Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
General Systems Enhancements Presenter: Dinong Sereko Date12 March 2013 Disclaimer • The information, comments and material presented in this presentation are provided for information purposes only. The presentation is not addressing all possible technical or business aspects and does not claim to be complete or exhaustive. • ITS reserves the right to change its business or product development plans as circumstances dictate. • This document may not be reproduced or distributed without the written permission of ITS Holdings (Pty) Ltd. Agenda • • • • • • Access Control iComms Notes Data Storage and Retrieval General Enhancements Space – Session 58 Access Control • USERS-5 – – – – Add termination reason Add date last logged in Update OID when user is terminated Unlock database user and SSO resource when password updated, same on USERS-9 – Report based on USERS-5 • Lock database user for resigned users • USERS-21: Update database password – Except WEB – Update not allowed for ITSCOMP,OC4JADMIN AND ORCLADMIN Access Control • Electronic Application for access – Session 76 Access Control Access Control Access Control iComms • Prevent deletion of system style sheets • GMNT-14 – Made into 1 page – Expand relational operators on conditional paragraphs • Move http requests from PL/SQL to java servlet to improve performance iComms iComms Notes and DRS • NOTES – Allow amendments of a note by a user who has not created the note – Include note content into the reminder email • Data storage and retrieval (DSR) – Email a document from the DSR Notes Notes DSR DSR DSR General Enhancements • GMNT-1,2 – Move some options to GMNT-8 • GMNT-8 – Add log file for GCS-1 • GMNT-3 – Print iEnbaler user log • BULKSMS – Use account linked to user on GSMSAPI-1b1 • iEnabler pin request email now includes the person type and person number • Utility to reset batch queues after abnormal shutdown • Report to show user access information General Enhancements General Enhancements General Enhancements General Enhancements Space • SPCS-1: – Include GPS fields – Make the GPS fields required for after the reporting year 2011. • SPCS-4: – Add long building name. Display this long name on SPCSR1-3 and SPOPS-1. – Lift the restriction for Effective Building Year not to be mandatory . – Allow minimum value of Effective Building Year to be 1700 and not 1900. Space Space Space • SPOPS-1: – display the Campus code and Description linked to the Building • SPOPS-1 / STG6MN-2 – Warning if Space-Use Category falls within range that requires stations (as specified by the DHET) – Warning if building not linked to Asset with a Condition Code, Recognition Date – Warning if building has no Effective Building Year • SPSCU-3 / SPOPS-5: Produce a CSV report with extra columns • Validation for Statistical Reporting (SPSCU-3, SPOPS-5 and STG6MN4) – Refine the validations for Buildings against Assets. – Bring the validations for Shadow structure in line with the Standard Structure Space Space • HEMIS-7: – Provide a choice to allow space data to be written to HEMIS even when errors are encountered. – Add GPS coordinates to the CAMPUS file extract for after reporting year 2011. • Condition codes: – SOD ‘AC’ and Subsystem ‘GC’. When Yes, the External Condition codes on GOPS-21 are used – Synchronise ACS-4 and GOPS-21 – HEMIS-7: Use condition code from GOPS-21 or ACS-4 depending on the SOD • SPCOPY-4: Produce a report at the end of SPCOPY4 where data exist in SPOPS-1 for personnel that do not have Offices in PAA table for the reporting year. Thank you