia , lookup

Mains electricity wikipedia , lookup

Home wiring wikipedia , lookup

Telecommunications engineering wikipedia , lookup

Transcript
Pre-Installation Manual
SkyVision Linx 300
Integration Control System
TEC-R-0047 REV1
10/07/2014
Distributed by:
US - SKYTRON
5085 Corporate Exchange Blvd. S.E.
Grand Rapids, MI 49512 (616) 656-2900
www.skytron.us
The base language for this document is ENGLISH. Any translations must be from the base language document.
Printed copies are not controlled documents.
Although current at the time of publication, SKYTRON'S policy of continuous development makes this manual subject to
change without notice. If current manuals are required, contact your local SKYTRON representative or contact SKYTRON
directly at the distribution addresses listed above.
TABLE OF CONTENTS
TITLE
Page 1
PAGE
SECTION 1. INTRODUCTION........................................................................................................ 3
SECTION 2. REQUIREMENTS....................................................................................................... 4
2-1.Environmental........................................................................................................................... 4
2-2.Power .................................................................................................................................... 4
2-3.Grounding ................................................................................................................................ 4
2-4. Rack Mounting.......................................................................................................................... 5
2-5. Display Power Management.................................................................................................... 10
2-6. Optional Equipment................................................................................................................. 10
2-7. Remote Rack Locations.......................................................................................................... 11
2-8.Connections............................................................................................................................. 12
2-9.Network................................................................................................................................... 16
SECTION 3. Installation RESPONSIBILITIES .............................................................................. 18
3-1. SKYTRON Responsibilities..................................................................................................... 18
3-2. Customer Responsibilities....................................................................................................... 18
SECTION 4. REVISION HISTORY................................................................................................. 23
SkyVision Linx 300 Pre-Install• REV1
Page 2
SkyVision Linx 300 Pre-Install • REV1
Page 3
SECTION 1.INTRODUCTION
The SKYTRON SkyVision Linx 300 Integration Control System installation can vary according to the
specific equipment needs of the OR facility. What is common in all installations is that video and data
input sources are routed to various outputs such as displays, video recorders, or networks providing
communication and video conferences.
This SkyVision Pre-Installation Manual provides an overview of typical installation considerations and
specific installation requirements associated with a SkyVision system.
Only SKYTRON certified technicians are authorized to install a system. The SkyVision installation team
may consist of two (2) or more technicians who coordinate with the hospital staff and local subcontractors
to complete an installation. Technicians follow specific installation details mandated by the customer and
specified in the SkyVision OPI (Order / Production / Installation) document. SKYTRON supports SkyVision
installations with thorough documentation, classroom training, and technical support.
SkyVision Linx 300 Pre-Install• REV1
Page 4
SECTION 2.REQUIREMENTS
2-1. Environmental
The SkyVision system must be stored and operated in a clean, dust free environment. Ambient room
temperatures should be maintained between 60˚ and 75˚ Fahrenheit with non-condensing humidity
between 20% to 50%.
The SkyVision Linx 300 system components will generate up to 2900 BTU's/hr. when fully equipped and
under maximum load during peak operating times. Mechanical and HVAC designs of the SKYTRON
Nurse Documentation Center (NDC), SORIC system, and Third Party provided versions must address
heating, ventilation and exhaust requirements in a manner consistent with the operational requirements
of the SkyVision system. When installing the system within custom cabinetry or a NDC, a minimum of
50 cfm through a 12" square opening is required for constant return HVAC. This will allow the systems
to operate within the equipment temperature specifications and ensure product performance, reliability,
and longevity.
2-2. Power
The SKYTRON Linx 300 System requires two (2)120VAC/20A, GFCI protected outlets. One circuit is
dedicated to the component rack and the second circuit is dedicated to the monitor power supplies.
All receptacle outlet strips, adapters, receptacle covers, and faceplates shall be marked with the following
words or equivalent:
WARNING - TECHNICAL POWER
DO NOT connect to lighting equipment
For electronic equipment use only
60/120VAC
GFCI protected
The Uninterruptable Power Supply (UPS) that is provided for power conditioning on the Linx 300 system
is not designed for use with Isolated Power Supply systems.
2-3. Grounding
SKYTRON requires a minimum 10 AWG copper ground wire to be provided to the 12" x 12" junction box
for connection to the equipment rack.
Refer to Article 647.6(B) (Grounding Conducters Required for Sensitive Electronic Equipment) of the NEC.
Permanently wired utilization equipment and receptacles shall be grounded by means of an equipment
grounding conductor run with circuit conductors to an equipment grounding bus prominently marked
"Technical Equipment Ground" in the originally branch circuit panel board.
SkyVision Linx 300 Pre-Install • REV1
Page 5
2-4. Rack Mounting
The SKYTRON SkyVision System is offered in a single 18U wall mounted rack, that does NOT stand on
the floor, or as part of a NDC in two (2) 12U racks.
NOTICE
For Siesmic mounting specifications, refer to the Middle Atlantic Products
letter for "Seismic Certification of the DWR Series Wall Mounted Electronics
Rack Enclosures" available on SkyNet.
a. Rack - 18U Wall Mount
Overall Width
Overall
Height
Overall Depth
Weight
Capacity
Minimum
Structural
Requirements
Mounting Hole
Spacing
23-3/8”
[594mm]
38-1/2”
[978mm]
26-5/16”
[668mm]
250 lbs
500 lbs
16”
[406mm]
Minimum Clearance - 6” from non-hinged side, 20” from hinged side, 4” on top and bottom.
NOTICE
It is the responsibility of the contractor to provide sufficient backing/studs in
the wall to support the rack (the rack does NOT stand on the floor).
An alternative to mounting directly to the studs is to mount plywood to the entire wall and use toggle bolts
to mount the rack to the plywood.
Whatever method is used to mount the rack, the contractor is responsible for making sure it will hold the
minimum structural required load of 500 pounds.
SkyVision Linx 300 Pre-Install• REV1
Page 6
6" MIN.
CLEARANCE
20" MIN.
CLEARANCE
WALL
6-1/2"
26 5/16”
90°
90°
C
F
WALL
WALL
20-1/2"
D
E
G
H
CONDUIT
BOXES
K
(4) MOUNTING
HOLE LOCATIONS
B
J
L
BxB
B
H
D
E
G
A
Letter
Dimension
A
B
C
D
E
F
G
H
I
J
K
L
38-1/2"
12-1/2"
22-3/4"
1-3/8"
16"
5-3/8"
2-11/16"
13"
4"
33-1/4"
5-7/8"
4-3/8"
I
F
RACK
Figure 1.
Rack Mounting and Junction Box Location (Left-Hand Swing Cabinet)
SkyVision Linx 300 Pre-Install • REV1
Page 7
20" MIN.
CLEARANCE
6" MIN.
CLEARANCE
WALL
6-1/2"
26-5/16"
90°
90°
C
E
D
WALL
WALL
20-1/2"
F
(4) MOUNTING
HOLE LOCATIONS
G
CONDUIT
BOXES
H
K
J
B
B
L
D
E
H
G
BxB
A
Letter
Dimension
A
B
C
D
E
F
G
H
I
J
K
L
38-1/2"
12-1/2"
22-3/4"
1-3/8"
16"
5-3/8"
2-11/16"
13"
4"
33-1/4"
5-7/8"
4-3/8"
F
I
RACK
Figure 2.
Rack Mounting and Junction Box Location (Righ-Hand Swing Cabinet)
SkyVision Linx 300 Pre-Install• REV1
Page 8
12" x 12" x 4"
JUNCTION BOX
(PROVIDED BY
CUSTOMER) TO BE
ROUGHED IN BY THE
CONTRACTOR.
MOUNT THE POWER
OUTLETS IN BOX AS
SHOWN.
10 AWG GREEN
STRANDED WIRE
Figure 3.
Left-Hand Swing Installation with Junction Box Termination
SkyVision Linx 300 Pre-Install • REV1
Page 9
b. Nurse Documentation Center (NDC)
Additional NDC installation information can be found for the SKYTRON Model SORIC 48 and SORIC 72
in the SKYTRON SORIC Installation Manual.
NOTICE
NDC systems require a minimum 50 cfm HVAC ventilation system.
MOUNT POWER
OUTLETS AS
SHOWN
CENTER OF 12” X 12” X 4”
JUNCTION BOX IS
LOCATED 12” IN FROM
THE SIDE AND 15” UP
FROM THE FLOOR
REAR CABINET TO
CABINET CONNECTIONS
REQUIRE 15 FOOT LONG
CABLES.
50 CFM HVAC VENTILATION
AIR SYSTEM (DUCTS)
IF THE JUNCTION BOX MUST
BE LOCATEDD ON THIS SIDE,
THE CONTENTS OF EACH
RACK MUST BE SWITCHED.
THE CONDUITS MUST EXIT AT
THE DIGITAL MATRIX SWITCH.
Figure 4.
SkyVision Linx 300 Pre-Install• REV1
NDC Junction Box Location
Page 10
2-5. Display Power Management
•
The SKYTRON Panasonic and Foreseeson's (FSN) displays can be powered in one of two ways:
• Mount the low voltage power supply onto the display bracket powered by a low leakage 120VAC
power line (P/N H5-010-71) run through the boom arm. Mounting the power supply in the back of the
display provides open service access to the power supply. Mounting the power supply at this location
may not be desirable by the customer for aesthetic reasons, therefore, customer approval is required
for this mounting configuration.
• Place the low voltage power supply in a hospital provided NEMA 4 enclosure located in the ceiling
or at the equipment rack and run the low voltage power line through the boom arm to the display.
• The Optik View 24" displays come with a power supply and includes 75 feet of cable. The power
supply should be located remotely, such as a hospital provided NEMA 4 enclosure (supplied by others)
located in the ceiling.
• The remote location of the FSN 24" and 26" display power supply is limited to 75 feet (cable length)
(PN MON-CBL-001).
• The remote location of the Panasonic 26" display power upply is limited to 90 feet (cable length)
(PN DJ-NC0275)
• For integration installations where the rack is within a 75 feet (cable length) of the display, the
power supply can be located in the rack. If not, a NEMA 4 encased power supply in the ceiling is
recommended (supplied by others).
• The minimum size NEMA 4 enclosure for each power supply is 14”L x 12”W x 7”H (L-Com Global
Connectivity – Model: NB1207-10FS-UL or equivalent).
• Appropriate power supplies and cables required for displays not provided by SKYTRON must be
provided by the equipment vendor to meet the specific needs of the display location.
• Not all displays use low voltage power supplies. Larger displays (typically 32" and above) normally
use direct 120VAC input from an outlet as they are intended to be wall mounted. Remote cable kits are
not intended for use with these displays as they do not use external low voltage power.
2-6. Optional Equipment
a. Image/Video Capture Devices
The SkyVision system offers a Digital Capture Streaming System ( SVIS-DCSS) for digital capture and
streaming, however, some hospitals will maintain existing capture devices and cameras.
When the capture device is located close to the camera, connections can be made by a short copper cable
(provided by the Minimally Invasive Surgery (MIS) vendor). Typically, the capture device is located at the
nurse’s station, far from the camera. The appropriate cable between the camera and the capture device
must be provided by the equipment vendor. The SkyVision system will process the capture device output
signal, rather than the camera output signal (to maximize functionality), and route the output signal, as
limited by the technology of the capture device unless specified otherwise on the OPI document.
If a printer is used with this capture device, the cable between the capture device and the printer is supplied
by the hospital or by the MIS vendor, if the printer was part of the purchase agreement.
SkyVision Linx 300 Pre-Install • REV1
Page 11
b. Optional Remote Trigger Image/Video Capture
Capture devices specific to endoscopic cameras allow the surgeon to capture images or video using the
trigger on the camera. This method is limited to capturing only the camera source as the surgeon would
need to have the camera in hand when capturing. This is not a standard option to integrate with SkyVision
because of the many endoscopic vendors. Additionally, the SkyVision foot pedal option (SVIS-FTSW or
SVIS-WFTSW) can be used to capture any source that is set as the "Capture Source" at the touch panel.
The foot pedal is an available option in a wired or wireless model. If capturing endoscope images with
the endoscope trigger is required, this must be specified by the sales representative as a "special" on the
OPI documentation. The hospital must supply SKYTRON with the make and model number of the camera
and capture device so SKYTRON can verify compatibility, proper operation, and provide the required
items to quote.
c. Optional Keyboard/Mouse Switch
The KM Switch (SVIS-KM) allows a single keyboard and mouse to control up to four (4) PCs or one DCSS
and three (3) PCs.
When a DCSS is purchased in addition to the on-board PC, the KM Switch must be quoted. If the hospital
uses their PCs instead of purchasing the SkyVision PCs, they may use their keyboard and mouse instead
of the SkyVision keyboard and mouse. The hospital computer can be placed anywhere in the room with
their keyboard, mouse, and monitor. If they would like to use the SkyVision keyboard and mouse, a KM
Switch is required and the hospital PC must be located within 10 feet of the rack.
d. Additional Touch Panels
Optional second and/or third touch panels (SVIS-SECTP) may be selected with a SkyVision system
to enable the system to be operated from more than one nurse documentation station location. In this
configuration, the second and/or third touch panels are routed through the primary touch panel through
VNC connections.
2-7. Remote Rack Locations
The stock cable length for a SKYTRON SkyVision System installation is 100 feet. 200 and 300 feet cable
lenghs may be selected from the OPI document if longer cable lengths are required.
For installations requiring greater distances than 300 feet, consult with the SkyVision Product Manager
so the options can be specified and project details/requirements resolved.
SkyVision Linx 300 Pre-Install• REV1
Page 12
2-8. Connections
The SkyVision system connects multiple types of video sources (VGA, DVI, SDI, HD-SDI or S-Video/
Composite) to the control rack through conduit runways over single strand multi-mode optical fibers via
source conversion faceplates (Figure 5) located near the source. The conversion faceplates are installed
in the boom arm equipment carriers or in double-gang electrical wall boxes (Figure 6) depending on the
location of the source. The conversion faceplates convert a copper wire signal (digital or analog) to a
fiber-optic digital signal. Low voltage power lines are the only other type of connection utilized to and from
the SkyVision system. Copper wiring is only employed between components at the rear of the SkyVision
control rack. See Figure 7 and for a typical system build drawing set (plan and elevation views) that shows
a layout of the affected room(s), equipment, and cable routing.
Figure 5.
Conversion Faceplates
SkyVision Linx 300 Pre-Install • REV1
Page 13
4” x 4” x 3-1/2” DEEP DOUBLE-GANG
ELECTRICAL WALL BOX
RACO MODEL 256 OR EQUIVALENT
GARVIN 52181-S
RAC0 256
SINGLE-GANG MUD
RING
Figure 6.
SkyVision Linx 300 Pre-Install• REV1
Electrical Boxes
Figure 7.
UTILITY / MONITOR BOOM
ANESTHESIA BOOM
B
C
INITIAL:
DATE:
TO NETWORK
A
5
A
2
8
CAUTION
THIS BOOM HAS
ROTATIONAL
CONFLICTS
SkyVision rack requires a 12" sq. x 4" deep wall box per SkyVision spec. supplied by contractor.
Network connections installed to rack by others.
Structural support for SkyVision rack designed by engineer of records to support 500 lbs. of load.
Mounting hardware supplied by others to meet support requirements.
SkyVision Notes:
•
•
•
•
* IF SKYVISION IS APPLICABLE REFER TO
THE LAST PORTION OF BOOM PACKAGE*
EQUIPMENT BOOM WITH LIGHTS
A
EQUIPMENT SCHEDULE
DESCRIPTION
ID
7'
10
C1B
8
A A
6 9
8
2'-6"
11
3
4'-6"
8
6'-6"
ACME HOSPITAL
*SITE SPECIFIC LAYOUT*
IN THE EVENT THAT FIXTURE LOCATIONS
NEED TO CHANGE PLEASE CHECK WITH
SKYTRON ON THE REVISED LAYOUT LOCATION
PROJECT #: XX-123-XX
FABRICATION
PLOT DATE:
00a
SHEET
ROOM TYPE: GEN OR
REV. #: 1
DESCRIPTION: ROOM LAYOUT
FINAL PLACEMENT OF REQUIRED
CONDUIT IS THE RESPONSIBILITY OF AND
DETERMINED BY THE ARCHITECT.
Page 14
Typical System Build Drawing (Plan View)
SkyVision Linx 300 Pre-Install • REV1
Figure 8.
SkyVision Linx 300 Pre-Install• REV1
FIXTURE WEIGHT:
277 LBS.
Typical System Build Drawing (Elevation View)
INITIAL:
DATE:
NOTE: ALL JUNCTION BOXES AND
CONDUIT TO BE SUPPLIED BY
CONTRACTOR .
HVAC Required to maintain
Storage cabinet temperature not to
exceed 90degrees Fahrenheit. Airflow
to be adjusted accordingly
FLOOR
BE ACCESSIBLE FROM
THE EQUIPMENT BOOM
ACCESS PANEL. REFER TO
INDIVIDUAL EQUIPMENT
BOOM FOR MORE
INFORMATION.
• THESE CONDUITS MUST
EQUIPMENT (2" CONDUITS)
TERMINATED WITH
INSULATED BUSHINGS
AND PULL STRINGS WITHIN
18" OF THE CENTER OF
THE CEILING MOUNT.
• CEILING MOUNTED
GENERIC MOUNT SHOWN
ID
A
B
C
D
7**
8
9
10
11
12
13
14
4
5
6
3
2
ID
1
4" ABOVE
FINISHED FLOOR
AUDIO PACKAGE
FINISHED CEILING
60" ABOVE
FINISHED FLOOR
ITEM
DEVICE POWER
SKYVISION POWER
GROUND LEAD
P.O.E.
ITEM
SKYVISION ENCLOSURE
CONDUIT DIAMETER
N/A
N/A
N/A
N/A
TERMINATION
PER ENGINEER
PER ENGINEER
PER ENGINEER
SHARED PER ITEM 7
** - IF P.O.E. IS NOT AVAILABLE, USE ELECTRICAL REQUIREMENTS ID A
POWER OVER ETHERNET
DESCRIPTION
120V, 20A DUPLEX
(2) 120V, 20A DEDICATED CIRCUITS
LOCATION OF JUNCTION BOX
PER HOSPITAL
SKYVISION JUNCTION BOX
FACILITY GROUND
12" BELOW FINISHED CEILING
TYPICAL 16" ABOVE
FINISHED FLOOR
TO
ELECTRICAL
ELECTRICAL
RACK
HOSPITAL NETWORK
TO
N/A
HOSPITAL NETWORK
RACK
HOSPITAL NETWORK
RACK
LIGHT CAM MOUNT
RACK
RACK
RACK
CONNECTED TO 3.5" BOX
NETWORK
RACK
RACK
RACK
RACK
HOSPITAL NETWORK
RACK
LIGHT MOUNT
LIGHT MOUNT
TYPICAL 55" ABOVE
FINISHED FLOOR
OR PER HOSPITAL
12" BELOW
FINISHED CEILING
TO NETWORK
ACME HOSPITAL
12" BELOW
FINISHED CEILING
TO SURGICAL
LIGHT MOUNTS
HYBRID II SKYVISION CONDUIT LEGEND (NOTE - ITEMS LISTED MAY NOT ALL BE PART OF THIS PROJECT. REFER TO ROOMLAYOUTS FOR SITE SPECIFIC INFORMATION.)
CONDUIT DIAMETER
DESCRIPTION
TERMINATION
LOCATION OF JUNCTION BOX
N/A
SKYVISION ROUGH-IN
12" SQ. X 4" DEEP JUNCTION BOX
SEE ROUGH-IN DETAIL
2"
NETWORK CONNECTIONS
ROUTE TO NETWORK
PER HOSPITAL
TOUCH PANEL
1"
TOUCH PANEL, KEYBOARD, MOUSE
4"SQ. X 3.5" DEEPBOX W/ 1 GANG P-RING
PER HOSPITAL
1"
HOSPITAL NETWORK CONNECTION
HOSPITAL SUPPLIED RJ45 NETWORK JACK
PER HOSPITAL
SKYTRON LIGHT CAMERA CONTROL
1"
LIGHT CAM VIDEO TO RACK
4" SQ. X 3.5" DEEP BOX W/ 1 GANG P-RING
PER HOSPITAL
1"
LIGHT CAM VIDEO FROM CAMERA
4" SQ. X 2" DEEP BOX W/ 1 GANG P-RING
PER HOSPITAL
WALL SOURCE
1"
SOURCE DESCRIPTION
4" SQ. X 3.5" DEEP BOX W/ 1 GANG P-RING
PER HOSPITAL
EXTERNAL COMPUTER
1"
PC VIDEO
4" SQ. X 3.5" DEEP BOX W/ 1 GANG P-RING
PER HOSPITAL
WALL CAMERA
1.25"
WALL CAMERA
4" SQ. X 3.5" DEEP BOX W/ 1 GANG P-RING
12" BELOW FINISHED CEILING
4" SQ. X 2" DEEP BOX W/ 1 GANG P-RING
12" BELOW FINISHED CEILING
SHARED
WALL CAMERA CONTROL
IP CAMERA
1"
IP CAMERA
4" SQ. X 2" DEEP BOX W/ 1 GANG P-RING
12" BELOW FINISHED CEILING
PER EQUIPMENT MANUFACTURER
MOUNT ID
CEILING MOUNTED EQUIPMENT
2"
DESCRIPTION OF MOUNT
WALL DISPLAY
1"
WALL DISPLAY
4" SQ. X 3.5" DEEP BOX W/ 1 GANG P-RING
60" ABOVE FINISHED FLOOR
AUDIO PACKAGE
3/8" FLEX
CEILING SPEAKERS
TERMINATES TO SPEAKERS PER INSTRUCTIONS
FINISHED CEILING PER HOSPITAL
MICROPHONE
3/8" FLEX
MICROPHONE
STUB OUT
FINISHED CEILING PER HOSPITAL
HP NETWORK PRINTER
1"
HP NETWORK PRINTER
4" SQ. X 2" DEEP BOX W/ 1 GANG P-RING
PER HOSPITAL
I-POD DOCK
1"
I-POD CONTROL
4" SQ. X 2" DEEP BOX W/ 1 GANG P-RING
PER HOSPITAL
PER HOSPITAL
WALL CONTROL
0.75"
WALL CONTROL - LIGHT INTENSITY
SINGLE/DUAL - 10"H x 8"W x 5.875"D
TRIPLE - 13.5"H x 10"W X 6.375"D
PER HOSPITAL
MOMENT LOAD: 600 FT. LBS.
23 3/16" ABOVE
FINISHED FLOOR
MICROPHONE
FINISHED CEILING
TO LIGHT CAMERA MOUNT
PROJECT #: XX-123-XX
SUBMITTAL
PLOT DATE:
S1a
SHEET
MDL: SVIS-LINX
QTY.: 1
REV. #: 0
DESCRIPTION: SKYVISION ELEVATION
ELEVATIONS SHOWN BELOW ARE GENERIC
AND PROVIDE TYPICAL ELEVATIONS FOR
EACH ITEM.
Page 15
Page 16
2-9. Network
a. Network Drops and Required Ports
Up to eight (8) Static IP network drops are required for the following components (if installed), to enable
full system function, configuration, and diagnostics.
Required or
w/Option
Device
Lan Drop
Location
TCP Ports
Required
UDP Ports
Required
Required
Primary
Touch Panel
Touch Panel
22
SVIS-AUD
Audio DSP
(Nexia)
Rack
12001
12000
SVIS-DCSS
DCSS
Rack
21, 22, 80, 443,
554, 3306,
(10000 - 10400
and 11000 11400 are only
for DCSS ot
DCSS streams)
6970
through
6999
SVIS-OBC
PC1
Rack unless
hospital provided
and not at rack
Standard
SVIS-OBC
PC2
Rack unless
hospital provided
and not at rack
Standard
SVIS-OBC
PC3
Rack unless
hospital provided
and not at rack
Standard
w/ hospital
provided
Network
Printer
Network
Printer
Printer Location
Standard
Notes
For DCSS to DCSS (room
to room) streaming, the
network mus pass multicast
addresses in the range of
239.192.0.0 to 239.193.0.0
b. Analog Phone Line Drop
One anlog phone line is required for the audio conference option
Required or w/Option
Device
Drop Location
SVIS-AUD
Audio DSP (Nexia)
Rack
SkyVision Linx 300 Pre-Install • REV1
Page 17
c. Minimum Network Bandwidth (DCSS)
Use the chart below to determine the minimum required bit-rate needed for the resolution and frame-rate
desired. The bit-rate in kilo bits-per-second, defines the maximum bit-rate that the encoders may utilize
in creating the media stream.
The following table lists the minimum recommended bit-rates for high quality video:
Capture
Resolution
Minimum Bit
Rate Required
Frame Rate
Recording
GB/Hr.
DVD Capacity
DVD Burn Time
(per/hr of video)
640x480
VGA
768 Kb/s
30 fps
0.33
720 min.
1 min. 46 sec.
800x600
SVGA
1500 Kb/s
30 fps
0.66
415 min.
2 min. 10 sec.
1024x768
XGA
3000 Kb/s
30 fps
1.32
215 min.
3 min. 9 sec.
720p
3500 Kb/s
30 fps
1.53
188 min.
3 min. 25 sec.
1280x1024
SXGA
4000 Kb/s
30 fps
1.75
160 min.
3 min. 42 sec.
1080p
10000 Kb/s
30 fps
4.4
65 min.
7 min. 3 sec.
d. VPN and Remote Diagnostics
The following ports must be open for remote VPN and diagnostics:
•
5900 - Remote VNC
•
3000 - Remote Diagnostics
SkyVision Linx 300 Pre-Install• REV1
Page 18
SECTION 3.Installation RESPONSIBILITIES
3-1. SKYTRON Responsibilities
1. SKYTRON requires a minimum of 60 days delivery time from receipt of signed drawings and
OPI document for manufacturing of the proposed SkyVision system.
2. SKYTRON will provide customer with the appropriate signal cable and wiring for the system
described in this proposal.
3. SKYTRON will provide customer with a suggested conduit layout drawing for the system described
in the proposal.
NOTICE
An inspection and evaluation of the installation site must be performed and
the SkyVision Pre-Installation Evaluation form must be completed prior to
the arrival of installation technicians (see attached sample form).
4. SKYTRON will provide the appropriate number of specialized technical staff to complete the
cable terminations, equipment rack assembly, and testing of the completed SkyVision system.
5. Installation per unit includes two (2) full days of clear access to each room for cable pulling and
terminations, plus at least two (2) days for fitting of connectors, final system configuring, system power
up, and complete system testing.
6. Installation should take place on consecutive days and must be coordinated by a customer
representative.
7.
Installation will include mounting the SkyVision rack if necessary.
3-2. Customer Responsibilities
1. Customer will provide SKYTRON with the appropriate room drawings to include plan, electrical,
and mechanical drawings.
2. Customer will be responsible for supply and installation of all conduit and electrical junction
boxes.
3.
Customer will provide proper HVAC ventilation of NDC compatible with system requirement.
4.
Customer will comply with grounding requirements.
5.
Customer will provide a dedicated and isolated electrical supply to the SkyVision system.
6.
Customer will be responsible for supplying all specified junction boxes.
7. Customer will be responsible for supply and installation of drywall and backing for installation of
wall or ceiling equipment respectively.
8. Customer will be responsible for supply and installation of appropriate nurse documentation
station(s).
9. Customer will provide SKYTRON with all customer provided equipment source signal specifications
including signal output type, power requirements, and cable connector types.
10. Customer will provide SKYTRON with required IP addressing information as specified on the
OPI document prior to production.
11. Customer will provide SKYTRON with the dates for cable installation, boom and light installation,
and agree on specific dates for SkyVision system installation. Notices for cable installation and system
installation must be given no less than 21 days prior to start of work.
SkyVision Linx 300 Pre-Install • REV1
Page 19
12. At time of installation, all Customer provided systems & equipment must be in place and working
in order for SKYTRON to complete system installation and testing. If customer provided systems are
not in place and working during the SKYTRON installation, delays in the SkyVision installation may
occur and result in additional daily charges of $1900.00 per day, per technician, to be added to the final
invoice. If return trips are necessary due to lack of customer suppled equipment, additional charges
may occur.
13. Customer will assign a designated representative to coordinate installation schedules and approve
the SkyVision installation within ten (10) days of completion of work. Customer representatives from
BioMed, IT, and the OR Director will sign off on completion, which will signal approval of final SKYTRON invoice.
SkyVision Linx 300 Pre-Install• REV1
Page 20
FDA 0900-36 REV0
SkyVision Pre-Installation Evaluation
Facility
Date
PO#
Re Sam
fe p
re le
nc
e
On
ly
The Pre-Installation Evaluation must be completed prior to the arrival of the SkyVision integration
system installation team. This form can be used to describe a multi-room installation if the
details that are room specific can be noted on the final page. In the event this evaluation is
not completed properly and additional visits are required, the customer will be billed at
$1900.00 per day, per technician.
Pre-Install Inspection
The inspection must be performed by one Skytron SkyVision Technician, the local Skytron Account Representative,
the on-site customer contact and pertinent contractor representatives.
Pre-install site evaluation
The evaluation consists of a review of the project documentation during a “walk through” of the entire project site
and completion of the checklist.
** R ETURN VISITS DUE TO INACCURATE / INCOMPLETE INSTALLATION VERIFICATION ARE SUBJECT TO BILLING **
Environmental Considerations:
Do installed Conduit Runs match drawings in both sizing and locations?
Are any conduit runs missing, changed or different from the submittal drawings?
Are the Nurse Document Centers installed and placed in their final location?
Is there a 12” x 12” box for conduit termination installed at the NDC or Rack location?
Are the ceilings installed
Yes or no.
Yes or no.
Fo
r
What is the ceiling material?
Will there be sufficient ceiling / mount access to pull cables through conduit?
Is all drywall work finished?
Yes or no.
Are the finished floors installed?
Yes or no.
Has all work involving dust and paint has been completed? Yes or no.
Is HVAC system completed?
Yes or no.
Yes or no.
Yes or no.
Yes or no.
Yes or no.
Power Considerations:
Will permanent power be live prior to Skytron installers arriving on site?
Yes or no.
Are two 120 VAC, 20A, properly circuit protected, dedicated circuits provided to power each
SkyVision system? Yes or no.
Are properly sized NEMA4 enclosures and proper power circuit provided for all monitor power supplies
that are to be placed above the ceiling?
Yes, no or NA
Page 1 of 3
SkyVision Linx 300 Pre-Install • REV1
Page 21
FDA 0900-36 REV0
Grounding Considerations:
Has proper, 10AWG braided, ground wire been provided to the 12”x12” box?
Yes or no.
Network Considerations:
Are STATIC IP addresses assigned and confirmed? (static IP, subnet mask, default gateway) Yes or no.
What is the hospitals network bandwidth?
If video conferencing is installed, what is the hospitals external IP and are the correct ports open?
IP
Are all required Network drops in place?
ports open?
Yes or no.
Yes or no.
Re Sam
fe p
re le
nc
e
On
ly
Equipment Mounting Considerations:
Is proper backing material installed for wall mounted equipment? (monitors, equipment rack, wall camera)
Yes or no.
Type
Are the Booms installed?
Yes or no.
Non-Skytron Equipment Considerations:
Is there any special or custom equipment the installer(s) may not be familiar with?
Are all customer provided systems and equipment in place and in working order?
Are non Skytron supplied displays on site? Yes or no.
Have proper power supplies been provided for non Skytron displays?
Are proper mounts or adapters provided for monitors?
Yes or no.
Yes or no.
Yes or no.
Yes or no.
** R ETURN VISITS DUE TO INACCURATE / INCOMPLETE INSTALLATION VERIFICATION ARE SUBJECT TO BILLING **
Printed Name:
Date:
Skytron Representative :
Signature:
____________________________________________________
Hospital Representative:
Signature:
____________________________________________________
Contractor Representative:
____________________________________________________
Fo
r
Signature:
Other Representative (A):
Signature:
____________________________________________________
Other Representative (B):
Signature:
____________________________________________________
Page 2 of 3
SkyVision Linx 300 Pre-Install• REV1
Page 22
FDA 0900-36 REV0
Are there any changes or additions not addressed by this list?
Fo
r
Re Sam
fe p
re le
nc
e
On
ly
Notes:
Page 3 of 3
SkyVision Linx 300 Pre-Install • REV1
SECTION 4.REVISION HISTORY
Date
Revision
03/04/2014
0
Initial Release
10/07/2014
1
•
•
Revision History
•
•
•
SkyVision Linx 300 Pre-Install• REV1
Page 23
Page 4, revised Section 2.2 (Power) in its entirety.
Page 4, added additional specification on 10 AWG copper
ground wire.
Page 10, changed "DCSS" to "SVIS-DCSS" as a
clarification.
Page 11 and 16, changed "VIS" to "SVIS" in several places
as a correction.
Page 18, changed "dedicated and isolated electrical
supply" to "GFCI protected electrical supply" in Section 3.2
(Customer Responsibilities).
5085 Corporate Exchange Blvd. S.E.
Grand Rapids, MI 49512 • 616.656.2900 • FAX 616.656.2906