Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
International Development Corp. INSTRUCTIONS FOR FIRST TIME USE: SOLAR LIGHT NEEDS TO CHARGE IN FULL SUNLIGHT FOR 8 - 12 HOURS WITH THE SWITCH IN THE "ON" POSITION TO ALLOW THE RECHARGEABLE BATTERY TO REACH MAXIMUM CAPACITY. If light doesn't turn on, remove battery, wipe both ends with a clean, dry cloth and reinstall battery. Check the battery to ensure that it is making secure contact with the terminals. If this doesn't work, replace with new battery. If the light does not turn on after charging, make sure the slide switch is in the "ON" position. A E B Lights with Crystalline Panels may have a protective film over the solar panel. THIS MUST BE REMOVED PRIOR TO USE. Lights with Amorphous Panels are ready to use. PROTECTIVE FILM Amorphous Panel Crystalline Panel ASSEMBLY & OPERATION C Align tabs on (Part B) with ledges inside (Part A) and turn (Part A) clockwise until tabs are secure. Align tabs on (Part C) with ledges inside (Part B) and turn (Part B) clockwise until tabs are secure. Align tabs on (Part D) with ledges inside (Part B) and turn (Part B) clockwise until tabs are secure. Align (Part E) with the stem (Part F) making contact, turn (Part E) clockwise until secure. Insert the forked end of (Part F) into the ground until stake is fully submerged. NOTE: If the ground is hard and packed, moisten the ground with water before inserting the stake to avoid breakage. Use a rubber mallet (not included), if necessary, to gently tap stake into ground. D Hang assembled (Parts A, B, C & D) onto the hook (Part E). The solar light can be used for both lighting and bug killing purposes. Switch to “LIGHT” for solar lighting or “UV” for bug killing. F CAUTION: WHEN SWITCHED TO ON, THE NET INSIDE WILL PRODUCE A HIGH VOLTAGE WHICH ZAPS BUGS. CAUTION WHEN HANDLING EVEN IN "OFF" MODE. TO CLEAN: NOTE: Do not use water to clean. Push the power switch to the “OFF” position. Remove (Parts C & D) from (Parts A & B), exposing the metal grid. Carefully set (Parts C & D) aside. Clean using a dry soft cloth, an old toothbrush, or canned air. After the metal grid is clean return (Parts C & D) to (Parts A & B). NOTE: Some parts may come pre-assembled. REPLACING THE BATTERY ON/OFF SWITCH LIGHT/UV SWITCH Slide the power switch to the "OFF" position. Rotate (Part A) and remove from (Part B). Using a screwdriver remove the screw from the battery cover (Part G). Remove (Part G). Remove old battery and replace with a new lithium phosphate 3.2V, 400 mAh AA rechargeable battery. Lithium phosphate batteries are available through IDC Westinghouse. Replace (Part G) using the screw removed earlier. Slide the power switch to the "ON" position. For optimum performance, allow battery to charge in full sunlight. SCREW BATTERY COVER G BATTERY WARNING: Do not dispose of lithium phosphate batteries in municipal waste stream or by fire as batteries may explode. Do not open, short circuit, or mutilate batteries. Dispose of batteries in accordance with Local, State, and Federal regulations. Contains no toxic metals. Do not mix old and new batteries. Do not mix alkaline, standard (Carbon-Zinc), or rechargeable (Nickel Cadmium or Nickel Metal Hydride) batteries with Lithium Iron Phosphate (lithium phosphate) batteries. Item # 19072x-xx 02/23/11 E